Loading...
HomeMy WebLinkAboutMFP17004080DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004080 IVR Number: 17004080  Permit InformaƟon Permit Name:Comcast Cable Franchise Permit Address/LocaƟon:08/30/2017ApplicaƟon Date:1923059078Parcel Number:451 SW 10TH ST Permit Type:09/18/2017Issue Date:Franchise Permit Work  Class:09/18/2018ExpiraƟon Date:Minor UƟlity Job Number:JT# 252241Franchise Type:Cable DescripƟon:PROOF AND PULL 652' OF 36 CT FIBER IN EXISTING COMCAST CONDUIT.  Contacts Name Address PhoneTypeBilling Comcast Cable CommunicaƟon Management & Comcast Cable Holding B: (215) 665‐1700Applicant Tom  Donnelly Comcast Business CommunicaƟons LLC 1701 JŅ Blvd, 32nd Floor Philadelphia, PA  19103 B: (215) 286‐7347 C: (215) 286‐7557 Contact Ken Pontelandolfo Comcast 410 VALLEY Ave NW, SUITE #12, Bldg C Puyallup, WA 98371 B: (253) 288‐7532 C: (253) 254‐9088 Contact Michael Cannon Cannon ConstrucƟon Inc 406 Porter Way Milton, WA  98354‐9638 B: (253) 922‐2787 C: (253) 588‐4034 Contractor Business License Number: BL.020838ConstrucƟon Contractor: CANNOCI055CS CITY OF RENTON ROW 1055 S Grady Way Renton, WA  98057‐3232 Owner Laurie Dietz Comcast ‐ Billing 1701 John F. Kennedy Blvd. Philadelphia, PA  19103 Specialized Billing X  General CondiƟons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.  This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements.  Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for AN work in the Right of Way.  Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.  (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT  THE JOB SITE AT  ALL TIMES SITE SPECIFIC TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION ALL CONTROL SET-UP, SIGN SPAC ING AND PROC EDUR ES WILL CONFORM TO SPECIFICATIONS STATED IN THE FE DERAL MANUAL ON UNIFO RMED TRAFFIC CON TROL DEVICES (M .U.T.C.D) CITIES AND VARIO US MUNICIPALITIES MAY HAVE ALSO ADOPTED SEPCIALIZED GU IDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 500 -- ***Note*** ---- -Will coordinate with business that will be effected by construction -Work zone will not effect side walks or lanes of traffic during construction -Traffic control signs on site will be black and orange and 48"x48" 955 451 _ ... ... --------- -----\j\[ i~ --· --------- --;-.\1 -Gv-3.0.'1 ------------s.\J'J , .. --------------------------- -- -- ... - ----- m 'il ~ --::::::::: -:;:::::.: ---~----------------~ ~N· -----~ -~~ ---~ : _::::::::: I I I I I I I I I I I I I I I IIIII II CHANNELIZATION DEVICE SPACING (FEET} MPH TAPER TANGENT 50/65 10 TO 20 80 35/45 10 TO 20 60 25/30 10 TO 20 40 LONGITUDINAL BUFFER SPACE= 8 c. ::J Q.. )> < ro (f) ~ I I I I I I I I 11111111 illlllll ... - Retail Pro 252241 451 SW 1Oth St -· COM CAST TCP SITE SPECIFIC TRAFFIC CONTRO IL PLAN liHE DESIGNED TRAFFIC CONTROLS CONTAINED W~THIN TliiiS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION PARKING ALL CON TR OL SE T-UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE FEDE RAL MAN UAL ON UNIFORMED TRA FFIC CONTROL DEVICES (M.U.T.C.D) ___ ___,n_E~--- CITIES AND VARIOUS MUNICIPA LIT IES MAY HAVE ALSO ADOPTED SE PCIALIZED GU IDLI NES FOR TRAFF IC CONTROL WITHIN THEIR JURISDICTION . IT IS THE RESPONSIBILITY OF THE ON-S IT E TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPE CIAL CON DIT IONS EXIST PARKING LONGITUDINAL BUFFER SPACE= B (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS. AT INTE RSECTIONS AND DR IVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. ~ i il> I ~ ,.,_,.,_j ***Note *** -i ':::J 0 3 Q) (j) )> < ([) (f) ~ SW 7th St PARKING -Will coordinate with business that will be effected by construction -There will be TCS on site to escort pedestrian traffic thur work zone -Work will not encroach lanes of traffic or sidewalk -Traffic control signs on site will be black and orange -Each business will have at least one access point within work area PAR KI NG SW 7t h St PARKING w D Long Island Pipe 875 SW 7th St -· COM CAST TCP 248161