Loading...
HomeMy WebLinkAboutM_Cost Estimate_181018_v1Last Updated: 10/18/18 Std. Item Description Unit Unit Quantity Total No.Price Amount 7038 ROADWAY SURVEYING LS LS 1 3,000.00$ 6630 HIGH VISIBILITY FENCE LF 4.00$ 600 2,400.00$ 6635 HIGH VISIBILITY SILT FENCE LF 8.00$ 720 5,760.00$ 0310 ROADWAY EXCAVATION INCL. HAUL CY 15.00$ 500 7,500.00$ 0030 CLEARING AND GRUBBING - TRAIL ONLY (INCLUDING TREE REMOVAL) AC 15,000.00$ 0.4 6,000.00$ 6579 BARK OR FINE WOOD CHIP MULCH AC 12,500.00$ 0.2 2,500.00$ 0431 GRAVEL BORROW INCL. HAUL TN 30.00$ 300 9,000.00$ 7530 CONSTRUCTION GEOTEXTILE FOR SEPARATION SY 8.00$ 700 5,600.00$ Non-Std INVASIVE SPECIES REMOVAL AC 16,000.00$ 0.34 5,440.00$ 6552 PSIPE 5-GALLON NATIVE MITIGATION PLANT EA 35.00$ 40 1,400.00$ 6552 PSIPE 2-GALLON NATIVE MITIGATION PLANT EA 15.00$ 549 8,235.00$ 6552 PSIPE 1-GALLON NATIVE MITIGATION PLANT EA 10.00$ 1,400 14,000.00$ 6417 SEEDING, FERTILIZING, AND MULCHING - SITE AC 5,000.00$ 0.1 250.00$ 6071 IRRIGATION SYSTEM LS 15,000.00$ 1 15,000.00$ 6545 WEED AND PEST CONTROL EST 5,000.00$ 1 5,000.00$ 7084 CHAIN LINK FENCE TYPE 4 LF 35.00$ 270 9,450.00$ 1940 MULCHING ACRE 12,500.00$ 0.34 4,250.00$ Non-Std SPLIT RAIL FENCE LF 40.00$ 460 18,400.00$ Non-Std INTERPRETIVE SIGN EA 3,000.00$ 1 3,000.00$ Non-Std TRAILHEAD PARK SIGN EA 5,000.00$ 1 5,000.00$ Non-Std TRASH RECEPTACLE EA 1,200.00$ 1 1,200.00$ Non-Std BOLLARD EA 800.00$ 1 800.00$ Non-Std BENCH EA 1,500.00$ 3 4,500.00$ Construction Cost 137,685$ City of Renton May Creek Trail Extension Preliminary Construction Cost Estimate K:\project\32900\32978\ProjectDocs\CostEstim\32978 Prelim Cost Est.xls Printed: 10/18/2018 10:46 AM Prepared by Otak