Loading...
HomeMy WebLinkAboutA_Franchise_Permit_20170502_v1DEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENT enton Planning Division 1 1055 South Grady Way, 6 1 Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Franchise Job Number: JT# 243374 Phone: 253-288-7540 Contact Name: Ken Pontelandolfo Email: ken_pontelandolfo@cable.comcast.com Job Site Address: 601 S Carr Rd Project Name: Systematech Description of work: Tie into existing aerial splice case. Overlash (1) 48ct Fiber Optic Cable to Existing Comcast strand 800ft. Proof & Pull (1) 48ct Fiber Optic Cable through existing Comcast conduit 91 Oft. Please check all that apply: 0 New Construction ❑ Repair/Relocate N Underground N Overhead ❑ Sidewalk ❑ Street ❑ Open Trench ❑ Bore # of feet: Contractor Name: Sefnco Communications / Shane Dunaway Phone: 253-266-4944 State Contractors license #: On File City of Renton Business license #: SEFNCI*994P9 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and sha Iy with the City of Renton's Trench Restoration and Street Overlay Requirements. " Signature C:: � �)� ) Date 5/2/17 INSPECTIONS SHALL BE REQIJ9.S�PED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. mit vre-Lonsrrucnon meerings snap be scheduled at a maximum of 14 days prior to the iob start date. Plan Review/Development Engineering Site Construction Inspector Development Engineering Manager Date Date Date Approved as submitted ❑ Pre -Construction Meeting required Approved with comments or redlines Camera inspection of utilities required Page 1 I Published: 3/30/2017