HomeMy WebLinkAboutA_Permit_259440_171012_v2DEPARTMENT OF COMMUNITY CITY OF
a
AND ECONOMIC DEVELOPMENT enton
Planning Division 1 1055 South Grady Way, 6`h Floor I Renton, WA 98057 1425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Comcast Cable Communications Management, LLC.
Franchise Job Number: JT#259440
Contact Name: Kyle Kinney
Job Site Address: 923 Powell Ave SW, Renton, WA 98507
Phone: 253-293-3838
Email: Kyle_Kinney@cable.comcast.com
Project Name: JSH Properties
Description of work: Moving existing Comcast 48ct fiber storage 791' in Comcast system. Replace existing
17x30 vault for a 24x36 vault for new splice case. Place 36ct fiber in existing Comcast system onto
private property. See plans for details.
3lease check all that apply:
❑ New Construction ❑ Repair/Relocate 0 Underground ❑ Overhead ❑ Sidewalk ❑ Street
❑ Open Trench ❑ Bore # of feet:
Contractor Name: Cannon Construction (Mark Lee)
Phone: 360-250-7072
State Contractors License #: CANNONC1055CS City of Renton Business License #: BL.020838
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
underthis permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. "
Signature
Date 10-12-2016
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date ❑
Approved as submitted
Pre -Construction Meeting required
Site Construction Inspector Date
Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Page 1 1 Published: 3/30/2017