Loading...
HomeMy WebLinkAbout120_81 Site Plan cross sectionThe locations of all features shown are approximate. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 1. 2. Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 120+81 Project Vicinity Map Renton, Washington Figure 1 Approximate location of work area SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/2018Reference: City of Renton IT GIS The locations of all features shown are approximate. This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 1. 2. Notes:Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 120+81 Project Site Plan Renton, Washington Figure 2 Excavation Area SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/2018Reference: City of Renton IT GIS Casing excavation will be about 8 feet wide by 8 feet long by 3 feet deep Staging and Stockpile Area Olympic’s 12-inch pipeline 1.The locations of all features shown are approximate. 2.This drawing is for information purposes. It is intended to assist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and content of electronic files. The master file is stored by GeoEngineers, Inc. and will serve as the official record of this communication. 3.Temporary shoring will be used if excavation becomes deeper than 4 feet. Notes: Olympic 12-inch Pipeline Casing Maintenance Renton-Seattle Pipeline Station 120+81 Project Typical Cross Sections Renton, Washington Figure 3 This drawing is not to scale Casing excavation will be about 8 feet wide by 8 feet long The ground surface at excavation location will be restored to pre-excavation conditions after the excavation is backfilled. Olympic 12” Pipeline Temporary Fencing, Barriers or Cones (if needed) Grass and Topsoil and/or gravel Casing excavation depth will be approximately 3 feet deep Temporary Fencing, Barriers or Cones (if needed) Grass and Topsoil and/or gravel Casing excavation depth will be approximately 3 feet deep SP: 0089412626\Working\Station 114+04.pptx CRW: 05/10/201812-inch pipeline