Loading...
HomeMy WebLinkAboutA_Permit_261687_171109_v1DEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENT enton Planning Division 11055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Punusnea:.i1julzul i TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.Rov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Comcast Cable Communications Management LLC. Franchise Job Number: JT#261687 Contact Name: Kyle Kinney Phone: 253-293-3838 Email: Kyle_Kinney@cable.comcast.com Job Site Address: 111 S 3rd St., Renton, WA 98057 Project Name: Chateau Retirement Description of Work. Overlash one 96ct fiber on existing Comcast aerial system, riser down and place one 96ct fiber in existing underground Comcast system, replace existing 17x30 vault to a 24x36, trench onto private property and place one 36ct fiber to customer building. See plans for details. Dlease check all that apply: ❑ New Construction ❑ Repair/Relocate 0 Underground 0 Overhead ❑ Sidewalk ❑ Street 0 Open Trench ❑ Bore # of feet: 1 51 Contractor Name: Cannon Construction (Shane Gottbreht) Phone: 360-688-4102 State Contractors License #: CANNONC1055CS City of Renton Business License #: BL.020838 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. " Signature Date 11/9/2017 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Site Construction Inspector Development Engineering Manager Date Date Approved as submitted Pre -Construction Meeting required F] Approved with comments or redlines F] Camera inspection of utilities required Page 1 I Published: 3/30/2017