7��FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to f ranchisepermitslErentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Comcast Cable Communications, LLC
Franchise Job Number: 265037 Phone: 253 686-7592
Contact Name: Rhonda Resnik Email: rhonda_resnik@comcast.com
Job Site Address: 4815 NE 4th Street Project Name: Storage One on 4th Expansion
Description of Work:
FROM POLE, TRENCH 3 FT AND PLACE EXISTING VAULT ON TOP OF
EXISTING 4" CONDUIT.
Please check all that apply:
❑ New Construction a Repair/Relocate N Underground ❑ Overhead ❑ Sidewalk ❑ Street
N Open Trench ❑ Bore # of feet: 3
Contractor Name: SEFNCO Communications, Inc.
Phone:
State Contractors License #: SEFNCC1850QD City of Renton Business License #: BL029666
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements."
Signature Date 12-07-2017
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
All Pre-Consrructron
Plan Review/Development Engineering
Site Construction Inspector
Development Engineering Manager
shall be scheduled at a maximum of 24 days prior to the lob start date.
Date
Date
Date
Approved as submitted
El Pre -Construction Meeting required
Approved with comments or redlines
Camera inspection of utilities required