HomeMy WebLinkAboutA_Franchise_Permit_20170905_v1DEPARTMENT OF COMMUNITY CITY OF
`Rent --::-ono
AND ECONOMIC DEVELOPMENT - � O
Planning Division 11055 South Grady Way, 6 1 Floor I Renton, WA 98057 1425-430-7200
Email: iranchise�ermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchigpnert-lits ri�ntonwa.Rov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Comcast Cable Communications Mgmt, LLC.
Franchise Job Number: JT#244103 Phone: 253-569-3470
Contact Name: flick Kern
Email: rkern@sefnco.com
Job Site Address: 16023 SE 144TH ST Project Name: Alpine Nursery
Description of Work: Bore 50' from new pole to old pole to be removed, build new strand & cable on PSE owned new poles.
Old poles to be removed by PSE after wreckout.
Please check all that apply:
e New Construction ❑ Repair/Relocate a Underground a Overhead ❑ Sidewalk ❑ Street
❑ Open Trench IN Bore # of feet: 50'
Contractor Name: Sefnco Communications Phone: 253-569-3470
State Contractors License #: SEFNCC1850QD City of Renton Business License #: BL.029666
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
underthis permit ap(ohall comply with the City of Renton's Trench Restoration and Street Overlay Requirements."
Signature Z;, j� � Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILD/NGPERMIT.COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
All vre-Lonsrrucrion meerings snan ne scneautea or a maximum of 14 aays prior to the Job start date.
Plan Review/Development Engineering Date
Site Construction Inspector
Development Engineering Manager
Date
Date
F] Approved as submitted
F] Pre -Construction Meeting required
R Approved with comments or redlines
F] Camera inspection of utilities required
Page 1 I Published: 3/30/2017