Loading...
HomeMy WebLinkAboutFranchise Permit Application OPL Station 120_81DEPARTMENT OF COMMUNITYCITY OF AND ECONOMIC DEVELOPMENT Renton Planning Division 11055 South Grady Way, 6`h Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hnur Franchise Agency: Olympic Pipe Line Company, LLC (Olympic) Franchise Job Number: Phone: (425) 306-7521 Contact Name: Ernest Falcon Email: Ernest.Falcon@bp.com Job Site Address: On S. 130th St. just north of P214480-0266 Project Name: Casing Main. Sta. 120+81 Description of Work: Olympic's contractor will excavate to the existing pipeline casing, inspect and install a new test station vent required for the cathodic protection. Excavation will be completed with a mini -excavator. Excavated material will be temporarily stockpiled on-site and then reused as backfill after maintenance is completed. Please check all that apply: ❑ New Construction ® Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑✓ Open Trench ❑ Bore # of feet: 8 feet long, 8 feet wide Contractor Name: Snelson Companies, Inc Phone: 360-856-6511 State Contractors License #: SNELSI"374N9 City of Renton Business License #: BL.027630 "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply w' a City of Renton's Trench Restoration and Street Overlay Requirements. " Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Site Construction Inspector Development Engineering Manager Date Date ❑ Approved as submitted ❑ Pre -Construction Meeting required ❑ Approved with comments or redlines ❑ Camera inspection of utilities required Page 1 of 1 1 Published: 2/1/2018