Loading...
HomeMy WebLinkAboutP_TCP_259440_171012_v2PARKING PARKING d03 — PARKING SPEED LIMIT 2i PARKING L 'ITE SPECIFIC TRAFFIC CONTROL PLANNNNNNNJ THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP V/ILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUIBLIC AUTHORITY HAVING JURISDICTION ALL CONTROL S=T -UP, SIGN SPACING AND PROCEDURES WILL CONFORM TO SPECIFICATIONS STATED IN THE: jRPFFIC CONTROL FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL DEVICES (M.U.T.C.D) CERTIFIED S�PERVjIsOR CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO ADOPTEDSEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF CANNON CONSTRUCTION INC. THE ON-SITE TRAFFICONDITIONS NSEXISL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST 40MBRIAN FREEMq 01 eyv.913012019 N #p100 PARKING SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50170 MPH 1500'+/-ICa —E-0 RURAL HIGHWAYS 60/65 MPH 800'+/ - RURAL ROADS 45/55 MPH 500'+/ - RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'+/ - RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200'+/- RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100'+/- AL.L SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATE (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. MINIMUM TAPER LENGTH IN FEET = L LANE POSTED SPEED LIMIT (MPH) 250 305 I'll 25 30 35 40 45 50 55 60 65 70 425 10 105 150 205 270 450 500 550 - - - 5700 11 115 160 225 295 495 550 605 66C - - 840 12 125 180 245 320 540 600 660 720 780 840 LONGITUDINAL BUFFER SPACE = B SPEED 25 30 35 40 45 50 55 60[,]65 70LENGTH 155 200 250 305 360 425 495 5700 840 Ite*** -Will coordinate with business that will be effected by construction -Will escort pedestrians through work zone -Sidewalks will maintain 48" of walkway for pedestriams -Traffic control signs on site will be black and orange and 48"x4811 ork UTILITY 'WORK AHEAD -All work will be done from parking lots and planter strips, no sidewalks or road ways will be blocked during this Project N JSH PropE?rties 12591440 923 Powell Ave SW Renton WA 98057 DATE REVISION I BY QC o(unm�I V 7-11 SV CANNON CONSTRUCTION INC. CAST TCP 6 OF 7 EDP COP CONTR"!vjsooftwoL EDP — CER�;1F�� R �C CANNON CONSTRUCTION 'INC. BRIAIN EXp, gl„ MqN #p�p001 19-1110,1141101C o PARKING Access Road All work will be done from parking lots and planter strips, no sidewalks or road ways will be blocked durina this Proiect 'Note' -Will coordinate with business that will be effected by construction -Will escort pedestrians through work zone -Sidewalks will maintain '48" of walkway for pedestrians -Traffic control signs on site will be black and orange and 48"x4.8" WING N o Y w L O k� o Yip I SPEED LIMIT 11 m 25 �I 0 () EDP PARKING EOP ALL SIGN SPACING MAYBE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEI 'ERSECTIONS AND DRIVEWAYS. THE SPACING MAY BE REDUCED IN UR13AN AREAS TO FIT ROADWAY CONDITIONS. ® MINIMUM TAPER LENGTH IN FEET = L LANE POSTED SPEED LIMIT (MPH) w1oTH 25 30 35 40 45 50 55 60 65 70 10 105 1!50 2W560600 - - 11 115 1 f50 2 660 - - 10 2 720 780 840 LONGITUDINAL BUFFER SPACE: = B SPEED 25 �3TE SPECIFIC TRAFFIC CONTROL PLAN 35 40 45 50k55W60305 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED 360 425780 BY THE PUBLIC AUTHORITY HAVING JURISDICTION O i 840 - i ALL CONTROL SETUP, SIGN SPACING AND PROCEDURES - WILL CONFORM TO SPECIFICATIONS STATED IN THE UTILITY g FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL Z WORK DEVICES (M.U.T.C. D) - ` AHEAD CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO 5 21-1 ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND ANY SPECIAL CONDITIONS EXIST Q SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50!70 MPH 1500'+/-loees - Q RURAL HIGHWAYS 60/65 MPH 800'+/- °w FIURAL ROADS 45/55 MPH 500'+/ - RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'+/- \� 0 RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200'+/- RESIDENTAL & BUSINESS DISTRICTS a PARKING URBAN STREETS 25 MPH OR LESS 100'+/- N o Y w L O k� o Yip I SPEED LIMIT 11 m 25 �I 0 () EDP PARKING EOP ALL SIGN SPACING MAYBE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEI 'ERSECTIONS AND DRIVEWAYS. THE SPACING MAY BE REDUCED IN UR13AN AREAS TO FIT ROADWAY CONDITIONS. ® MINIMUM TAPER LENGTH IN FEET = L LANE POSTED SPEED LIMIT (MPH) w1oTH 25 30 35 40 45 50 55 60 65 70 10 105 1!50 2W560600 - - 11 115 1 f50 2 660 - - 10 2 720 780 840 LONGITUDINAL BUFFER SPACE: = B SPEED 25 30 35 40 45 50k55W60305 360 425780 840 FOP .OP EOP JSH Properties 259440 N 923 Powell Ave S;W PARKINGA4 Renton,WA 980,1.57 DATE I REVISION BY I QC 9/15/2017 V.K SV i - CANNON CONSTRUCTION INC. ¢�„ y COMCAST X^' TCP 7 01= 7