Loading...
HomeMy WebLinkAbout114+04 Site Plan cross sectionThe locations of all features shown are approximate. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 1. 2. Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 114+04 Project Vicinity Map Renton, Washington Figure 1 Approximate location of work area SP: 0089412626\Working\Station 114+04.pptx CRW: 05/08/2018Reference: City of Renton IT GIS The locations of all features shown are approximate. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 1. 2. Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 114+04 Project Site Plan Renton, Washington Figure 2 Work Area SP: 0089412626\Working\Station 114+04.pptx CRW: 05/08/2018Reference: City of Renton IT GIS Casing excavation will be about 8 feet wide by 8 feet long by 13 feet deep Bus Stop –to be relocated or closed (pending notification from King County Metro B 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 114+04 Project Typical Cross Sections Renton, Washington Figure 3 This drawing is not to scale Casing excavation will be about 8 feet wide by 8 feet long The ground surface at excavation location will be restored to pre-excavation conditions after the excavation is backfilled. Olympic 12” Pipeline Temporary Fencing, Barriers or Cones (if needed) Shoring Grass and Topsoil Casing excavation depth will be approximately 13 feet deep Temporary Fencing, Barriers or Cones (if needed) Shoring Grass and Topsoil Casing excavation depth will be approximately 13 feet deep SP: 0089412626\Working\Station 114+04.pptx CRW: 05/08/201812-inch pipeline 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 3.Prepared following WSDOT Standard Plan TC10. Specific sign locations may be adjusted with approval of the City of Renton Inspector. For signs size refer to Manual on Uniform Traffic Control Devices (MUTCD) and WSDOT Sign Fabrication Manual M55-05. 4.Olympic will work with property owners at southeast end of diverted area to allow local access around the work area. 5.Speed limit on Renton Avenue is 35 mph Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Station 114+04 Project Traffic Control Plan Renton, Washington Figure 4 Work Area B TCP Contacts: Ernest Falcon Olympic/BP 425-306-7521 David Walker Snelson Co. 360-661-3535 Temporary Sign Location TX Spacing Distance = 200 feet, or adjusted to fit street conditions SP: 0089412626\Working\Station 114+04.pptx CRW: 05/08/2018Reference: City of Renton IT GIS Cones or Traffic Barrels W20-1 X X X Bus Stop –To be closed (notification/signage from King County Metro Transit) Staging Area Bus stop closed (signage provided by King County Metro Transit) Truck-Mounted Attenuator