HomeMy WebLinkAboutA_Franchise_Permit_20171128_v1DEPARTMENT OF COMMUNITY-401111"Fw� CITY OF (D
AND ECONOMIC DEVELOPMENT ��Renton
Planning Division 11055 South Grady Way, 6`h Floor I Renton, WA 98057 1425-430-7200
Email: franchise ermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published. 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchiseaermits@rentonwa.eov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Comcast Cable Communications, LLC
Franchise Job Number: 265329
Contact Name: Rhonda Resnik
Job Site Address: 850 Monroe Ave NE
Phone: 253 686-7592
Email: rhonda resnik@comcast.com
Project Name: Pines at the Highlands
Description of work: Builder to place 3 - 4" conduits in the ROW for Comcast to place
cable later - approximately 350'.
Please check all that
e New Construction ❑ Repair/Relocate a Underground ❑ Overhead ❑ Sidewalk ❑ Street
❑ Open Trench ❑ Bore # of feet: 350'
Contractor Name: SEFNCO Communications, Inc. Phone:
State Contractors License #: SEFNCC1850QD City of Renton Business License #: BL029666
"I certify that i am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton'sTrench Restoration and Street Overlay Requirements."
_ / f
Signature
Date 11-28-2017
INSPECTIONS SHALL BE REQUESTED 24 FURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called In for job start, re -inspection and project final Re -inspection fees are billed at $75/hour.
All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the lob start date.
Plan Review/Development Engineering
Site Construction Inspector
Development Engineering Manager
{ Date F1 Approved as submitted
❑ Pre -Construction Meeting required
Date ❑ Approved with comments or redlines
Camera Inspection of utilities required
Date
Page 2 1 Published: 3/30/2017