+� PUBLIC WORKS SEDIMENT TRAM STD. PLAN - 211.00
DEPARTMENT
-p !vMAHCH 2GOB
POLYETHYLENE CAP
PERFORATED POLYETHYLENE
O"RAGE TLFBING, DIAMETER
MIN. 2' LARGER THAR -
DEWATERING ORIFICE
TUBING SHALE COMPLY
WITH ASTM F667 AND
AASHTO M294.
""161 PROVIDE ADEWATE
CORRUGATED
METAL RISER
WATERTIGHT DEW ATE RING ORIFICE, SCHEDULE
COUPUNG
TACK WELD - 80 STEEL STUB MIN -
DIAMETER AS PER CALCt1LATICNS
!` IT' MIN. _
.• Mlo-1
AL7ERNSTi VELY, METAL STAKES
- AND WIRE WAY BE USED TO
CONCRETE gAPREVENT FL.0TATION
EA PISER ILIA N.N
,
Cat Y STD, PLAN - 216.10
+ • + PLTBIR' WORKS SEDIMENT POND
�, , DEPAf�' MLINT RISER DETAIL
- :4�iAI�CI-i C}DB
NOTES
1. CONDMON QF USE
1.1, IPLASTC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRED COVER MEASURES FOR LESS THAN 30 DAYS.
1.2, PLASTC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1,5. CLEAR PLASTIC SHEETING MAY OF USEO OVER NFWLYS3iFE0F1) AREAS TO GREATS A GREENHOUSE EFPEGT ANP FNCOVRACE LIRAS$
GROW ri1. CLEAR PLASTEC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS
1.4. THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEPW
UNSTABLE SLOPEES
2. DESIGN AND INSTALLATION SPECIFICAMNS
R.1. PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF U.03 MILLIMETERS.
2.2. IF EROSION AT THE TOE OF A SLOPE 15 LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SliALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
3- MAINTENANrE $TANDARQ6
311. TORN SHEETS MOST BE REPLACED AND OPEN BEAMS REPAIRE0-
3.2. IF THE PLASTIC BEGINS TO DETERIORATE DIE TO ULTRAVIOLET RADIATION. IT MOST BE COMPLETELY REMOVED AND REPLACED.
3.3. WHEN THE PLASTIC ES NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVES.
~ PUBLIC WORKS
+I` DEPkRTMLNT
PLASTIC COVERING
STD. PLAN - 213.30
MARC14 25DS
.FOI NTB IN FILTER FABRIC SHALL BE SPLICED
AT POSTS. USE STAPLES, WIRE RINGS, OR
E04JIVALENT TO ATTACH FABRIC TO POSTS,
25.2' BY 14 Ga- NARE -OR
ESUNALENT. IF STANDARD
STRENGTH FABFUC USED
FILTER FABFBG
1
1-I I H I I -I j
�LII71111-f ? L . LLlf tl l_-2M I-1
L ■
> �1 �I
VMAX --' MINIMLIM A'" TRENCH ..
BACKFiLL TRENCH WITH
41
POST SPACING MAY EIE INCREASED NATIVE SOIL
TO B' IF WIRE BACKING IS USED
rx4' WOOD PCSTS. STEEL. FENCE
POSTS, REBAR. OR EQUIVALENT
NOTES
1, CONDITION OF USE
1.1. SILT FENCE MAY BE USED DOWN SLOPE OF ALL DISTURBED AREAS.
1.2. SLT FENCE 1S NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS INTENDED TO TREAT SUBSTANTIAL AMOUNTS 4F OVERLAND FL4:
ANY CONCENTRATED FLOW MOST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEC WENT TRAP OR POND-
2. DESIGN AND INSTALLATION SPECIFICATIONS
2 1. THE GEOTEXTILE USED MOST MET THE STANDARD LISTEQ BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MOST BE
AVAILABLE ON SITE
30-IDO-91 ESIZE(OFD .MMM FO_2 TFIiM
A¢SIASTM�17S1I
SV 111q 5:EyE S¢e a�.LS cCa4THER FABRI[S
WATERRERMITTIV17Y rAST1V0491j
0.02SEC"-1MINIMUM
{apA9 T#N51 LE STp#NCxi Ip5THA 1 321
ISO LE. MIN, FOR EKW STRENWI FABRIC
1001.6S. MIN. FOR STANDART? STRENG14T FASAIC
GRABTE145ILE ELONGATION IAiTM0404
30%MAX.
ULTRAWOLATERESiSTANCE LASTAhM55
70%MIH.
2.2. STANDARD STRENGTH FABRIC REOL)IRES WiRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE HACKING OR CLOSER POST
SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3. WHERE THE FENCE IS 3NSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H;1V
Z.A. IF A TYPICAL SILT F$"NCE IS U$irD, THE STANDARD 4X4 TRENCH MAY NOT 13E REDUCED AS LONG AS THE BOTTOM B INCHES OF THE SILT FENCE
IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT
FENCE.
3. MAINTENANCE STANDARDS
3.1. ANY DAMAGE SHALL BE REPAIR IMMEDIATELY.
3. 2- IF CONCENTRATED FLOES ARE EVIDENT UPHILL OD THE FENCE. THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3. IT IS IMP RTANT TO CHECit THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND
THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVED THE TRAP
SEDIMENT.
3A, SEDIMENT MOST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
EROSION CONTROL (ESC) STANDARD PLAN NOTES
1.BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF
RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE
APPLICANT'S CONTRACTOR.
2.THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON
STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION
STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT.
THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING
REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE
CONSTRUCTION STORMWATER GENERAL PERMIT.
33HE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION
SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED
FROM THE PRE -CONSTRUCTION MEETING TO POST -PROJECT CLEANUP
IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS.
43HE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND
THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE
RETENTION, AS PRESCRIBED ON THE PLAN(S), SHALL BE CLEARLY
FLAGGED BY SURVEY TAPE OR FENCING AND PROTECTED IN THE FIELD
IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON
SURFACE WATER DESIGN MANUAL (RSWDM) PRIOR TO CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE
CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE
MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION
OF CONSTRUCTION.
5.STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE
BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION
OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED
WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD
RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED
THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY
DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM
ENTERING WATERS OF THE STATE.
&WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE
OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH
OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR
OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY
OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS.
TALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN
OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO
PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER,
DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL
BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME
THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL
FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED
AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN
STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT
UU
0 R
O�
(now what's below.
Call before you dig. NO- REVISION
STD. PLAN - 214.00
PUBLIC WORKS SILT FENCE
DEPARTMENT
MARCH 2GOB
EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT,
ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE
RESPONSIBILITY OF THE APPLICANT.
8.ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE
POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY.
9.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE
MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS
CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE
ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION
CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF
CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF
THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE
CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS,
OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO
PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
10.APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT
CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR
LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER
FACILITIES.
11.ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF
STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR
REVIEW AND APPROVAL.
12.ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING
THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN
DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH)
SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC
COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.)
IN CONFORMANCE WITH APPENDIX D OF THE RSWDM.
13.WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION
SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE
APPROVED BY THE CITY.
14.ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING
IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS.
15.THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND
MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS
FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL
OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY.
16.BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH
BASIN INSERTS PER THE CITY STANDARD PLANS SHALL BE PROVIDED
FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A
DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT
ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND
REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING
CONDITION.
17.AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE
CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE
CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER
INTO THE DOWNSTREAM SYSTEM.
18.ANY PERMANENT STORMWATER FACILITY USED AS A TEMPORARY
SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS
AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE
PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION
SYSTEM, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT
THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
GRADE OF THE PERMANENT FACILITY.
19.AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING
STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS,
BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY
FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION
AND COMPACTION DURING CONSTRUCTION.
20.PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL
DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES
SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER
RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE
WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF
THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW.
21.PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE
SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM
LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND
STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS
SHALL BE RESTORED TO THEIR FULLY FUNCTIONING
CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE
VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM,
DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO
ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER
FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR SMALL
AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST.
22.ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK
STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE
CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN
CITY ROAD RIGHT-OF-WAY SHALL BE CONSTRUCTED IN ACCORDANCE
WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHT-OF-WAY
SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL
BUILDING CODE.
SURVEYED: SCALE:
DESIGNED:MKW NO SCALE
DRAWN: MKW
ONE INCH
CHECKED: BEB AT FULL SCALE
IF NOT ONE INCH
BY DATE AP P R I APPROVED: SCALE ACCORDINGLY
HORIZZONnTAL: NAD 1983/1991 Aogftktv4
CITY OF
;iqRENTON
DATUM
Planning/Building/Public Works Dept.
09//012018
Civil Engineers
Structural Engineers
Landscape Architects
■
Community Planners
Natural Resource Ecologist
Land Surveyors ,
Neighbors
T A C O M A S E A T T L E
S P O K A N E T R I- C I T I E S
2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEB
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
FA
EVELOPMENT ENGINEERING
nn Fowler 09/20/2018 '
WALKER AUTO DEALERSHIP
EARLY CLEAR AND GRADE PLANS
AHBL JOB #2180100.10
TESC NOTES AND DETAILS
DATE:
6/8/2018
FIELDBOOK:
PAGE:
DRAWING NO:
C3.1