Loading...
HomeMy WebLinkAboutP_ROW_Design_20170613_v1PROOF EXISTING CONDUIT, PLACE PULL ROPE, BUILD A RISER , BORE 160' FROM POLE TO SIDE OF BUILDING, PLACE NEW CONDUIT, PLACE NEW PED AT BASE OF APARTMENT BUILDING, PLACE CHANNEL UP THE SIDE OF APARTMEENT BUILDING , CORE DRILL CONCRETE & PLACE CONDUIT TO TIE INTO 4TH FLOOR COMM. ROOM TO CREATE NEW PATHWAY TO PLACE NEW .625 COAX. REMOVE APT BOXES & REPLACE WITH NEW. Date: ENGINEERED FOR:MDU Bill Walker Comcast ope Prepared By:Rick Kern (253)569-3470 Rev Date PLACE HAND OFF MARKUP HERE 239370 MDU INPUT UPGRADE 2901 NE 10TH ST RENTON Hand Off N E S W NESESENWSEFNCO COMMUNICATIONS