Franchise Permit: MFP17003015
IVR Number: 17003015
Permit Informa!on
Permit Name:Comcast Cable Communincaon Management and Comcast Cable Holdings
Address/Loca!on:06/26/2017Applica!on Date:2434500005Parcel Number:1700 EDMONDS AVE NE
Permit Type :10/05/2017Issue Date:Franchise
Permit Work Class:10/05/2018Expira!on Date :Major Ulity
Job Number:231960Franchise Type :Cable
Descrip!on:TIE INTO EXISTING SPLICE CASE AND OVERLASH (1) 48CT FIBER 2527' TO EXISTING COMCAST STRAND PROOF AND PULL
(1) 48CT FIBER 437' THROUGH EXISTING COMCAST CONDUIT. Pre construcon meeng required. Overhead Approved
with the following condions
1. Any exisng height violaons need to be resolved at me of construcon. New Aerial fiber must have a minimum
vercal clearance of 15' 6". 2. All abandoned or unu sed cable needs to be removed at the me of constru con is
taking place. 3. Aerial Fiber will be required to be installed underground in the future when other u lies are under
grounded.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communicaon Management &
Comcast Cable Holding
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communicaons LLC
1701 JE Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Holly Munyan
Horizon Communicaons Inc
6501 212th St SW
Lynnwood , WA 98036
B: (425) 361-7802Contractor
Business License Number: BL.031429Construc!on Contractor : HORIZCI006DS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
Specialized
Billing
X
ST MATTHEW LUTHERAN CHURCH 1700 EDMONDS AVE NE
Renton, WA 98056
Tenant
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐ Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MFP17003015
Scott Warlick 9/25/2017
Justin Johnson 10-2-2017
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
CITY OF RENTON
TRAFFIC CONTROL PLAN
PERMIT# PROJECT NAME: KINDERING
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS:FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
Permit Holder agrees to all the following:
•Comply with all traffic regulations of the City of Renton and the State of Washington.
•Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
•Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
•By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Horizon Communications Inc.425-361-7802
Holly Munyan
6501 212th st SW, Lynnwood, WA 98036
hmunyan@horizonnw.net 425-582-2926
Holly Munyan
1700 EDMONDS AVE NE, RENTON WA 98056 W OF EDMONDS AVE NE FROM NE
16TH ST TO GLENNWOOD AVE NE
7AM - 5PM
TBD
6/2/17
MFP17003015ST MATTHEWS CHURCH
8:30 am to 3:00 pm
Monday through Friday
Justin Johnson
10-2-2017
NOTES:
•Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
•The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
•Approved Temporary Traffic Control Plan must be at the work site during work hours.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
•Total road closure lasting more than 24 hours is subject to the approval by the City Council.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
•The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
SKETCH
I
-- NORTH --
I
DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITT-1
GRAPHIC SCALE
0 5 10
(IN FEET)
1 IN . = NTS -2231960-KINDERINGSITE LOCATION MAP
PROJECT LOCATION
PROJECT CONTACTS
TIE INTO EXISTING SPLICE CASE AND OVERLASH (1)
48CT FIBER 2527' TO EXISTING COMCAST STRAND.
PROOF AND PULL (1) 48CT FIBER 437' THROUGH
EXISTING COMCAST CONDUIT.
Horizon Communications
6501 212th St SW
Lynnwood, WA 98036
425-361-7802
DRAWING INDEX
DWG.DRAWING DESCRIPTION
T-1 Tile Sheet & Project Data
A-1 Site Overview
TCP1 Traffic Control Plan
TCP2 Traffic Control Plan
TCP3 Traffic Control Plan
PROJECT JOB # & NAME
231960-KINDERING
JOB FOOTAGE
New Underground -
Existing Underground -
New Aerial -
Aerial Overlash -
Interior Conduit -
Exterior Conduit -
Total -
0 FT
437 FT
0 FT
2527 FT
0 FT
0 FT
2964 FT
PROJECT DESCRIPTION
ACCESS INSTRUCTIONS
1700 EDMONDS AVE NE
RENTON WA 98056
DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITA-1
GRAPHIC SCALE
0 5 10
(IN FEET)
1 IN . = NTS -2231960-KINDERING158'180'
212'
171'
211'
242'
183'
213'
187'
146'
202'202'
110'
110'
NE 12TH ST
GLENNWOOD AVE NEEDMONDS AVE NEHARRIGNTON AVE NEINDEX AVE NEJEFFERSON AVE NEKIRKLAND AVE NEDH
V
PROOF AND PULL (1) 48CT FIBER 437'
THROUGH EXISTING COMCAST
CONDUIT
211'
106'
120'
OVERLASH (1) 48CT 624'
TO EXISTING COMCAST
STRAND
OVERLASH (1) 48CT FIBER
1903' TO EXISTING COMCAST
STRAND
EXIT RIGHT OF WAY
1700 EDMONDS
AVE NE
RENTON WA
R 25
ROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR MOBILE AERIAL WORKPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.NE 16TH STWORK AREA
STAGING AREA
SHEET NUMBERREVISIONS
PERMITJT-231960KINDERING1700 EDMONDS AVE NE, RENTON 98056THIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE
CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART
WITHOUT WRITTEN AUTHORIZATIONSHEET NUMBERREVISIONS
PERMITTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE
CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART
WITHOUT WRITTEN AUTHORIZATION
ROADAHEADWORKONE LANEAHEADROADBEPREPAREDTO STOPROADAHEADWORKBEPREPAREDTO STOPONE LANEAHEADROADTRAFFIC CONTROL PLANSHORT TERM STATIONARY WORK ZONEFOR MOBILE AERIAL WORKPROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCEROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT.MINIMUM WEIGHT 15,OOO LBS.*GENERAL NOTES:SIGN SPACING = X (FEET)ALL SIGNS ARE 48" x 48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED.SE 256TH STWORK AREASTAGING AREASHEET NUMBERREVISIONS
PERMITJT-231960KINDERING1700 EDMONDS AVE NE; RENTON 98056THIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE
CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART
WITHOUT WRITTEN AUTHORIZATIONSHEET NUMBERREVISIONS
PERMITTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE
CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART
WITHOUT WRITTEN AUTHORIZATION
DRAWING NUMBERREVISIONSNO.DATEBYDESCRIPTIONTHIS DRAWING WAS CREATED FOR THE EXCLUSIVE USE OF THE CLIENT NAMED HEREON, AND IS TO BE USED IN WHOLE OR IN PART WITHOUT WRITTEN AUTHORIZATION.1PERMITTCP3
GRAPHIC SCALE
0 5 10
(IN FEET)
1 IN . = NTS -2231960-KINDERING
Horizon Communications Inc
6501 212th ST SW
Lynnwood, WA 98036
6/26/17
To whom it may concern:
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JT# 231960
To whom it may concern,
Horizon Communication has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposed to over lash approximately 2,527’ of aerial fiber along the right of way of NE 16th
heading East to Harrington Ave NE and South on Harrington Ave where plant will run East on
Glennwood Ave NE.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed over lash will not cause substantial adverse impacts to
other persons or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial over lash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Over lashing the cable will be accomplished in a few days, and the
residents will not notice any impact. Comcast will clean up the over lashed spans as
necessary and identify and remove and existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere
to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Danny Cooley at (253)686-7592.
Thank you for your consideration in this matter.
Danny Cooley
Construction Coordinator
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. Traffic Control Plan
DenisLawMayorCommunity&EconomicDevelopmentC.E.Chip”Vincent,AdministratorSeptember22,2017RhondaResnikComcast410ValleyAveNEPuyallup,WA98371ViaEmail:WAConstructionJointUse@cable.comcast.comSUBJECT:RequestforUndergroundingExemption(JT#231960,1700EdmondsAveNE,Kindering/StMatthewsChurch)DearMs.Resnik:TheCityofRentonhasreviewedyourrequesttograntComcastanexemptionfromRentonMunicipalCode(RMC)4-6-090(C)whichstatesthatallnewelectricalorcommunicationfacilitiesshallberequiredtobeinstalledunderground,pursuanttothestandardsofthesectionofRMC.ComcastproposestohaveHorizonCommunicationsoverlashapproximately2,527linearfeetof48-countCOAXaerialfibertoexistingPugetSoundEnergy(PSE)polesbeginningat1700EdmondsAveNEandcontinuingeastonNE16thStreettoHarringtonAveNE,thenalongthewestsideofHarringtonAveNE,crossingNE12thStreetinconduittoGlennwoodAveNE.TheproposedfiberwouldbeovelashedfromanexistingPSEutilitypoleonGlennwoodAveNEtotheexistingaerialpathcontinuingeastfor624feet.ANALYSIS:TheCityhasconsideredtherequestforanexemptionfromRMC4-6-090(D)(1)(g)iandU.Ordinance5720grantsComcast,therighttoinstallfiberopticcableandrelatedappurtenancesunder,along,over,below,throughandacrossthestreets,avenuesandalleysofCityofRentonwithintheright-of-wayofRenton.Section3.4ofthefranchiseordinancestatesthatifallofthedistributionlinesallthewirelineserviceproviders,suchastelecommunicationsserviceproviders,asdefinedinRCW35.99.010,autilityserviceprovideroraCableOperator(collectively“ServiceProviders”)inanyportionoftheFranchiseAreaareunderground,GranteeshallplaceitsCableSystem’sdistributioncablesundergroundwithinthatarea;providedthatsuchundergroundlocationsareactuallycapableofaccommodatingGrantee’scableandotherequipmentwithouttechnicaldegradationoftheCableSystems’signalquality.1055SouthGradyWay,Renton,WAg8057-rentonwa.gov
ComcastJobJTh231960Page2of2September22,2017TheproposalwouldutilizeexistingpolesandattachtotheexistingComcastaerialpath.Asminimumverticalheightclearanceof15’-G”wouldneedtobeprovidedfor,andexistingobsoletecablewouldneedtoberemoved;staffrecommendstheseasconditionsofapproval.Therefore,theCityisgrantinganexemptionwithconditions,perRMC4-6-090(D)(1)(g)iandiiwhichallowsforextensionsofexistingoverheadcommunicationfacilitieswhentherearecontinuingrequirementsforpolesanditisnotlikelythattherewillbeundergroundingintheforeseeablefuture;and,whenthereareexistingoverheadelectricalorcommunicationfacilitiesthatwillnotberemovedandthefacilitiesthatwouldhavebeenrequiredtoberemovedareparalleltothefacilitiesthatwillnotberemoved.DECISION:Therequestedexemptionfromundergroundutilityinstallationrequirements(RMC4-6-090(C)asrequestedbytheapplicantisapprovedsubjecttotheconditionsbelowastherequestcomplieswithexemptioncriteriaofRMC4-6-OgO(D)(1)(g)iandii.ConditionsofApproval:1.Anyexistingheightviolationswouldneedtoberesolvedatthetimeofconstruction.Newaerialfibermusthaveaminimumverticalclearanceof15,-B”.2.Anyabandonedorunusedcablewouldneedtoberemovedatthetimethatconstructionistakingplace.3.Thetrafficcontrolplanrequiresseparateapproval.4.Theaerialfiberwillberequiredtobeinstalledundergroundinthefuturewhenotherutilitiesareundergrounded.Thisdecisiontogranttheexemptionwithconditionsissubjecttoafourteen(14)dayappealperiodfromthedateofthisletterperRMC4-8-110.AnyappealsoftheadministrativedecisionmustbefiledwiththeCityClerk,alongwiththerequiredappealfee,by5:00pm,Oct.6,2017.Sincerely,UJenniferT.Henning,AICPPlanningDirectorcc:CE.“chip’vincent,CEDAdministratorHollyMunyan.hmunyan@horizonnw.netGreggZimmerman,wAdministratorDannyCooley,dannycooley@comcast.net3rianneBannwarth,DevelopmentEngineeringManagerJustinJohnson,civilEngineerIIScottwarlick,EngineeringSpecialistIIHollyPowers,DevelopmentServicesRepresentativePatMiller,constructionInspectionsupervisor1055SouthGradyWay,Renton,WA98057-rentonwa.gov