Loading...
HomeMy WebLinkAboutA_Permit_268018_171213_v1DEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENT enton Planning Division 1 1055 South Grady Way, 6t" Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Comcast Cable Communications Management LLC. JT#268018 Contact Name: Kyle Kinney Phone: 253-293-3838 Email: Kyle_Kinney@cable.comcast.com Job Site Address: 903 Houser Way N Project Name: Aero Plastics Description of work: Directional bore 1 (4") conduit 573'. Open Trench and place 1 (4") conduit 52. Place fiber in new conduit. Place new vaults. Please see design for details )lease check all that apply: PC New Construction ❑ Repair/Relocate 9 Underground ❑ Overhead ❑ Sidewalk @9 Street 0 Open Trench A Bore # of feet: 62 Contractor Name: Cannon Construction (Shane Gottbreht) Phone: 360-6884102 State Contractors License #: CANNONC1055CS City of Renton Business License #: BL.020838 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton's Trench Restoration and Street Overlay Requirements. " Signature Date 12/13/2017 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum or 14 days prior to the Job start date. Plan Review/Development Engineering Date site Construction Inspector Development Engineering Manager Date Date Approved as submitted Pre -Construction Meeting required Approved with comments or redlines F] Camera inspection of utilities required Page 1 I Published: 3/30/2017