HomeMy WebLinkAbout120_81 Site Plan cross sectionThe locations of all features shown are approximate.
This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document. GeoEngineers,
Inc. cannot guarantee the accuracy and content of electronic files. The
master file is stored by GeoEngineers, Inc. and will serve as the official
record of this communication.
1.
2.
Notes:
Olympic 12-inch Pipeline Casing Maintenance
Renton-Seattle Pipeline Station 120+81 Project
Vicinity Map
Renton, Washington
Figure 1
Approximate
location of work area
SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/2018Reference: City of Renton IT GIS
The locations of all features shown are approximate.
This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document. GeoEngineers,
Inc. cannot guarantee the accuracy and content of electronic files. The
master file is stored by GeoEngineers, Inc. and will serve as the official
record of this communication.
1.
2.
Notes:Olympic 12-inch Pipeline Casing Maintenance
Renton-Seattle Pipeline Station 120+81 Project
Site Plan
Renton, Washington
Figure 2
Excavation Area
SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/2018Reference: City of Renton IT GIS
Casing excavation will be about 8 feet wide by 8 feet long by 3 feet deep
Staging and Stockpile Area
Olympic’s 12-inch pipeline
1.The locations of all features shown are approximate.
2.This drawing is for information purposes. It is intended to assist in
showing features discussed in an attached document. GeoEngineers, Inc.
cannot guarantee the accuracy and content of electronic files. The master
file is stored by GeoEngineers, Inc. and will serve as the official record of
this communication.
3.Temporary shoring will be used if excavation becomes deeper than 4 feet.
Notes:
Olympic 12-inch Pipeline Casing Maintenance
Renton-Seattle Pipeline Station 120+81 Project
Typical Cross Sections
Renton, Washington
Figure 3
This drawing is not to scale
Casing excavation will be about 8 feet wide
by 8 feet long
The ground surface at excavation location
will be restored to pre-excavation conditions
after the excavation is backfilled.
Olympic 12” Pipeline
Temporary Fencing, Barriers or Cones (if needed)
Grass and Topsoil
and/or gravel
Casing excavation depth will
be approximately 3 feet deep
Temporary Fencing, Barriers or Cones (if needed)
Grass and Topsoil
and/or gravel
Casing excavation depth will
be approximately 3 feet deep SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/201812-inch pipeline