HomeMy WebLinkAboutW_waiver_form_20180419_v1DEPARTMENT OF COMMUNITY °`F' °F
AND ECONOMIC DEVELOPMENT Renton
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
Planning Division
1055 South Grady Way -Renton, WA 98057
Phone: 425-430-7200 1 www.rentonwa.gov
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED MODIFIED COMMENTS:
BY: BY:
Arborist Report 4
Biological Assessment 4
Calculations 1
Colored Maps for Display 4
Construction Mitigation Description 2AND4
Deed of Right -of -Way Dedication 1
Density Worksheet 4
Drainage Control Plan
Drainage Report Z
NCMJX*YF11
Elevations, Architectural 3AND 4�������
Environmental Checklist 4
Existing Covenants (Recorded Copy) 1AND4
Existing Easements (Recorded Copy) 1AND4
Flood Hazard Data 4
J
Floor Plans 3AND4
Geotechnical Report2AND3
Grading Elevations & Plan, Conceptual Z
Grading Elevations & Plan, Detailed Z
Habitat Data Report 4
Improvement Deferral Z
Irrigation Plan
PROJECT NAME: jhw.— e.v- SII it s
DATE:
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 08/2015
LAND USE PERMIT SUBMITTAL REQUIREMENTS:
WAIVED
BY:
MODIFIED
BY:
COMMENTS:
King County Assessor's Map Indicating Site4
Landscape Plan; Conceptual4
Landscape Plan, Detailed
Legal Description
Letter of Understanding of Geological Risk 4
Map of Existing Site Conditions4
Master Application Form 4
Monument Cards (one per monument) 1
Neighborhood Detail Map 4
Overall Plat Plan 4
Parking, Lot Coverage & Landscaping Analysis 4
Plan Reductions (PMTS) 4
Post Office Approval z
Plat Name Reservation 4
Plat Plan 4
Preapplication Meeting Summary 4
Public Works Approval Lettere
Rehabilitation Plan 4
Screening Detail 4
Shoreline Tracking Worksheet 4
Site Plan 2AND4
Stream or Lake Study, Standard
Stream or Lake Study, Supplemental
Stream or Lake Mitigation Plan 4
Street Profiles Z
Title Report or Plat Certificate 1AND4
Topography Maps
Traffic Study z
Tree Cutting/Land Clearing Plan 4
v
Urban Design Regulations Analysis4
J�
Utilities Plan, Generalized z
Wetlands Mitigation Plan, Final 4
f
i
Wetlands Mitigation Plan, Preliminary 4
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 08/2015
LAND USE PERMIT SUBMITTAL REQUIREMENTS: W BY ED
MODIFIED
BY:
COMMENTS:
Wetlands Report/Delineation 4
i
Wireless:
Applicant Agreement Statement 2 AND 3
Inventory of Existing Sites 2AND3
Lease Agreement, Draft ZAND 3
Map of Existing Site Conditions 2AND 3
Map of View Area 2 AND 3
Photosimulations ZAND 3
This Requirement may be waived by:
1. Property Services
2 Development Engineering Plan Review
3 Building
4 Planning
H:\CED\Data\Forms-Templates\Self-Help Handouts\Planning\Waiversubmittalregs.docx Rev: 08/2015