HomeMy WebLinkAboutP_Traffic_Control_20171128_v2AHEAD
WORK
ROAD
W20-1
SHOULDER
WORK
W21-5
AHEA
DWORKROAD
W20-1 SHOU
L
D
E
R
WORK
W21-5
V
V
V
POLICE
OFFICER
LANE SHIFT THROUGH
END OF CONSTRUCTION
PATH OF DIRECTIONAL BOREAHEADROADCONSTRUCTIONTO STOPBEPREPAREDW3-4AHEADROADCONSTRUCTIONTO STOPBEPREPAREDW3-4ALL CONTROL SET-UP, SIGN SPACING AND PROCEDURES
WILL CONFORM TO SPECIFICATIONS STATED IN THE
FEDERAL MANUAL ON UNIFORMED TRAFFIC CONTROL
DEVICES (M.U.T.C.D)
CITIES AND VARIOUS MUNICIPALITIES MAY HAVE ALSO
ADOPTED SEPCIALIZED GUIDLINES FOR TRAFFIC CONTROL
WITHIN THEIR JURISDICTION. IT IS THE RESPONSIBILITY OF
THE ON-SITE TRAFFIC CONTROL PERSONAL TO SEE IF AND
ANY SPECIAL CONDITIONS EXIST
6*'&'5+)0'&64#((+%%10641.5%106#+0'&9+6*+0
6*+56%29+..016$'+/2.'/'06'&706+.#22418'&
$;6*'27$.+%#76*14+6;*#8+0),74+5&+%6+10
COMCAST
5+6'52'%+(+%64#((+%%10641.2.#0=241215'&70&'4)4170&%10&7+6?
%10641.6;2'5+0).'.#0'#0&5*17.&'4%.1574'
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQC4000 E VALLEY RD,RENTON, WA256918PERMIT5 69/27/2017PERMITMNKS