Loading...
HomeMy WebLinkAboutA-Franchise_Permit_20171030_v11111110001� DEPARTMENT OF COMMUNITY CITY OF R10AND ECONOMIC DEVELOPMENT �rnton Planning Division 11055 South Grady Way, 6`h Floor I Renton, WA 98057 1425-430-7200 Email: franchise.1 its@rentonwa.gov Website: rentonwa.gav FRANCHISE PERMIT APPLICATION Published. 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Cable Communications, LLC Franchise Job Number: JT#217256 Contact Name: Danny Cooley Job Site Address: 1298 Union Avenue NE Phone Email: danny_cooley@comcast.com Project Name: RN06C New Node RN54 Description of Work: Overlash 5000' and proof and pull 1400' of 144ct fiber through existing conduit and poles. Please check all that apply: ❑ New Construction ❑ Repair/Relocate 9 Underground N Overhead ❑ Sidewalk El Street ❑ Open Trench ❑ Bore # of feet: Contractor Name: SEFNCO Communications Phone: State Contractors License a: SEFNCC1850QD City of Renton Business License t►: R006748 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements, " Signature Date 10/11/17 INSPECTIONS SHALL BE REQUESTED 24 H URPRl TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION CINE AT 42S-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called In for job start, re -inspection and project frnoL Re -inspection fees are billed at $75/hour Au ire-c.onsrructlon meetings snail ne scneaulect at a maximum 0114 days prior to the job start date. Plan Review/Development Engineering Date Site Constructian Inspector Development Engineering Manager Date Date Approved as submitted Pre -Construction Meeting required Approved with comments or redlines Camera inspection of utilities required Page 1 Published: 3/30/2017