HomeMy WebLinkAboutA_Permit_303696_181108_v.1DEPARTMENT OF COMMUNITY CITY OF
AND ECONOMIC DEVELOPMENT------�
Rentonis
Planning Division 11055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
7 FRANCHISE PERMIT APPLICATION
Published: 313UI2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency: Comcast Cable Communications Management LLC
Franchise Job Number: JT#303696 Phone: 253-864-4246
Contact Name: Cody Shackett
Email: Owen_Shackett@comcast.com
Job Site Address: 17816 108TH AVE SE RENTON WA 98055 Project Name: RENTON HOUSING AUTHORITY
Description of Work:
Place 24ct fiber in 440' of existing Comcast underground system.
Overlash for a total of 441' for 4 spans on existing system.
See plans for details.
Please check all that apply:
❑ New Construction ❑ Repair/Relocate ❑ Underground ❑ Overhead ❑ Sidewalk ❑ Street
❑ Open Trench ❑ Bore # of feet:
Contractor Name: Cannon Construction Inc. (Shane Gottbreht ) Phone: 360-688-4102
State Contractors License #: CANNOCIO55CS
City of Renton Business License #: BL.020838
"I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth
underthis permit and shall comply with the ty of Renton's Trench Restoration and Street Overlay Requirements."
Signature Date 11-8-2018
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the Job start aate.
Plan Review/Development Engineering Date
Site Construction Inspector
Development Engineering Manager
Date
Date
F] Approved as submitted
F] Pre -Construction Meeting required
❑ Approved with comments or redlines
Camera inspection of utilities required
Page 1 I Published: 3/30/2017