INSTALL DRIVEWAY CULVERT 1F THERE
IS A ROADSIDE DITCH PRESENT, AS
PER CITY ROAD STANDAAM
4-4r QUARR V $PALLS
DRIVEWAYS SHALL, BE PAVED TO THE EDGE
OF R-O-W PRIOR TO JNSTAL -ATION OF THE
CONSTRUCTION ENTRAHf,E TO AVGID
DAMAGING OF THE ROADWAY
Tr IS RECOMMENDED THAT THE
ENTRANCE FIE CROWNED50T-HAT
RUNOFF {TRAINS OPF THE PAD
`11
�12" FAIN. THICKNESS --- -- 13 4� PROVIDE FULL WIDTH OF
NOTES I NGRESSIEGRESS AREA
1, CONDITION OF USE
1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON
PAVED ROADS OR OTHER PAVED AREAS WITHIN 1.ODD FEET OF THE SITE.
GRAB TENSILE STRESNGTH ASTM D47511
200 PSI MIN.
GRABTENSILEELONGATIOIN AST141D4632
30%MAX-
MULLEN BURST STRENGTH ASTM D378&80A
4W PSI KNI_
AOS IASTM 04751
2035 (U.S- STANDARD SIEVE SIZE)
2. DESIGN AND INSTALLATION SPECIFICATIONS
2.1. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN ARES THAT WILL BOT BE USED
FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY
AT ANY TIME REQUIRL THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO
PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2-2. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE-
2.1 WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE, THIS CAN SUBSTANTIALLY
INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THIF NEED FOR MAKFENANCE-
3. MAINTENANCE STANDARDS
3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3-2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE
STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE lid THE DIMENSIONS OF THE
ENTRANCE, OR THE INSTALLATION OF THE WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH
CRUSHED RACK, AND WASHED WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3-3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY
SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET,
EXCEPT WHEN SWEEPING 13 INEFFECTIVE AND THERE JS A THREAT TO PUBLIC SAFETY. IF IT NECESSARY TO WASH THE STREETS, A
SMALL SUMP MUST BE CONDUCTED, THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND
DISCHARGED APPROPRIATR Y-
3 4, ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5. IF VEHICLES ARE ENTERING Obi EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE
INSTALLED TO CONTROL TRAFFIC-
SM. PLAN - 216.10
+ MMUC WORKS STABILIZED
I)EPARTMENT CONSTRUCTION ENTRANCE
MARCH 2O08
2,1 SLOPES
1
I
� 1
ROCK MUST COMPLETELY COVER THE
P"4` ROCK
L = THE D ISTANCE SUCH THAT POINTS
A AND B ARE OF EQUAL ELEVATION
9
L
III=1II-.IIEdIE
-III IIEIlIl
1
MIN.
NOTES
1. CONDITION OF USE
1.1. WERE CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM PONDS OR TRAPS.
1,2, TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURIDE 0 AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT-
2, MAINTENANCE STANDARDS
2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 0.5 FEET SHALL BE REMOVED SO. THAT THE CHANNEL IS RESTORED TO fTS ORIGINAL
DESIGN CAPACITY.
22- THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS- IF SCOURING AND EROSION
HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RiPRAP OR AN EROSION CONTROL BLANKET.
PUBLIC' WORKS CHECK DAMS SPACING AND STD: PIAN - 217.40
I)EPAR'FMEN'i CROSS SECTIONS MARCH 2O08
G
STANOA,R❑ STRENGTH
Pie TFR Pd RR
�JJ
_.-
-i I I --- --
CATCH BASIN
GRATE
1, CONDITION OF USE
1.1. SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS
THE RUNOFF THAT ENTERS THE CATCHBASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
1.2. MAY BE USED ANYWHERE AT THE APPLICANTS DISCRETION TO PROTECT DRAINAGE SYSTEM.
1.3. THE GONTRInUTING DRAINAGE AREA MOST NOT BE LARGER tHAN 1 ACRE.
L DESIGN AND INSTALLATION SPECIFICATIONS
2.1. FILTER FABRIC IS ONLY ALLOWED WERE PONDING WILL NOT BE A TRAFFIC CONCERN AND WHERE SLOPE EROSION WILL NOT RESULT IF THE
CURB IS OVERTOPPED BY PONDEU WATER.
2.2. THE PLACEMENT OF A P ILTFR PASRiC VNIjER GRATES IS GENERAU.,Y PRQHIHITEID AN13 THE U5F OF FILTER FAE3RIC OVr:R GRATES IS STRICTLY
LIMITED AND DISCOURAGED-
3. MAINTENANCE STANDARDS
3.1. ANY ACCUMULATED SEDIMENT ON OR AROUND INLET PROTECTION SHALL BE REMOVED IMMEDJATELY. SEDIMENT SHALL NOT BE REMOVEL:
WITH WATER AND ALL SEDIMENT MUST 13E DISPOSED OF AS FILL ON SITE OR HAULED OFF SITE
`+ PLIBUC' WORKS FILTER FABRIC PROTECTION STD. FLAK - 216-20
ti DEPAR';i MEN'r
=p MARCE 2D05
U0
0 R
O�
Know what's below.
Call before you dig.
\ld
REVISION
2 1 MAX. SLOPE
LEVEL BOTTOM
1' MIN. -
- I I III- I I I I I_ I• .-,
iI�_Ili=1I1- 1
s� NFIw.
SWALLSPACINO DEPeNOS ON SLOPE GRADIENT
NOTES
1. CONDITION OF USE
T.1- REQUIRED AT:
1.1 .1. THE TOP OF ALL SLOPES IN EXCESS OF 3HAV ANO WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2. AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELLOW.
AVERAGE SLOPE
SLOPE PERCENT
FLOWPATH LENGTH
20HAV
3-5%
300FEET
10TC 20 H:1V
5-lu%
200FEET
(4TRIU)H:IV
10-25%
100FEET
2704H:LV
2S-50%
50FEET
2. DEStGN AND INSTALLATION SPECIFICATIONS
2.1- FOR SLOPES STEEPER THAN 2H:1V WITH MORE THAN 19 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER
SPACED INTERCEPTOR SWALES MAY BE USED. THE DESIRE MEASURE MOST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY
INTERCEPT THE HIGH VELOCFTY RUNOFF TO A SEDIMENT POND OR TRAP.
2.2. CONSTRUCTION TFMFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED.
3. MAINTENANCE STANDARDS
3.1- DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY,
3.2. IF THE FACILITY 1)0 NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY ANIxOR fREaUENCY OF THE SWALES SHALL BE
INCREASED.
e
PLIBILIC WORKS INTERCEPTOR SWALE STD. PF.lIN - 217.10
i]EPARTMEi NT
MARCH 2OOS
SURVEYED:
DESIGNED:M KW
DRAWN: MKW
CHECKED: BEB
BY DATE AP P R APPROvED:
SCALE:
NO SCALE
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL• NAVD 19M
HORIZONTAL: NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
CONSTRUCTION SEQUENCE
1. SCHEDULE AND ATTEND PRE -CONSTRUCTION MEETING WITH
STEMEN'S ENVIRONMENTAL, THE ENGINEER, OWNER'S
REPRESENTATIVE, GEOTECHNICAL ENGINEER, CESCL, AND
CITY INSPECTOR.
2. POST SIGN WITH NAME AND PHONE NUMBER OF ESC
SUPERVISOR (MAY BE CONSOLIDATED WITH THE REQUIRED
NOTICE OF CONSTRUCTION SIGN).
3. SECURE THE PROJECT SITE WITH SECURITY FENCING.
4. CHECK AND FIX EXISTING PERIMETER FABRIC FENCING.
5. INSTALL CATCH BASIN PROTECTION ALONG FRONTAGE.
6. MAINTAIN EXISTING AND PROVIDE NEW CONSTRUCTION
ENTRANCE(S).
7. DELIVER AND CONFIGURE STORMWATER STORAGE TANKS.
POTHOLE SIDE SEWER AND CONNECT TANKS FOR
DISCHARGE. SEWER DISCHARGE SHALL ADHERE TO THE
KING COUNTY SEWER DISCHARGE PERMIT.
8. GRADE AND STABILIZE ONSITE CONSTRUCTION ROADS IF
NECESSARY FOR TRUCK TRAFFIC.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR
DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY WITH
CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE
WITH APPENDIX D OF THE 2017 CITY OF RENTON SURFACE
WATER DESIGN MANUAL (2017 RSWDM) AND
MANUFACTURER'S RECOMMENDATIONS.
11. RELOCATE EROSION CONTROL MEASURES OR INSTALL NEW
MEASURES SO THAT AS SITE CONDITIONS CHANGE THE
EROSION AND SEDIMENT CONTROL IS ALWAYS IN
ACCORDANCE WITH THE CITY'S EROSION AND SEDIMENT
CONTROL STANDARDS.
12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE
THAN SEVEN DAYS DURING THE DRY SEASON OR TWO DAYS
DURING THE WET SEASON WITH STRAW, WOOD FIBER
MULCH, COMPOST, PLASTIC SHEETING, OR EQUIVALENT.
13. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN
SEVEN DAYS.
14. STABILIZE ANY AREAS TO REMAIN UNWORKED FOR MORE
THAN 30 DAYS. STABILIZE RECLAIMED AREAS WITH ROCK
SURFACING.
14. THE WETLAND BUFFER SHALL BE RESTORED IN ACCORDANCE
WITH THE LANDSCAPE PLANS.
15. UPON COMPLETION OF THE PROJECT, ALL DISTURBED
AREAS MUST BE STABILIZED AND BMPS REMOVED IF
APPROPRIATE.
Civil Engineers
Structural Engineers
Landscape Architects
■
Community Planners
Natural Resource Ecologist
Land Surveyors ,
Neighbors
v ep STE>zT TACOMA SEATTLE
SIONALE� SPOKANE TRI-CITIES
09/10/2018 2215 North 30th Street, Suite 300 Tacoma, WA 98403
253.383.2422 TEL 253.383.2572 FAX www.ahbl.com WEB
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
IL
Ann Fowler 09/20/2018
WALKER AUTO DEALERSHIP
EARLY CLEAR AND GRADE PLANS
AHBL JOB #2180100.10
TESC NOTES AND DETAILS
DATE:
6/8/2018
FIELDWOK:
PAGE:
DRAWING NO:
C3.2
SHEET: OR
9 9
Nt
IN
Nt
O
OIJ
T
1
L_J
N
T-
N
C)
O
00
T