HomeMy WebLinkAboutMFP17002490DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17002490
IVR Number: 17002490
Permit Informa!on
Permit Name:Systematch
Address/Loca!on:05/24/2017Applica!on Date:3123059006Parcel Number:601 S CARR RD
Permit Type :08/25/2017Issue Date:Franchise
Permit Work Class:08/27/2018Expira!on Date :Minor U"lity
Job Number:#243374Franchise Type :Cable
Inspector:Tom Main 206-999-1833
Descrip!on:TIE INTO EXISTING AERIAL SPLICE CASE. OVERLASH (1) 48 ct FIBER OPTIC CABLE ON EXISTING COMCAST STRAND 800 FT
Also proof and pull (1) 48 ct FIBER OPTIC CABLE THROUGH EXISTING COMCAST CONDUIT 910 FT. Overhead approved
with the following condi"ons: 1) Any height viola"ons need to be resolved at the "me of construc"on. All aerial must
have a minimum ver"cal clearance of 15' 6". 2) Any abandoned or unused cable needs to be removed at the "me of
construc"on. 3) Traffic control plan approved. 4) The aerial fiber will be required to b installed underground in the
future when other u"li"es are undergrounded. PRE CONSTRUCTION MEETING REQUIRED.
Revision Same as above, with the addi"on to dig up and repair conduit .
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communica"on Management &
Comcast Cable Holding
B: (215) 665-1700Applicant
Ken Pontelandolfo
Comcast
410 VALLEY Ave NW , SUITE #12,
Bldg C
Puyallup, WA 98371
B: (253) 288-7532
C: (253) 254-9088
Applicant
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
ContactX
ScoJ Nall
SEFNCO Communica"ons Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: BL.041108Construc!on Contractor : SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Scott Warlick10/13/2017MFP17002490Justin Johnson10-18-2017
MFP17002490
Justin Johnson
10-18-2017monday through friday
8:30 am to 3:00 pm
MFP17002490
MFP17002490
MFP17002490
MFP17002490
ROWROW ROWPPPP17722
17804
17803
17810
17818
17819
17811
9806
4200
17906 PP
25'
V
17832
DHS. CARR R
D.
S. CARR RD
.98TH AVE
S.
S. 178TH
S
T
.
END OF ROW DESIGN
SEE SITE DESIGN
145'
455'
55'
153'
246'
OWNER:
- ATTACHMENTS - -MAKE READY-
N/A
POLE#:5316477-165982
PSE CLASS/HT:
POLE TYPE:D
HEIGHT
N/A
N/A
N/A
NEUTRAL
STREET LIGHT
CC
TEL
27'-9"
24'-5"
22'-8"
21'-8"
OWNER:
- ATTACHMENTS - -MAKE READY-
N/A
POLE#:6316463-165980
PSE CLASS/HT:
POLE TYPE:D
HEIGHT
N/A
N/A
STREET LIGHT
CC
TEL
25'-3"
22'-6"
21'-6"
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQCSYSTEMATECH 601 S CARR RD243374PERMIT5 75-1-2017PERMITTAWSDCOMCAST
MATCHLINE - SEE SHT 4
2
2
1
CONSTRUCTION NOTE:
4
5
TIE INTO EXISTING CASE KV07MX1.3A.3A
(SP.WAKV.0147) OVERLASH (1) 48 CT FIBER
OVERLASH (1) 48 CT FIBER
EXISTING VAULT
PROOF AND PULL UNDERGROUND (1) 48 CT
FIBER
3 PULL DOWN EXISTING RISER
6 EXISTING DOG HOUSE
7 END OF ROW DESIGN, SEE SITE DESIGN.
3
4
4
4
4
6
5
7
8 DIG-UP AND REPAIR CONDUIT.
8
8
MFP17002490
SEFNCO COMMUNICATIONS
4610 TACOMA AVE
SUMNER WA, 98390
5/3/17
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JT#243374
To whom it may concern,
SEFNCO Communications has been contracted to design and engineer this project on behalf of Comcast Cablevision.
Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposes to over-lash approximately 799’ of aerial cable along the right of way of S 177th St and 98th Ave S in
order to meet on going service capacity issues.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for
undergrounding this proposed over-lash will not cause substantial adverse impacts to other person or entities in the
immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the
amount of an aerial over-lash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over-lash will not cause substantial adverse impact to other persons or entities in the immediate area.
Over-lashing the cable will be accomplished in a few days, and the residents will not notice any impact.
Comcast will clean up the over-lashed spans as necessary and identify and remove any existing dead cables
along this route.
4. The variance is necessary to prevent and undue hardship due to the increased construction costs if forced to
install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does
agree to underground the cable system, but they are waiving the obligation into the future when all other
utilities are underground to prevent an undue hardship against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements.
Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and
requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities.
If you have any further questions regarding this project please contact me at (253) 266-4944.
Thank you for your consideration in this matter.
Shane Dunaway
Outside Plant Engineer
SEFNCO Communications
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan