Franchise Permit: MFP17004887
IVR Number: 17004887
Permit Informa!on
Permit Name:Comcast Cable Franchise Permit
Address/Loca!on:10/18/2017Applica!on Date:3123059032Parcel Number:4000 EAST VALLEY RD
Permit Type :03/16/2018Issue Date:Franchise
Permit Work Class:03/16/2019Expira!on Date :Minor U(lity
Job Number:256918Franchise Type :Cable
Descrip!on:ON SITE PRE CONSTRUCTION MEETING REQUIRED
Bore approx. 619' in the ROW; Place 2(2") conduits and new vault. The City is requesting
additional spare conduit across East Valley road. Pothole all Utility Crossings. Work under this
permit will be billed at $60 / hour for work within normal business hours and $75 / hour for
overtime hours. Restoration Per City of Renton Standards.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communica(on Management &
Comcast Cable Holding
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communica(ons LLC
1701 J6 Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Sco9 Nall
SEFNCO Communica(ons Inc
2904 4th Ave NE
Puyallup, WA 98372
B: (877) 385-2903
C: (253) 444-9057
Contractor
Business License Number: BL.041108Construc!on Contractor : SEFNCCI850QD
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
4000 East Valley RdMFP17004887Restoration per City of Renton Standards.Justin Johnson3-14-2018Scott Warlick3/16/2018
MFP17004887Monday through FridayJustin Johnson3-14-2018TBD at Pre-Construction meeting
V
V
V
SCOPE OF WORK:
SHEET INDEX:
1 - COVER SHEET
2 - NOTES & LEGEND SHEET
3 - DETAILS SHEET
4 -DESIGN
BILL OF MATERIALS*:
CONTACTS:
SERVICE KING
THIS IS PROPRITORY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED SEFNCO COMMUNICATIONSPROJECT MAP:DIRECTIONAL DRILL ~619' AT A MIN OF 36" IN THE ROW; PLACE 2
(2") SCH CONDUITS; PLACE .875 COAX CABLE; PLACE (2) NEW 17" X
30" VAULT
COVER
DIRECTIONAL DRILL =
TOTAL FOOTAGE =
619 FT.
619 FT.
PROJECT DESCRIPTION*
4000 E VALLEY RD, RENTON WA
SEFNCO KYARA SHROEDER
COMCAST JIM LECOMPET
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQC4000 E VALLEY RD,RENTON, WA256918PERMIT1 39/26/2017PERMITMNKSCOMCAST
COMCAST
JT#256918
1240' 2" CONDUIT
(2)17"X20" VAULTS
630' OF .875 COAX
MFP17004887
NOTES & LEGEND
6
ROW
R
PROPOSED VAULT
PROPOSED BORE PIT
STREET/SIGNAL/TRAFFIC LIGHT
CONSTRUCTION NOTE
CATCH BASIN
FIRE HYDRANT
EXISTING POLE W/ NEW RISER
BUILDING OUTLINE
TRAFFIC FLOW
LANDSCAPING/TREE
POTHOLE LOCATION
CHANNELIZATION
5+39 STATIONING
(xxx') OPEN TRENCH
PROPOSED DIRECTIONAL DRILL
EXISTING PULL THRU
PROPOSED BORE
PROPOSED OPEN TRENCH
(xxx') EXISTING PULL THRU
(xxx') BORE
(xxx') DIRECTIONAL DRILLRIGHT-OF-WAY
CENTERLINE
TRAFFIC LANE
FENCE
STORM DRAIN
MANHOLE
COMMUNICATIONS
WATER
SEWER
POWER
GAS
D
CB
S C
GAURD RAIL AERIAL STRAND
FIBER PLACEMENT NOTES:
GENERAL NOTES:
DISCLAIMER:
1.IT IS THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO VERIFY ALL RIGHT OF WAY
BEFORE CONSTRUCTION IS TO BEGIN. NO UNDERGROUND INSTALLATION REPRESENTED WITHIN
THESE PLAN SHEETS IS PROPOSED OUTSIDE OF THE RIGHT OF WAY.
2.THE UNDERGROUND ROUTE DEPICTED IS PRELIMINARY AND WILL/MAY VARY ONCE UTILITIES HAVE
BEEN FIELD LOCATED.
3.ANCHORING FOR THE AERIAL CONSTRUCTION IS TYPICALLY DETERMINED DURING CONSTRUCTION
AND IS COLLECTED IN THE AS-BUILT PHASE.
1.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY
SEE LOCAL DIRECTORY FOR CONTACT TELEPHONE NUMBER OF LOCAL CALL BEFORE YOU DIG AGENCY.
2.CONTRACTOR SHALL RECORD SEQUENCE # OF FIBER CABLE AT EVERY WORK POLE, MANHOLE, FIBER STORAGE LOOP
AND TAIL LOCATION. CONTRACTOR TO PROVIDE PROJECT MANAGER WITH SEQUENCE NUMBERS AT PROJECT
COMPLETION.
3.SLACK LOOP AND SNOWSHOE STORAGE LOCATIONS SHALL BE DETERMINED ON CONSTRUCTION DRAWINGS, HOWEVER,
REEL LENGTHS OF FIVE HUNDRED FEET (500') OR LESS ON LARGE COUNT FIBER OR THREE HUNDRED FEET (300') OR LESS
ON SMALL COUNT FIBER ARE DIFFICULT TO USE AND SHOULD BE PLACED AS FSL'S, NOT CUT AND RETURNED.
4.FIBER OPTIC IDENTIFICATION TAGS SHALL BE PLACED AT EVERY WORK POLE, MANHOLE, FIBER, STORAGE LOOPS, SPLICE
CASES AND WHERE INDICATED BY PROJECT MANAGER. TAGS NEED TO BE PLACED SO AS TO BE READ FROM THE GROUND.
5.CABLE LUBRICATION SHALL BE USED TO REDUCE PULLING TENSION. LUBRICANTS MUST NOT CONTAIN ANY PETROLEUM
PRODUCTS.
6.A 100 FOOT FIBER COIL MUST REMAIN IN ALL VAULTS UNLESS OTHERWISE NOTED.
7.ALL BURIED INFRASTRUCTURE MUST BE ACCOMPANIED WITH WARNING TAPE AND A TRACER WIRE, AT RISER POLES THE
LOCATE WIRE SHALL BE ACCESSIBLE AT THE BASE OF THE RISER.
8.ALL RISERS WILL BE CAPPED AT ALL TIMES.
9.ALL FIBER SHALL BE MARKED AS TO DIRECTION IN EACH VAULT. RED-NORTH, GREEN-SOUTH,YELLOW-EAST, AND
BLUE-WEST. DO NOT TAPE FIBER CABLES TOGETHER IN RISER.
1. ALL VAULTS / HANDHOLES TO BE EQUIPPED WITH SECURITY LIDS WITH LOCKING BOLTS.
2. GROUND RESTORATION/RIGHT-OF-WAY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION.
3. ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM OF 36" RADIUS UNLESS
SPECIFIED OTHERWISE.
4. BURIED FIBER OPTIC WARNING SIGNS SHALL BE PLACED AT EACH SIDE OF ALL ROAD CROSSINGS,
AT CULVERTS, DITCHES AND IN A STRAIGHT LINE OF SIGHT SPACING OF APPROXIMATELY 500 FEET.
5. DEVIATIONS FROM THE ENGINEERED ROUTE REQUIRES A PROJECT MANAGER AND RIGHT-OF-WAY
OWNER OR CARETAKER APPROVAL PRIOR TO CONSTRUCTION.
6. WHERE PERMITS FROM STATE, COUNTY, CITY, RAILROAD OR GOVERNMENT AGENCIES ARE
REQUIRED, ALL WORK PERFORMED WILL COMPLY WITH THESE AGENCIES STANDARD
SPECIFICATIONS.
7. THE PROJECT MANAGER WILL NOTIFY BUILDING MANAGEMENT WHEN WORK WILL BEGIN ON
BUILDING. CONTRACTOR TO COORDINATE ROOM ACCESS AND WORK START AND STOP TIMES
WITH BUILDING MANAGEMENT.
8. THE PROJECT MANAGER IS TO BE NOTIFIED BY THE CONTRACTOR 24 HOURS PRIOR TO
CONSTRUCTION. SEE COMPANY CONTACT LIST FOR CONTACT NAME(s) AND TELEPHONE NUMBER(s).
9. THE PROJECT MANAGER WILL RESERVE THE RIGHT TO INSPECT AT ANY TIME THE WORK BEING
PERFORMED BY THE CONTRACTOR. IF PROJECT MANAGER DETERMINES THAT THE WORK IS NOT
BEING PERFORMED TO MINIMUM QUALITY STANDARDS, THEN THE CONTRACTOR SHALL PROVIDE
REWORK AT HIS OWN COST.
10. ANY CHANGE IN PROJECT SCOPE, INCLUDING BUT NOT LIMITED TO, CONDUIT LENGTH, CONDUIT
PATH, AERIAL PATH ETC., MUST BE APPROVED BY THE PROJECT MANAGER.
11. ALL CORING/CONSTRUCTION THAT WILL CAUSE NOISE AND/OR VIBRATION SHALL BE DONE WITHIN
ALLOWED (9AM-3PM) BUSINESS HOURS.
12. ANY AND ALL UNDERGROUND UTILITIES ENCOUNTERED ARE THE RESPONSIBILITY OF THE
CONTRACTOR TO LOCATE, PROTECT, AND REPAIR, IF DAMAGED.
13. ALL FOOTAGES ARE BASED ON FIELD GATHERED MEASUREMENTS, AS SUCH SOME VARIANCE
SHOULD BE ANTICIPATED. ADJUST AS NEEDED.
14. ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 36" MINIMUM COVER. SITE HAS POTENTIAL FOR
ROCK THAT WOULD PREVENT THE ABILITY TO PROVIDE THE MINIMUM COVER. IN CASES WHERE THE
MINIMUM COVER CAN NOT BE ACHIEVED, THE CONDUIT SHALL BE PLACED IN A SCH 40 EMT SLEEVE
OR APPROVED EQUIVALENT.
15. WATER, SEWER, STORM SEWER AND EASEMENT LOCATIONS ARE BASED OFF OF CITY MAPS,
NOT FIELD VERIFIED.
16. BORING OF AC PAVING IS REQUIRED AT ALL LOCATIONS AS INDICATED ON PLANS.
17. AT NO TIME SHALL CURBS, GUTTERS OR HANDICAP BE DISTURBED.
18.DOOR HANGERS ARE TO BE PLACED A MINIMUM OF 72 HOURS PRIOR TO START OF CONSTRUCTION.
19. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL PLACE MESSAGE BOARDS STATING LANE
CLOSURES, AND DELAYS A WEEK IN ADVANCE. LOCATION OF THE MASSAGE BOARD SHALL BE
COORDINATED WITH THE CITY INSPECTOR AT THE PRE-CONSTRUCTION MEETING.
20. LANE CLOSURES CANNOT EXCEED MORE THAN 300 FT. AT A TIME. FOR SAFETY PURPOSES THERE
SHALL BE ONLY ONE CLOSURE AT A TIME ALONG INTERNATIONAL BLVD. MORE FLAGGERS WILL BE
NECESSARY TO HELP VEHICLES AND PEDESTRIANS IN THE WORK ZONES DURING THE LANE
CLOSURES.
LEGEND:
V
U U U U U U U U U U
S
W
P
C
G
D
COMCAST
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQC4000 E VALLEY RD,RENTON, WA256918PERMIT2 39/27/2017PERMITMNKSMFP17004887
V
V
V
COMCAST
1
3
1 TIE IN AT EXISTING VAULT
DIRECTIONAL DRILL; PLACE (2) 2" CONDUIT; WITH .875 COAX
CONSTRUCTION NOTES
4
PLACE NEW 17X30 VAULT
3
2
"DELIVERING EXCELLENCE"
SEFNCO
COMMUNICATIONS
OFDATEREVISIONBYQC4000 E VALLEY RDRENTON, WA256918PERMIT3 39/27/2017PERMITMNKS3
2 PROOF PULL THROUGH NEW CONDUIT
5
2
END OF DESIGN
4
5
4
NEW UNDERGROUND
MFP17004887
NESWSEFNCOCOMMUNICATIONSSOWSOWJT#256918FILE NAME:256918_DETAILED SOWDATE:CREATED 9/25/17PAGE:1 of 5ENGINEERED FOR:Not to scale. Do not use for locating.Verification of all utilities is the contractors responsibility. WA Dig line can be reached by dialing 811, WA law requires a 48 hour notice prior to digging.SERVICE KING JOB#:4000 E VALLEY RDRENTON, WA 98057CONTACT PERSON:SEFNCO COMMUNICATIONSKYARA SCHROEDER4610 TACOMA AVE.SUMNER, WA 98390Office (253) 299-8565Mobile (253) 405-5304KSCHROEDER@SEFNCO.COMSECTION INDEX:1 – COVER SHEET/ PROJECT LOCATION2 – OVERVIEW RENTON3 – DETAILED VIEW (ROW)4 – DETAILED VIEW (PRIVATE)COMCAST COMMUNICATIONS LLCKYLE KINNEY410 VALLEY AVE BLDG C ST 12PUYALLUP, WA 98371OFFICE(253) 864-4281MOBILE(206) 510-4222KYLE_KINNEY@comcast.comPROJECT TOTALSINTERIOR CONDUIT/COAXNEW PRIVATE UNDERGROUNDNEW ROW UNDERGROUNDNEW OVERLASH25'30'500'0TOTAL FOOTAGE555'RISER0PROJECT SCOPE:COMCAST PURPOSES TO TIE INTO EXISTING SYSTEM AND BORE ~500' AND PLACE 2 (2") SCH 40 CONDUITS IN ROW; PLACE 2 NEW VAULTS; BORE ~30' AND PLACE 1 (2") SCH 40 CONDUIT TO BUILDING; CORE DRILL AND OVERSET WITH LB; RUN ~25' OF COAX TO UTILITY CLOSET. 256918253‐293‐3838
Kyara SchroederPrepared By:REV 1Date:2 OF 5PROJECT SCOPE:COMCAST PURPOSES TO TIE INTO EXISTING SYSTEM AND BORE ~500' AND PLACE 2 (2") SCH 40 CONDUITS IN ROW; PLACE 2 NEW VAULTS; BORE ~30' AND PLACE 1 (2") SCH 40 CONDUIT TO BUILDING; CORE DRILL AND OVERSET WITH LB; RUN ~25' OF COAX TO UTILITY CLOSET. SMBKYLE KINNEY9/25/17OVERVIEW256918SERVICE KING4000 E VALLEY RDRENTON, WA 98057NESWSEFNCOCOMMUNICATIONSSYMBOL KEYNEW COMCAST VAULT/PEDNEW UNDERGROUND (BORE/TRENCH) UTILITY/DATA AREAEXISTING COMCAST VAULT/PEDLOT LINES/EDGE OF ROWNEW INTERIOR/EXTERIOR COAX2" CORE DRILL W/ LB & SEALANTUC0160'340'UC1SERVICED UNITS30'8'125'DRILL CREW SET UP LOCATIONDRILL CREW SET UP LOCATIONDIRECTIONAL DRILL @ 36" MIN;PLACE 2 - 2" PIPE;PLACE COAX CABLEDIRECTIONAL DRILL @ 36" MIN;PLACE 2 - 2" PIPE;PLACE COAX CABLEDIRECTIONAL DRILL @ 36" MIN;PLACE 1 - 2" PIPE;PLACE COAX CABLEPLACE EXTERIOR CONDUIT ON SIDE OF BUILDING; CORE DRILL 2" AND SEAL WITH LBBRING COAX DROP THROUGH DROP CEILING AND INTO UTILITY CLOSET
Kyara SchroederPrepared By:REV 1Date:3 OF 5SMBDETAILED VIEWNESWSEFNCOCOMMUNICATIONSKYLE KINNEY9/25/17256918SERVICE KING4000 E VALLEY RDRENTON, WA 98057SYMBOL KEYNEW COMCAST VAULT/PEDNEW UNDERGROUND (BORE/TRENCH) UTILITY/DATA AREAR 25POLE RISEREXISTING COMCAST VAULT/PEDNEW OVERLASHEXISTING UNDERGROUNDNEW INTERIOR/EXTERIOR COAX12"X18" LOCK BOX 2" CORE DRILL W/ LB & SEALANTUTILITY POLEUC1SERVICED UNITSTIE IN POINTBORE 2 (2") SCH 40 CONDUITSW 41ST STSW 41ST ST AND E VALLEYBORE 2 (2") SCH 40 CONDUITE VALLEY RDBORE 1 (2") SCH 40 CONDUITCORE DRILL 1(2") AND OVERSET WITH LBBORE 2 (2") SCH 40 CONDUITPLACE NEW VAULTPLACE NEW VAULT
KyaraSchroederPrepared By:REV 1Date:4 OF 5SMBDETAILED VIEWNESWSEFNCOCOMMUNICATIONSKYLE KINNEY9/25/17256918SERVICE KING4000 E VALLEY RDRENTON, WA 98057SYMBOL KEYNEW COMCAST VAULT/PEDNEW UNDERGROUND (BORE/TRENCH) UTILITY/DATA AREAR 25POLE RISEREXISTING COMCAST VAULT/PEDNEW OVERLASHEXISTING UNDERGROUNDNEW INTERIOR/EXTERIOR COAX12"X18" LOCK BOX 2" CORE DRILL W/ LB & SEALANTUTILITY POLEUC1SERVICED UNITSFIRE PENETRATE AND CON’T DROP ALONG CEILINGNORTH END OF SERVICE REPAIR SHOPFROM CEILING DROP INTO UC AND LEAVE 5' COILEDUC OF SERVICE KINGFACING WEST INSIDE UCRUN COAX INTO HALLWAY