Loading...
HomeMy WebLinkAboutA_Franchise_Permit_20171114_v1DEPARTMENT OF COMMUNITY CITY OF (D AND ECONOMIC DEVELOPMENT enton Planning Division 11055 South Grady Way, 611 Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published. 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchise permits@ rentonwa. ov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Cable Communications, LLC Franchise Job Number: 184666 Contact Name: Rhonda Resnik Phone: 253 686-7592 Email: rhonda_resnik@comcast,com Job Site Address: 12858 144th Ave SE Project Name: KE16AB3x3 N RENTON Description of work: Overlash 1300' of new 36ct fiber to existing poles. Proof and pull 520' of 36ct fiber through existing conduit underground. Please check all that ❑ New Construction ❑ Repair/Relocate a Underground a Overhead Cl Sidewalk ❑ street ❑ Open Trench ❑ Bore # of feet: Contractor Name- SEFNCO Communications, Inc. Phone: State Contractors License #- SEFNCC1850QD Clty of Renton Business License #: BL029666 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and street Overlay Requirements. " Signature Date 11-13-2017 INSPECTIONS SHALL B9 REQUESTED 24 HOURS PRION TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at X75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the lob start date. Plan Review/Development Engineering Site Construction Inspector Development Engineering Manager Date Date Date Approved as submitted Pre -Construction Meeting required F1 Approved with comments or redlines F1 Camera Inspection of utilities required Page I I Published: 3/30/2017