Loading...
HomeMy WebLinkAboutP_Traffic_Control_Plan(TCP)_109106857_V1_170905131313131313 STOPFLAGGE RSTOPFLAGGE R BEPREPAREDTOSTOPW3-4X'X'X'ROADWORKAHEADW20-1W20-7AUSE MAXIMUM AVAILABLESPACE FOR SIGNSONE LANE ROAD AHEAD W20-4100'100'100'ROADWORKAHEADW20-1W20-7AROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA RKNO PARK SIGNAGE WILL BEPLACED ON ALL STREETS TOSURROUND WORK ZONEONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ASE 159TH ST130TH PL SE 131ST PL SERESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURE#13001CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#10910685713001 SE 159th ST, Renton WAAugust 31, 2017Sheet 1 of 1 ryan.honeysett@pse.com(425)457-5381NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be 10' W of C/L of 130th Pl SE& 10' S of C/L of SE 159th ST.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWWORK VEHICLESIGN LOCATIONWARNING FLAGFLAGGERSTOP