HomeMy WebLinkAboutP_TCP_259440_171012_v2PARKING
PARKING
d03 —
PARKING
SPEED
LIMIT
2i
PARKING
L 'ITE SPECIFIC TRAFFIC CONTROL PLANNNNNNNJ
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP V/ILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUIBLIC AUTHORITY HAVING JURISDICTION
ALL CONTROL S=T -UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE:
jRPFFIC CONTROL FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CERTIFIED S�PERVjIsOR CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTEDSEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
CANNON CONSTRUCTION INC. THE ON-SITE TRAFFICONDITIONS
NSEXISL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
40MBRIAN FREEMq 01 eyv.913012019
N #p100
PARKING
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50170 MPH 1500'+/-ICa —E-0
RURAL HIGHWAYS 60/65 MPH 800'+/ -
RURAL ROADS 45/55 MPH 500'+/ -
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'+/ -
RURAL ROADS & URBAN ARTERIALS 25/30 MPH 200'+/-
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100'+/-
AL.L SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATE
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
MINIMUM TAPER LENGTH IN FEET = L
LANE POSTED SPEED LIMIT (MPH)
250
305
I'll 25 30 35 40 45 50 55 60 65 70
425
10 105 150 205 270 450 500 550 - - -
5700
11 115 160 225 295 495 550 605 66C - -
840
12 125 180 245 320 540 600 660 720 780 840
LONGITUDINAL BUFFER SPACE = B
SPEED
25
30
35
40
45
50
55
60[,]65
70LENGTH
155
200
250
305
360
425
495
5700
840
Ite*** -Will coordinate with business that will be effected by construction
-Will escort pedestrians through work zone
-Sidewalks will maintain 48" of walkway for pedestriams
-Traffic control signs on site will be black and orange and 48"x4811
ork
UTILITY
'WORK
AHEAD
-All work will be done from parking lots and planter strips, no
sidewalks or road ways will be blocked during this Project
N
JSH PropE?rties 12591440
923 Powell Ave SW
Renton WA 98057
DATE REVISION I BY QC
o(unm�I V 7-11 SV
CANNON CONSTRUCTION INC.
CAST
TCP 6 OF 7
EDP
COP
CONTR"!vjsooftwoL
EDP —
CER�;1F�� R
�C
CANNON CONSTRUCTION 'INC.
BRIAIN EXp, gl„
MqN #p�p001
19-1110,1141101C
o
PARKING
Access Road
All work will be done from parking lots and planter strips, no
sidewalks or road ways will be blocked durina this Proiect
'Note' -Will coordinate with business that will be effected by construction
-Will escort pedestrians through work zone
-Sidewalks will maintain '48" of walkway for pedestrians
-Traffic control signs on site will be black and orange and 48"x4.8"
WING
N o
Y
w
L
O
k� o
Yip
I
SPEED
LIMIT 11 m
25
�I
0
()
EDP
PARKING
EOP
ALL SIGN SPACING MAYBE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEI
'ERSECTIONS AND DRIVEWAYS.
THE SPACING MAY BE REDUCED IN UR13AN AREAS TO FIT ROADWAY CONDITIONS.
® MINIMUM TAPER LENGTH IN FEET = L
LANE POSTED SPEED LIMIT (MPH)
w1oTH 25 30 35 40 45 50 55 60 65 70
10 105 1!50 2W560600
- -
11 115 1 f50 2 660 - -
10 2 720 780 840
LONGITUDINAL BUFFER SPACE: = B
SPEED
25
�3TE SPECIFIC TRAFFIC CONTROL PLAN
35
40
45
50k55W60305
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
360
425780
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
O
i
840
-
i ALL CONTROL SETUP, SIGN SPACING AND PROCEDURES
- WILL CONFORM TO SPECIFICATIONS STATED IN THE
UTILITY
g FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
Z
WORK
DEVICES (M.U.T.C. D)
- `
AHEAD
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
5
21-1
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
Q
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50!70 MPH 1500'+/-loees
-
Q
RURAL HIGHWAYS 60/65 MPH 800'+/-
°w
FIURAL ROADS 45/55 MPH 500'+/ -
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350'+/-
\�
0
RURAL ROADS & URBAN ARTERIALS
25/30 MPH 200'+/-
RESIDENTAL & BUSINESS DISTRICTS
a PARKING
URBAN STREETS 25 MPH OR LESS 100'+/-
N o
Y
w
L
O
k� o
Yip
I
SPEED
LIMIT 11 m
25
�I
0
()
EDP
PARKING
EOP
ALL SIGN SPACING MAYBE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADEI
'ERSECTIONS AND DRIVEWAYS.
THE SPACING MAY BE REDUCED IN UR13AN AREAS TO FIT ROADWAY CONDITIONS.
® MINIMUM TAPER LENGTH IN FEET = L
LANE POSTED SPEED LIMIT (MPH)
w1oTH 25 30 35 40 45 50 55 60 65 70
10 105 1!50 2W560600
- -
11 115 1 f50 2 660 - -
10 2 720 780 840
LONGITUDINAL BUFFER SPACE: = B
SPEED
25
30
35
40
45
50k55W60305
360
425780
840
FOP
.OP
EOP
JSH Properties 259440
N 923 Powell Ave S;W
PARKINGA4 Renton,WA 980,1.57
DATE I REVISION BY I QC
9/15/2017 V.K SV
i - CANNON CONSTRUCTION INC.
¢�„ y COMCAST
X^' TCP 7 01= 7