HomeMy WebLinkAboutMFP17005442DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17005442
IVR Number: 17005442
Permit Informaon
Permit Name:Comcast Cable Franchise Permit
Address/Locaon :11/16/2017Application Date:0007200165Parcel Number:111 S 3RD ST
Permit Type:03/29/2018Issue Date:Franchise
Permit Work Class:03/29/2019Expiration Date:Minor Utility
Job Number:JT#261687Franchise Type:Cable
Description:CONDITIONS OF OVERHEAD APPROVAL: 1. Any existing height violations would need to be resolved at the time of
construction. New aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable
would need to be removed at the time that construction is taking place. 3. The traffic control plan requires separate
approval. 4. The aerial fiber will be required to be installed underground in the future when other utilities are
undergrounded.
Overlash fiber on existing comcast aerial system, riser down and place fiber in existing underground system. Replace
existing vault to a 24"X36" vault and trench onto private property and place fiber to customer building. Restoration per
City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Comcast Cable Communication
Management & Comcast Cable
B: (215) 665-1700Applicant
Tom Donnelly
Comcast Business Communications
1701 Jfk Blvd, 32nd Floor
Philadelphia, PA 19103
B: (215) 286-7347
C: (215) 286-7557
Contact
Michael Cannon
Cannon Constructors Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787Contractor
Business License Number: BL.041539Construction Contractor: CANNOCI055CS
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Restoration per City of Renton Standards.MFP17005442Justin Johnson3-27-2018Scott Warlick3/27/2018
MFP170054428:00 am to 3:00 pmMonday through FridayJustin Johnson3-27-2018
MFP17005442
MFP17005442
MFP17005442
This is the span I am
concerned about.
MFP17005442
MFP17005442
MFP17005442
CANNON CONSTRUCTION, MFP17005442
406 PORTER WAY
MILTON WA, 98354
11/9/2017
To whom it may concern:
City of Renton
1055 South Grady Way
Renton, WA 98057
RE: Aerial Variance Request for JT# 261687
To whom it may concern,
Cannon Construction has been contracted to design and engineer this project on behalf of Comcast
Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities.
Comcast proposed to overlash approximately 486’ of aerial fiber along the right of way of back alley
between S 3rd St and S 4th St. Please see maps and drawings for more details.
Comcast is requesting that the City of Renton approve this variance request based on the fact that the
requirements for undergrounding this proposed overlash will not cause substantial adverse impacts to
other persons or entities in the immediate area and will cause undue hardship.
1. Installation of undergrounding facilities will increase the total cost of construction roughly
15-25 times the amount of an aerial overlash on the existing Comcast strand.
2. Potential damage to underground facilities will be increased.
3. Over lash will not cause substantial adverse impact to other persons or entities in the
immediate area. Overlashing the cable will be accomplished in a few days, and the residents
will not notice any impact. Comcast will clean up the over lashed spans as necessary and
identify and remove and existing dead cables along this route.
4. The variance is necessary to prevent any undue hardship due to the increased construction
costs if forced to install the proposed extension underground.
5. The granting of the variance will not be materially detrimental to the public welfare because
Comcast does agree to underground the cable system, but they are waiving the obligation
into the future when all other utilities are underground to prevent an undue hardship
against Comcast currently.
Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your
requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere
to all provisions and requirements set forth by the City of Renton to insure safe installation and
maintenance of the proposed facilities.
If you have any further questions regarding this project, please contact Danny Cooley at (253)686-7592.
Thank you for your consideration in this matter.
Danny Cooley
Construction Coordinator
Attachments:
1. Application for ROW permit
2. 11” x 17” Site plan
3. 11” x 17” Design plan
4. Traffic Control Plan
DenisLawMayorCommunity&EconomicDevelopmentC.E.“Chip”Vincent,AdministratorMarch29,2018KyleKinneyComcastCableCommunications,CCC410ValleyAveNWPuyallup,WA98371ViaEmail:KyleKinney@cable.comcast.comSUBJECT:RequestforUndergroundingExemptionfJT#2616$7,MFP17005442,53tdStreet)DearMr.Kinney:TheCityofRentonhasreviewedyourrequesttograntComcastanexemptionfromRentonMunicipalCode(RMC)4-6-090(C)whichstatesthatallnewelectricalorcommunicationfacilitiesshallberequiredtobeinstalledunderground,pursuanttothestandardsofthesectionofRMC.ComcastproposestohaveCannonConstructionoverlashapproximately486linealfeetof96-countaerialfibertoexistingfive(5)PugetSoundEnergy(PSE)polesbeginninginthealleywestofWhitworthAveSouththeneast,crossingWhitworthAve5,theneastcrossingMorrisAveSouth,terminatingonaPSEpolelocatedat310MorrisAve5.ANALYSIS:TheCityhasconsideredtherequestforanexemptionfromRMC4-6-090(D)(1)(g)iandii.Ordinance5720grantsComcast,therighttoinstallfiberopticcableandrelatedappurtenancesunder,along,over,below,throughandacrossthestreets,avenuesandalleysofCityofRentonwithintheright-of-wayofRenton.Section3.4ofthefranchiseordinancestatesthatifallofthedistributionlinesallthewirelineserviceproviders,suchastelecommunicationsserviceproviders,asdefinedinRCW35.99.010,autilityserviceprovideroraCableOperator(collectively“ServiceProviders”)inanyportionoftheFranchiseAreaareunderground,GranteeshallplaceitsCableSystem’sdistributioncablesundergroundwithinthatarea;providedthatsuchundergroundlocationsareactuallycapableofaccommodatingGrantee’scableandotherequipmentwithouttechnicaldegradationoftheCableSystems’signalquality.TheproposalwouldutilizeexistingpolesandattachtotheexistingComcastaerialpath.Asminimumverticalheightclearanceof15’-6”wouldneedtobeprovidedfor,andexistingobsoletecablewouldneedtoberemoved;staffrecommendstheseasconditionsofapproval.Therefore,theCityisgrantinganexemptionwithconditions,1055SouthGradyWay,Renton,WA98057•rentonwa.gov
ComcastJobJT#261687Page2of2March29,2018perRMC4-6-090(D)(1)(g)iandiiwhichallowsforextensionsofexistingoverheadcommunicationfacilitieswhentherearecontinuingrequirementsforpolesanditisnotlikelythattherewillbeundergroundingintheforeseeablefuture;and,whenthereareexistingoverheadelectricalorcommunicationfacilitiesthatwillnotberemovedandthefacilitiesthatwouldhavebeenrequiredtoberemovedareparalleltothefacilitiesthatwillnotberemoved.DECISION:Therequestedexemptionfromundergroundutilityinstallationrequirements(RMC4-6-090(C)asrequestedbytheapplicantisapprovedwithconditionssubjecttotheconditionsbelowastherequestcomplieswithexemptioncriteriaofRMC4-6-090(D)(1)(g)iandii.ConditionsofApproval:1.Anyexistingheightviolationswouldneedtoberesolvedatthetimeofconstruction.Newaerialfibermusthaveaminimumverticalclearanceof15’-6”.2.Anyabandonedorunusedcablewouldneedtoberemovedatthetimethatconstructionistakingplace.3.Thetrafficcontrolplanrequiresseparateapproval.4.Theaerialfiberwillberequiredtobeinstalledundergroundinthefuturewhenotherutilitiesareundergrounded.Thisdecisiontogranttheexemptionwithconditionsissubjecttoafourteen(14)dayappealperiodfromthedateofthisletterperRMC4-8-110.AnyappealsoftheadministrativedecisionmustbefiledwiththeCityClerk,alongwiththerequiredappealfee,by5:00pm,April12,2018.Sincerely,JenniferT.Henning,AICPPlanningDirectorcc:CE.“Chip”Vincent,CEDAdministratorGreggZimmerman,PWAdministratorBrianneBannwarth,DevelopmentEngineeringManagerJustinJohnson,CivilEngineerIIScottWarlick,EngineeringSpecialistIIHollyPowers,DevelopmentServicesRepresentativePatMiller,ConstructionInspectionSupervisorDannyCooley,Comcastdannycooley@comcast.netPatGottbreht,CannonConstruction,pgottbreht@cannonconstructioninc.comFranchisePermits1055SouthGradyWay,Renton,WA98057rentonwagov