Loading...
HomeMy WebLinkAboutMFP17005964DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17005964 IVR Number: 17005964 Permit Informa!on Permit Name:Comcast Cable Franchise Permit Address/Loca!on:12/18/2017Applica!on Date:2023059126Parcel Number:1920 S PUGET DR Permit Type :01/24/2018Issue Date:Franchise Permit Work Class:01/24/2019Expira!on Date :Minor U%lity Job Number:231432Franchise Type :Cable Descrip!on:OVERHEAD APPROVED WITH CONDITIONS : 1. Any exis%ng height viola%ons would need to be resolved at the %me of construc%on. New aerial fiber must have a minimum ver%cal clearance of 15' 6". 2. Any abandoned or unused cable would need to be removed at the %me that construc%on is taking place. 3. The traffic control plan requires separate approval. 4. the aerial fiber will be required to be installed underground in the future when other u%li%es are undergrounded. Install 1 2" conduit in 18' of trench. Overlash 296 feet. Restora%on per City of Renton standards . Contacts Name Address PhoneTypeBilling Comcast Cable Communica%on Management & Comcast Cable Holding B: (215) 665-1700Applicant Tom Donnelly Comcast Business Communica%ons LLC 1701 JE Blvd, 32nd Floor Philadelphia, PA 19103 B: (215) 286-7347 C: (215) 286-7557 Contact Akisha Brown Prince Telecom Inc 551A Mews Dr New Castle, DE 19720 B: (302) 482-8893 C: (302) 482-8892 Contractor Business License Number: BL.029850Electrical Contractor : PRINCTL834BF Construc!on Contractor : PRINCTL862PS CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast 231432 Bill Carroll 253-863-3881 Permitting@utiligi.com 1920 S. Puget Dr, Renton SURVEYS INC From tie in riser pole trench 1-2" 18' west to edge of ROW. All conduit shall be trenched in with 36" of cover. Prince Telecom (253) 313-6453 EC PRINCTL834BF BL 029850 10/02/17 4 MFP17005964 Scott Warlick 12/18/2017 Restoration Per City of Renton Standards Overlash 296-feet 12-27-2017Justin Johnson MFP17005964 Justin Johnson 12-27-2017 8:00 am to 3:00 pm SHORT DURATION WORK ZONE ROW IMPACT PLAN TRAFFIC CONTROL PLAN / WORK AREA ROAD AHEAD WORKSHOULDER CLOSED ROAD AHEAD WORK PROTECTIVE VEHICLE WITH TMA ROLL AHEAD DISTANCE ROLL AHEAD STOPPING DISTANCE ASSUMES DRY PAVEMENT. MINIMUM WEIGHT 15,OOO LBS. * SIGN SPACING = X (FEET) ALL SIGNS ARE 36" x 36" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED. BENSON RD S / 108TH AVE TRAFFIC CONTROL PLAN TCP 1 RENTON REV DESCRIPTION SHEET NUMBER: BY CLIENT: PREPARED BY: PROJECT INFORMATION: 402 VALLEY AVE NW PUYALLUP, WA 98371 (253) 864-4297 PROJECT NUMBER: 111 NYBERG RD SW PACIFIC, WA 98047 (253) 863-3881 www.utiligi.com SEATTLE - PORTLAND COMCAST COMMUNICATIONS DATE PERMIT JURISDICTION: SHEET TITLE: 231432 1 11/09/17 DESIGN MP N PERMIT MFP17005964 2 1 OF 3 RENTON NEW AERIAL 0 FT *ALL FOOTAGES AND MATERIALS ARE ESTIMATED OVERLASH NEW UNDERGROUND EXISTING UNDERGROUND RISER(S) TOTAL FOOTAGE = = = = = 296 FT 18 FT 0 FT 25 FT 339 FT TYPE LENGTH REV DESCRIPTION SHEET NUMBER: BY CLIENT: PREPARED BY: PROJECT INFORMATION: 402 VALLEY AVE NW PUYALLUP, WA 98371 (253) 864-4297 PROJECT NUMBER: 111 NYBERG RD SW PACIFIC, WA 98047 (253) 863-3881 www.utiligi.com SEATTLE - PORTLAND COMCAST COMMUNICATIONS DATE PROJECT FOOTAGE DRAWING INDEXPROJECT TEAM PROJECT DESCRIPTION PERMIT JURISDICTION: PROJECT ADDRESS - PAGE 1 2 DESCRIPTION PROJECT INFORMATION PROJECT ROUTE- N 231432 1 11/09/17 DESIGN MP UTILIGI CONTACT BILL CARROLL UTILIGI COMMUNICATIONS OFFICE: (253) 863-3881 BILL.CARROLL@UTILIGI.COM COMCAST CONTACT: RUSS CARVER COMCAST CABLE OFFICE (425) 263-5365 RUSS_CARVER@COMCAST.NET COMCAST TO OVERLASH NEW COAX CABLE TO THE EXISTING AERIAL STRAND. COMCAST TO ALSO INSTALL NEW RISER, TRENCH TO SITE AND INSTALL NEW CONDUIT. 1920 S PUGET DRIVE RENTON, WASHINGTON 98055 TCP 1 TRAFFIC CONTROL PLAN- 3 DETAILED SITE PLAN- PERMIT MFP17005964 1 2 1 2 FOR DETAILED PLAN VIEW, SEE SHEET 3 PROJECT ROUTE 2 OF 3 RENTON REV DESCRIPTION SHEET NUMBER: BY CLIENT: PREPARED BY: PROJECT INFORMATION: 402 VALLEY AVE NW PUYALLUP, WA 98371 (253) 864-4297 PROJECT NUMBER: 111 NYBERG RD SW PACIFIC, WA 98047 (253) 863-3881 www.utiligi.com SEATTLE - PORTLAND COMCAST COMMUNICATIONS DATE PERMIT JURISDICTION: SHEET TITLE: 231432 1 11/09/17 DESIGN MP N PERMIT MFP17005964 R2"Ø 1920 BENSON RD S / 108TH AVE1 2 S PUGET DR1 18' TRENCH2 PROJECT ROUTE 3 OF 3 RENTON REV DESCRIPTION SHEET NUMBER: BY CLIENT: PREPARED BY: PROJECT INFORMATION: 402 VALLEY AVE NW PUYALLUP, WA 98371 (253) 864-4297 PROJECT NUMBER: 111 NYBERG RD SW PACIFIC, WA 98047 (253) 863-3881 www.utiligi.com SEATTLE - PORTLAND COMCAST COMMUNICATIONS DATE PERMIT JURISDICTION: SHEET TITLE: 231432 1 11/09/17 DESIGN MP N PERMIT MFP17005964 Trench 1‐2" 18' from pole to edge of ROWMFP17005964 MFP17005964 DenisLawMayorCommunity&EconomicDevelopmentC.E.Chip’Vincent,AdministratorJanuary23,2018JimNiesComcastCableCorporation4020AuburnWayNAuburn,WA98002SUBJECT:RequestforUndergroundingExemption(iT#231432,MFP17005964,1900-1920SouthPugetDrive)DearMr.Nies:TheCityofRentonhasreviewedyourrequesttograntComcastanexemptionfromRentonMunicipalCode(RMC)4-6-090(C)whichstatesthatallnewelectricalorcommunicationfacilitiesshallberequiredtobeinstalledunderground,pursuanttothestandardsofthesectionofRMC.ComcastproposestohavePrinceTelecomoverlashapproximately296linealfeetof0.0875coaxialcabletothree(3)existingPugetSoundEnergy(PSE)polesbeginningat1900SouthPugetDriveandendingat1920SouthPugetDrive.ANALYSIS:TheCityhasconsideredthereque5tforanexemptionfromRMC4-6-090(D)(1)(g)iandii.Ordinance5720grantsComcast,therighttoinstallfiberopticcableandrelatedappurtenancesunder,along,over,below,throughandacrossthestreets,avenuesandalleysofCityofRentonwithintheright-of-wayofRenton.Section3.4ofthefranchiseordinancestatesthatifallofthedistributionlinesallthewirelineserviceproviders,suchastelecommunicationsserviceproviders,asdefinedinRCW35.99.010,autilityserviceprovideroraCableOperator(collectively“ServiceProviders”)inanyportionoftheFranchiseAreaareunderground,GranteeshallplaceitsCableSystem’sdistributioncablesundergroundwithinthatarea;providedthatsuchundergroundlocationsareactuallycapableofaccommodatingGrantee’scableandotherequipmentwithouttechnicaldegradationoftheCableSystems’signalquality.TheproposalwouldutilizeexistingpolesandattachtotheexistingComcastaerialpath.Asminimumverticalheightclearanceof15’-6”wouldneedtobeprovidedfor,andexistingob5oletecablewouldneedtoberemoved;staffrecommendstheseasconditionsofapproval.Therefore,theCityisgrantinganexemptionwithconditions,perRMC4-6-090(D)(1)(g)iandiiwhichallowsforextensionsofexistingoverheadcommunicationfacilitieswhentherearecontinuingrequirementsforpolesanditisnotlikelythattherewillbeundergroundingintheforeseeablefuture;and,whenthereare1055SouthGradyWay,Renton,WA98057•rentonwa.gov ComcastJobJTfl231432Page2of2January23,2018existingoverheadelectricalorcommunicationfacilitiesthatwillnotberemovedandthefacilitiesthatwouldhavebeenrequiredtoberemovedareparalleltothefacilitiesthatwillnotberemoved.DECISION:Therequestedexemptionfromundergroundutilityinstallationrequirements(RMC4-6-090(C)asrequestedbytheapplicantisapprovedsubjecttotheconditionsbelowastherequestcomplieswithexemptioncriteriaofRMC4-6-090(D)(1)(g)iandii.ConditionsofApproval:1.Anyexistingheightviolationswouldneedtoberesolvedatthetimeofconstruction.Newaerialfibermusthaveaminimumverticalclearanceof15’-G”.2.Anyabandonedorunusedcablewouldneedtoberemovedatthetimethatconstructionistakingplace.3.Thetrafficcontrolplanrequiresseparateapproval.4.Theaerialfiberwillberequiredtobeinstalledundergroundinthefuturewhenotherutilitiesareundergrounded.Thisdecisiontogranttheexemptionwithconditionsissubjecttoafourteen(14)dayappealperiodfromthedateofthisletterperRMC4-8-110.AnyappealsoftheadministrativedecisionmustbefiledwiththeCityClerk,alongwiththerequiredappealfee,by5:00pm,February6,2018.cer&JenniferT.Henning,AICPPlanningDirectorcc:c..‘chip’vincent,cEDAdministratorGreggZimmerman,PWAdministratorBrianneBannwarth,DevelopmentEngineeringManagerJustinJohnson,civilEngineerIIScottWarlick,EngineeringSpecialistIIHollyPowers,DevelopmentServicesRepresentativePatMiller.constructionInspectionSupervisorPermttinu:Wg.rrr.attn.:HICa:o’1055SouthGradyWay,Renton,WA98057.rentonwa.gov