HomeMy WebLinkAboutN.354323 - Aerial Variance Cost Breakdown SheetCost Breakdown - 2725 NE Sunset BLVD, Renton, WA 98056
Underground vs. Overhead Construction
Partial Underground Installation (Initial Plan)
New conduit installation (trench) 2,031.48$
Temporary Restoration, backfill, disposal fees 14,356.00$
Permanent Sidewalk Restoration 126,852.00$
Conduit Prep & Tie ins 995.21$
Underground fiber placement 694.62$
Aerial Placement 2,241.70$
Cost to build 147,171.01$
Total Underground Installation
New conduit installation (bore & trench) 37,761.48$
Restoration, backfill, disposal fees 6,606.00$
Conduit Prep & Tie ins 2,263.60$
Fiber Placement 3,285.54$
Handhole placement 1,484.42$
Cost to build 51,401.04$
Overhead Installation
Make ready work 1,708.62$
Aerial fiber placement 2,216.95$
Cost to build 3,925.57$
Cost Difference - Partial Ug. vs. Overhead 143,245.44$
Cost Multiplier 37.49
Cost Difference - Underground vs. Overhead 47,475.47$
Cost Multiplier 13.09