Loading...
HomeMy WebLinkAboutRenton Franchise ROW App SE03XC381 SignedDEPARTMENT OF COMMUNITY CITY OF 0 AND ECONOMIC DEVELOPMENT enton Planning Division 1 1055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits:@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 Franchise Agency: Zayo Group Franchise Job Number: Phone: 206-832-4853 Contact Name: Joe Morton Email: wwapermits@zayo.com Job Site Address: 919 Houser Way N Renton, WA 98057 Project Name: SE03XC381 Description of Work: Sweep (1) 2" conduit into existing Zayo vault. Retrieve existing 144ct fiber storage and install new mid -sheath splice case. Trench 15' in landscape area install (1) 2" conduit and pull (1) 144ct fiber through. Sweep conduit into existing Sprint vault, pull fiber through. Pull fiber through existing Sprint conduit. Exit ROW Tease check all that apply: ❑ New Construction ❑ Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑✓ Open Trench ❑ Bore # of feet: 15 Contractor Name: Zayo Group Phone: 206-832-4853 State Contractors License #: ZAYOGGL898PJ City of Renton Business License #: "I certify that I am The owner or appy 's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit �l ly w" City oIRenton's Trench Restoration and Street Overlay Requirements. " Signature ( 1 // / / / Date 7/3/18 INSPECTION"nAtLL AE REOLW T 4 -HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 25-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum or 14 Plan Review/Develapment Engineering Date Site Construction Inspector I Development Engineering Manager Date Date to the lob start date. ❑ Approved as submitted © Pre -Construction Meeting required ❑ Approved with comments or redlines ® Camera inspection of utilities required Page 1 of 11 Published: 2/1/2018