HomeMy WebLinkAboutJT 254406 ROW Permit AppDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT ------~Renton ®
Planning Division I 1055 South Grady Way, 61h Floor I Renton, WA 98057 I 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa .gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency : Comcast of WA IV Inc
Franchise Job Number : 254406 Phone: 253-864-4663
Contact Name : Brian Hoback Email : brian_hoback@comcast.com
Job Site Address : 3200 SE 20th CT Renton Project Name :
Description of work: Requesting to open trench/bore 11' in r/w and place 2" PVC . Dig down 3' to intercept
existing pipe then bore 5' under sidewalk and continue trenching 3' to place a 9" flush mount Carson
box. See attached .
Please check all that apply:
D New Construction !!!!!I Repair/Relocate !!!!!I Underground D Overhead D Sidewalk D Street
!!!!I Open Trench !!!!!I Bore #of feet : _5_' ______ _
Contractor Name : Prince Telecom LLC Phone : 253-891-2899
State Contractors License#: EC PRINCTL834BF City of Renton Business License#: 29850 ---------
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this per and shall co with the City of Renton 's Trench Restoration and Street Overlay Requirements ."
Date 8/12/2017 Signature ___,,, ______________________ _
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date
Site Construction Inspector Date
Development Engineering Manager Date
D Approved as submitted
D Pre-Construction Meeting required
D Approved with comments or redlines
D Camera inspection of utilities required
Page 1 I Published : 3/30/2017
rr 11 1l ru1111 I I l\O::::>O:::l r u 1111
"1Frcefillfc@fill ® CITY OF RENTON
TRAFF IC CONTROL PLAN
PROJECT NAME: 3200 SE 20th CT Renton Comcast Job 254406 PERMIT#
CONSTRUCTION COMPANY: Prince Telecom LLC PHONE#: 253-891-2899
CONTACT NAME: Ryan Wilkerson PHONE#: 253-261-1882
ADDRESS: 2205 West Valley Hwy E Sumner, WA 98390 CELL#:
E-MAIL ADDRESS: ryan.wilkerson@princetelecom.com FAX#:
PROJECT LOCATION:3200 SE 20th CT Renton N/E/S/W OF :
WORK TIME : 8:30AM -4:30PM APPROVED BY:
WORK DATE : 9/11 /2017 APPROVAL DATE:
Permit Holder agrees to all the following :
• Comply with all traffic regulations of the City of Renton and the State of Washington .
• Prepare a traffic control plan and obtain City approval of that plan . That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compl i ance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency servi ces (253-852-2121) twenty-four (24) hours before any street or lane closures .
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violat i on of R.C.W . 47.36 .200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney's fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder's agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid ,
includ i ng the City's reasonable attorney's fees and litigation costs incurred result i ng from such cla i m .
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements .
PRINTNAME: 127E DATE: ~/-:f OFFICE COPY T-
CONTRACTOR
DEV . SERVICE , INSPECTION P. MILLER
DEV . SERVICE, PLAN REVIEW B. BANNWA RTH SIGNATURE: POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT .
• The plan must be submitted to the City's PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425 -204-4455) or any public/private agency to be affected
by a temporary lane or road closure .
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits ofTemporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage .
• Contractor must post notice of dates and time ofTemporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City's maintenance shop
(3555 NE 2"d Street).
SKETCH
--NORTH --
G
PLANTING STRIP
SIDEWALK
PLANTING STRIP
3116 3200 3206
<16'>sidewalk
bore
<3'>CATV exsisting pipe (dig down intercept
3/4" pipe)<5'>sidewalk
bore<3'><2'>PWR<3'>SIDEWALK
PLANTER
W20-7b
B
BE PREPAREDTO STOP100'
W20-7a
C
100'
ROAD
WORK
AHEAD W20-1A100'set carson
NORTH
NOT TO SC
A
L
E
KENNY"S TRAFFIC ZONE PLANS
Kenny Stertz
Longview , Wa
traficplayr@aol.com
TCS # 5663
Prince telecom
telecommunications installation
Fahm Salee
206-973-3049
JOB # 254406
cones -
flagger -
CATV -
CARSON -ROADWORKAHEADW20-1100'ASe 20th St