HomeMy WebLinkAboutMFP17004080DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17004080
IVR Number: 17004080
Permit InformaƟon
Permit Name:Comcast Cable Franchise Permit
Address/LocaƟon:08/30/2017ApplicaƟon Date:1923059078Parcel Number:451 SW 10TH ST
Permit Type:09/18/2017Issue Date:Franchise
Permit Work Class:09/18/2018ExpiraƟon Date:Minor UƟlity
Job Number:JT# 252241Franchise Type:Cable
DescripƟon:PROOF AND PULL 652' OF 36 CT FIBER IN EXISTING COMCAST CONDUIT.
Contacts
Name Address PhoneTypeBilling
Comcast Cable CommunicaƟon Management &
Comcast Cable Holding
B: (215) 665‐1700Applicant
Tom Donnelly
Comcast Business CommunicaƟons LLC
1701 JŅ Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286‐7347
C: (215) 286‐7557
Contact
Ken Pontelandolfo
Comcast
410 VALLEY Ave NW, SUITE #12,
Bldg C
Puyallup, WA 98371
B: (253) 288‐7532
C: (253) 254‐9088
Contact
Michael Cannon
Cannon ConstrucƟon Inc
406 Porter Way
Milton, WA 98354‐9638
B: (253) 922‐2787
C: (253) 588‐4034
Contractor
Business License Number: BL.020838ConstrucƟon Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057‐3232
Owner
Laurie Dietz
Comcast ‐ Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
Specialized
Billing
X
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
SITE SPECIFIC TRAFFIC CONTROL PLAN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
ALL CONTROL SET-UP, SIGN SPAC ING AND PROC EDUR ES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FE DERAL MANUAL ON UNIFO RMED TRAFFIC CON TROL
DEVICES (M .U.T.C.D)
CITIES AND VARIO US MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GU IDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
500
--
***Note***
----
-Will coordinate with business that will be effected by construction
-Work zone will not effect side walks or lanes of traffic during construction
-Traffic control signs on site will be black and orange and 48"x48"
955
451
_ ...
... ---------
-----\j\[ i~ --· ---------
--;-.\1 -Gv-3.0.'1 ------------s.\J'J , .. ---------------------------
--
--
... -
-----
m
'il
~
--::::::::: -:;:::::.:
---~----------------~ ~N· -----~ -~~ ---~ :
_:::::::::
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IIIII II
CHANNELIZATION DEVICE SPACING (FEET}
MPH TAPER TANGENT
50/65 10 TO 20 80
35/45 10 TO 20 60
25/30 10 TO 20 40
LONGITUDINAL BUFFER SPACE= 8
c.
::J
Q..
)>
< ro
(f)
~
I
I
I
I
I
I
I I
11111111 illlllll
... -
Retail Pro 252241
451 SW 1Oth St
-· COM CAST
TCP
SITE SPECIFIC TRAFFIC CONTRO IL PLAN
liHE DESIGNED TRAFFIC CONTROLS CONTAINED W~THIN
TliiiS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
PARKING
ALL CON TR OL SE T-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDE RAL MAN UAL ON UNIFORMED TRA FFIC CONTROL
DEVICES (M.U.T.C.D)
___ ___,n_E~---
CITIES AND VARIOUS MUNICIPA LIT IES MAY HAVE ALSO
ADOPTED SE PCIALIZED GU IDLI NES FOR TRAFF IC CONTROL
WITHIN THEIR JURISDICTION . IT IS THE RESPONSIBILITY OF
THE ON-S IT E TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPE CIAL CON DIT IONS EXIST
PARKING
LONGITUDINAL BUFFER SPACE= B
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS. AT
INTE RSECTIONS AND DR IVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
~ i
il>
I
~
,.,_,.,_j
***Note ***
-i
':::J
0
3
Q)
(j)
)>
< ([)
(f)
~
SW 7th St
PARKING
-Will coordinate with business that will be effected by construction
-There will be TCS on site to escort pedestrian traffic thur work zone
-Work will not encroach lanes of traffic or sidewalk
-Traffic control signs on site will be black and orange
-Each business will have at least one access point within work area
PAR KI NG
SW 7t h St
PARKING
w
D
Long Island Pipe
875 SW 7th St
-· COM CAST
TCP
248161