Loading...
HomeMy WebLinkAboutJ_Aerial_Variance_Letter_171218_v14 f COMCAST 4020 Auburn Way N. Auburn WA 98002 12/11/2017 City of Renton 1055 South Grady Way Renton, WA 98057 RE: Aerial Variance Request for JT#231432 Utiligi Communications has been contracted to design and engineer this project on behalf of Comcast Cablevision. Comcast is applying for a variance request in order to upgrade their existing facilities. Comcast proposes to over -lash 296 feet of .0875 coaxial cable to our existing strand and cable on existing PSE poles along the right of way on Benson Rd South from 1900 S Puget Dr. to approximately 1920 S Puget Dr. in order to service a commercial customer at 1920 S Puget Dr. Comcast is requesting that the City of Renton approve this variance request based on the fact that the requirements for undergrounding this proposed over -lash will not cause substantial adverse impacts to other persons or entities in the immediate area and will cause undue hardship. 1. Installation of undergrounding facilities will increase the total cost of construction roughly 15 to 25 times the amount of an aerial over -lash on the existing Comcast strand. 2. Underground construction is far more intrusive to local residences. 3. Potential damage to underground facilities will be increased. 4. Over -lash will not cause substantial adverse impact to other persons or entities in the immediate area. Over lashing the cable will be accomplished in a few days, and the residents will not notice any impact. Comcast will clean up the over -lashed spans as necessary and identify and remove any existing dead cables along this route. 5. The variance requested does not constitute the granting of special services to Comcast because Comcast is agreeing to obligate the cable system to be placed underground when all other utilities are placed underground. 6. The variance is necessary to prevent an undue hardship due to the increased construction costs if forced to install the proposed extension underground. 7. The granting of the variance will not be materially detrimental to the public welfare because Comcast does agree to underground the cable system, but they are waiving the obligation into the future when all other utilities are undergrounded to prevent an undue hardship against Comcast currently. Upon the granting of the Variance, Comcast will coordinate construction and traffic control as per your requirements. Comcast and their contractors want to cooperate at the highest level and agree to adhere to all provisions and requirements set forth by the City of Renton to insure safe installation and maintenance of the proposed facilities. If you have any further questions regarding this project please contact me at (253)864- 4346. Thank you for your consideration in this matter. 114; Jim Nies Network Supervisor Comcast Cable Corporation