Loading...
HomeMy WebLinkAboutMFP17003015DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17003015 IVR Number: 17003015 Permit Informa!on Permit Name:Comcast Cable Communincaon Management and Comcast Cable Holdings Address/Loca!on:06/26/2017Applica!on Date:2434500005Parcel Number:1700 EDMONDS AVE NE Permit Type :10/05/2017Issue Date:Franchise Permit Work Class:10/05/2018Expira!on Date :Major Ulity Job Number:231960Franchise Type :Cable Descrip!on:TIE INTO EXISTING SPLICE CASE AND OVERLASH (1) 48CT FIBER 2527' TO EXISTING COMCAST STRAND PROOF AND PULL (1) 48CT FIBER 437' THROUGH EXISTING COMCAST CONDUIT. Pre construcon meeng required. Overhead Approved with the following condions 1. Any exisng height violaons need to be resolved at me of construcon. New Aerial fiber must have a minimum vercal clearance of 15' 6". 2. All abandoned or unu sed cable needs to be removed at the me of constru con is taking place. 3. Aerial Fiber will be required to be installed underground in the future when other u lies are under grounded. Contacts Name Address PhoneTypeBilling Comcast Cable Communicaon Management & Comcast Cable Holding B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communicaons LLC 1701 JE Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Holly Munyan Horizon Communicaons Inc 6501 212th St SW Lynnwood , WA 98036 B: (425) 361-7802Contractor Business License Number: BL.031429Construc!on Contractor : HORIZCI006DS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 Specialized Billing X ST MATTHEW LUTHERAN CHURCH 1700 EDMONDS AVE NE Renton, WA 98056 Tenant General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐New Construction ☐Repair/Relocate ☐ Underground ☐Overhead ☐Sidewalk ☐Street ☐Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17003015 Scott Warlick 9/25/2017 Justin Johnson 10-2-2017 OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 CITY OF RENTON TRAFFIC CONTROL PLAN PERMIT# PROJECT NAME: KINDERING CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS:FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Horizon Communications Inc.425-361-7802 Holly Munyan 6501 212th st SW, Lynnwood, WA 98036 hmunyan@horizonnw.net 425-582-2926 Holly Munyan 1700 EDMONDS AVE NE, RENTON WA 98056 W OF EDMONDS AVE NE FROM NE 16TH ST TO GLENNWOOD AVE NE 7AM - 5PM TBD 6/2/17 MFP17003015ST MATTHEWS CHURCH 8:30 am to 3:00 pm Monday through Friday Justin Johnson 10-2-2017 NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). SKETCH I -- NORTH -- I DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITT-1 GRAPHIC SCALE 0 5 10 (IN FEET) 1 IN . = NTS -2231960-KINDERINGSITE LOCATION MAP PROJECT LOCATION PROJECT CONTACTS TIE INTO EXISTING SPLICE CASE AND OVERLASH (1) 48CT FIBER 2527' TO EXISTING COMCAST STRAND. PROOF AND PULL (1) 48CT FIBER 437' THROUGH EXISTING COMCAST CONDUIT. Horizon Communications 6501 212th St SW Lynnwood, WA 98036 425-361-7802 DRAWING INDEX DWG.DRAWING DESCRIPTION T-1 Tile Sheet & Project Data A-1 Site Overview TCP1 Traffic Control Plan TCP2 Traffic Control Plan TCP3 Traffic Control Plan PROJECT JOB # & NAME 231960-KINDERING JOB FOOTAGE New Underground - Existing Underground - New Aerial - Aerial Overlash - Interior Conduit - Exterior Conduit - Total - 0 FT 437 FT 0 FT 2527 FT 0 FT 0 FT 2964 FT PROJECT DESCRIPTION ACCESS INSTRUCTIONS 1700 EDMONDS AVE NE RENTON WA 98056 DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITA-1 GRAPHIC SCALE 0 5 10 (IN FEET) 1 IN . = NTS -2231960-KINDERING158'180' 212' 171' 211' 242' 183' 213' 187' 146' 202'202' 110' 110' NE 12TH ST GLENNWOOD AVE NEEDMONDS AVE NEHARRIGNTON AVE NEINDEX AVE NEJEFFERSON AVE NEKIRKLAND AVE NEDH V PROOF AND PULL (1) 48CT FIBER 437' THROUGH EXISTING COMCAST CONDUIT 211' 106' 120' OVERLASH (1) 48CT 624' TO EXISTING COMCAST STRAND OVERLASH (1) 48CT FIBER 1903' TO EXISTING COMCAST STRAND EXIT RIGHT OF WAY 1700 EDMONDS AVE NE RENTON WA R 25 ROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR MOBILE AERIAL WORKPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.NE 16TH STWORK AREA STAGING AREA SHEET NUMBERREVISIONS PERMITJT-231960KINDERING1700 EDMONDS AVE NE, RENTON 98056THIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATIONSHEET NUMBERREVISIONS PERMITTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION ROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR MOBILE AERIAL WORKPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.SE 256TH STWORK AREASTAGING AREASHEET NUMBERREVISIONS PERMITJT-231960KINDERING1700 EDMONDS AVE NE; RENTON 98056THIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATIONSHEET NUMBERREVISIONS PERMITTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITTCP3 GRAPHIC SCALE 0 5 10 (IN FEET) 1 IN . = NTS -2231960-KINDERING Horizon Communications Inc 6501 212th ST SW Lynnwood, WA 98036 6/26/17 To whom it may concern: City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JT# 231960 To whom it may concern, Horizon Communication has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposed to over lash approximately 2,527’ of aerial fiber along the right of way of NE 16th heading East to Harrington Ave NE and South on Harrington Ave where plant will run East on Glennwood Ave NE. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over lash will not cause substantial adverse impacts to other persons or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15-25 times the amount of an aerial over lash on the existing Comcast strand. 2. Potential damage to underground facilities will be increased. 3. Over lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over lashed spans as necessary and identify and remove and existing dead cables along this route. 4. The variance is necessary to prevent any undue hardship due to the increased construction costs if forced to install the proposed extension underground. 5. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are underground to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project, please contact Danny Cooley at (253)686-7592. Thank you for your consideration in this matter. Danny Cooley Construction Coordinator Attachments: 1. Application for ROW permit 2. 11” x 17” Site plan 3. Traffic Control Plan DenisLawMayorCommunity&EconomicDevelopmentC.E.Chip”Vincent,AdministratorSeptember22,2017RhondaResnikComcast410ValleyAveNEPuyallup,WA98371ViaEmail:WAConstructionJointUse@cable.comcast.comSUBJECT:RequestforUndergroundingExemption(JT#231960,1700EdmondsAveNE,Kindering/StMatthewsChurch)DearMs.Resnik:TheCityofRentonhasreviewedyourrequesttograntComcastanexemptionfromRentonMunicipalCode(RMC)4-6-090(C)whichstatesthatallnewelectricalorcommunicationfacilitiesshallberequiredtobeinstalledunderground,pursuanttothestandardsofthesectionofRMC.ComcastproposestohaveHorizonCommunicationsoverlashapproximately2,527linearfeetof48-countCOAXaerialfibertoexistingPugetSoundEnergy(PSE)polesbeginningat1700EdmondsAveNEandcontinuingeastonNE16thStreettoHarringtonAveNE,thenalongthewestsideofHarringtonAveNE,crossingNE12thStreetinconduittoGlennwoodAveNE.TheproposedfiberwouldbeovelashedfromanexistingPSEutilitypoleonGlennwoodAveNEtotheexistingaerialpathcontinuingeastfor624feet.ANALYSIS:TheCityhasconsideredtherequestforanexemptionfromRMC4-6-090(D)(1)(g)iandU.Ordinance5720grantsComcast,therighttoinstallfiberopticcableandrelatedappurtenancesunder,along,over,below,throughandacrossthestreets,avenuesandalleysofCityofRentonwithintheright-of-wayofRenton.Section3.4ofthefranchiseordinancestatesthatifallofthedistributionlinesallthewirelineserviceproviders,suchastelecommunicationsserviceproviders,asdefinedinRCW35.99.010,autilityserviceprovideroraCableOperator(collectively“ServiceProviders”)inanyportionoftheFranchiseAreaareunderground,GranteeshallplaceitsCableSystem’sdistributioncablesundergroundwithinthatarea;providedthatsuchundergroundlocationsareactuallycapableofaccommodatingGrantee’scableandotherequipmentwithouttechnicaldegradationoftheCableSystems’signalquality.1055SouthGradyWay,Renton,WAg8057-rentonwa.gov ComcastJobJTh231960Page2of2September22,2017TheproposalwouldutilizeexistingpolesandattachtotheexistingComcastaerialpath.Asminimumverticalheightclearanceof15’-G”wouldneedtobeprovidedfor,andexistingobsoletecablewouldneedtoberemoved;staffrecommendstheseasconditionsofapproval.Therefore,theCityisgrantinganexemptionwithconditions,perRMC4-6-090(D)(1)(g)iandiiwhichallowsforextensionsofexistingoverheadcommunicationfacilitieswhentherearecontinuingrequirementsforpolesanditisnotlikelythattherewillbeundergroundingintheforeseeablefuture;and,whenthereareexistingoverheadelectricalorcommunicationfacilitiesthatwillnotberemovedandthefacilitiesthatwouldhavebeenrequiredtoberemovedareparalleltothefacilitiesthatwillnotberemoved.DECISION:Therequestedexemptionfromundergroundutilityinstallationrequirements(RMC4-6-090(C)asrequestedbytheapplicantisapprovedsubjecttotheconditionsbelowastherequestcomplieswithexemptioncriteriaofRMC4-6-OgO(D)(1)(g)iandii.ConditionsofApproval:1.Anyexistingheightviolationswouldneedtoberesolvedatthetimeofconstruction.Newaerialfibermusthaveaminimumverticalclearanceof15,-B”.2.Anyabandonedorunusedcablewouldneedtoberemovedatthetimethatconstructionistakingplace.3.Thetrafficcontrolplanrequiresseparateapproval.4.Theaerialfiberwillberequiredtobeinstalledundergroundinthefuturewhenotherutilitiesareundergrounded.Thisdecisiontogranttheexemptionwithconditionsissubjecttoafourteen(14)dayappealperiodfromthedateofthisletterperRMC4-8-110.AnyappealsoftheadministrativedecisionmustbefiledwiththeCityClerk,alongwiththerequiredappealfee,by5:00pm,Oct.6,2017.Sincerely,UJenniferT.Henning,AICPPlanningDirectorcc:CE.“chip’vincent,CEDAdministratorHollyMunyan.hmunyan@horizonnw.netGreggZimmerman,wAdministratorDannyCooley,dannycooley@comcast.net3rianneBannwarth,DevelopmentEngineeringManagerJustinJohnson,civilEngineerIIScottwarlick,EngineeringSpecialistIIHollyPowers,DevelopmentServicesRepresentativePatMiller,constructionInspectionsupervisor1055SouthGradyWay,Renton,WA98057-rentonwa.gov