NVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/1111222419109096620109096621108590633108590632GASPROJECT PHASENotification #Order #Main RetireSVC RetireSAP SuperiorService/MeterService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/MeterSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION.THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BYCOMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREINSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BYTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDNOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOSTANDARD GAS CONSTRUCTION NOTES:14.13.15.10.11.THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.9.6.7.5.4.3.1.6016. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.BILL JOHNSON206-571-8519NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.FOOTAGE BETWEEN FITTINGS.18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATINGINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICESINSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 ANDPSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINEDBY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FORSTANDARDS 2525.2100 AND 2525.3600.PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.11.12.14.13.AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.PER PSE GAS OPERATING STANDARD 2550.1600.ABANDONMENT OR DEACTIVATION.10.9.5.6.7.8.GAS OPERATING STANDARD 2525.2300.4.1.2.3.OUTAGE.STANDARD IP & LP GASREPLACEMENT CONSTRUCTION NOTES15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:#####HOLE HOG TABLECALLOUTLOCATIONDEPTHLENGTHBP1STARTBP2ENDBP3STARTBP4ENDBP5STARTBP6ENDBP7STARTBP8ENDBP9STARTBP10ENDBP11STARTBP12ENDBP13STARTBP14ENDBP15STARTBP16ENDBP17STARTBP18ENDBP19STARTBP20ENDSAP BATCH YEAR & FOOTAGERETIREDMAINMATERIALRETIREDRETIREMENTLENGTH OFACTUAL RETIREMENTORIGINAL YEARPROPOSEDLENGTH OFSIZE OFPLOT PLANSCALE: 1" = 30'-0" STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAPAIRNITROGENWATERSOAPAIRNITROGENWATERSTOP TIMESTART TIMETESTED BYTEST RESULTSPFTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928PFType/WorkManufacturerPipe SizeTypeEst LengthAct LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /INSTALL2"MPE288'INSTALL4"MPE66'RETIRE2"PE-A81'RETIRE4"STW4'RETIRE1-1/4"STW55'RETIRE3/4"STW23'6060 PSIG109096620DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrJ.GUAY425-424-6411N/AM.LOCK425-424-64133/17/17J.MALM425-424-64213/17/17M.JASSON425-466-9047.JOHNSON206-571-85193/17/17REQUIREDRENTON3124 NE SUNSET BLVDREPLACE DUPONT 2" PE-A IP MAINRENTON, WA 98056PSE1090966201"=30'1/1KING30SYSSKGPMSW 4-23-05204.080205.084N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ACell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:JOHN GUAY425-505-3768john.guay@pse.comFIELD NOTES:NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.INCLUDING AT OR BEYOND THE CONNECTION POINTS.1.2.SITEScale: N.T.S.DETAIL TIE-IN11FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS:PROJECT CONTACT INFORMATION:CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNERSHALL BE CONTACTED:BILLING QUESTIONS:425-466-9047MARK JANSSONmark.jansson@pse.com206-255-4824STEVE MELLINGERsteve.mellinger@pse.com425-505-3768JOHN GUAYjohn.guay@pse.com
BILL OF MATERIAL
ITEM QTY DESCRIPTION PART NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
288'
SAP# 109096620
40
41
42
43
44
45
BYPASS MATERIALS
19
20
21
22
23
18
PIPE 2" MPE COIL 7000261
WIRE #14 TRACING 8500940354'
CP TEST LEAD BOX COMPLETE 5000307
CP WIRE #10 TEST LEAD 850093010'
VALVE 2" MPE 5600259
BOX SUPPORT 2" POLYVALVE 9996257
BOX COMPLETE 1" THRU 2" POLYVALVES 9996260
1
1
1
CAP 2" MPE 52006491
PIPE 2" MPE STRAIGHT 700026320'
PIPE 4" MPE STRAIGHT 700046666'
COUPLING 4" ELECTROFUSION 58005101
1
TEE 4" X 4" MPE INLINE 7800413
STOPPER 4" X 150 STD H-17260 B/O 7600766
ELL 4" X 90° WELD 9996779
1
1
1
1
TRANSITION FITTING 4"7800811
CAP 4" WELD 9996797
TEE SERVICE PUNCH 1/2" X 5/8" PE OUTLET 78005751
1
3
1
1 CAP 4" MPE 5200689
HDPE FUSION TAPPING TEE 4" X 5/8" (GAUGE TEE)7800782
TEE 4" X 2" MPE HV TAPPING 9996712