Loading...
HomeMy WebLinkAboutA_Permit_259440_171012_v2DEPARTMENT OF COMMUNITY CITY OF a AND ECONOMIC DEVELOPMENT enton Planning Division 1 1055 South Grady Way, 6`h Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Cable Communications Management, LLC. Franchise Job Number: JT#259440 Contact Name: Kyle Kinney Job Site Address: 923 Powell Ave SW, Renton, WA 98507 Phone: 253-293-3838 Email: Kyle_Kinney@cable.comcast.com Project Name: JSH Properties Description of work: Moving existing Comcast 48ct fiber storage 791' in Comcast system. Replace existing 17x30 vault for a 24x36 vault for new splice case. Place 36ct fiber in existing Comcast system onto private property. See plans for details. 3lease check all that apply: ❑ New Construction ❑ Repair/Relocate 0 Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑ Open Trench ❑ Bore # of feet: Contractor Name: Cannon Construction (Mark Lee) Phone: 360-250-7072 State Contractors License #: CANNONC1055CS City of Renton Business License #: BL.020838 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth underthis permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. " Signature Date 10-12-2016 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date ❑ Approved as submitted Pre -Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Page 1 1 Published: 3/30/2017