HomeMy WebLinkAboutFranchise App Renton SE73XC042 - SignedDEPARTMENT OF COMMUNITY CITY OF
AND ECONOMIC DEVELOPMENT on 10
Planning Division 1 1055 South Grady Way, 6` Floor I Renton, WA 98057 1425-430-7200
Email: franchisepermits@rentonwa.eov Website: rentonwa.eov
77 FRANCHISE PERMIT APPLICATION
Published: 2/1/2018
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50.
Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00
Franchise Agency: Zayo Group (Authorized Agent: Fibe Solutions)
Franchise Job Number:
Phone: 208-392-1925
Contact Name: Matthew Travis( Auth: Charlotte Foster) Email: Matthew.travis@zayo.com
Job Site Address:
Description of Work:
3205 NE 4th St Renton, WA 98056 Project Name: SE73XCO42
New Underground 693', Tie into Existing 15': Sweep (3) 1-1/4" HDPE conduits into existing
Zayo vault leave 150' tail. Directional bore under grass/ asphalt roadway, pull fiber through. Install 24"x36" vault
in grass area. Trench in grass and install HDPE conduits, pull fiber. Hog/driveway/sidewalk pull fiber through.
Please check all that apply:
❑ New Construction ❑ Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street
❑✓ Open Trench R1 Bore # of feet: T=272' H=91' B=330'
Contractor Name: Zayo Phone: 206-832-4853
State Contractors License #: ZAYOGGL898PJ City of Renton Business License it:
"I certify that I am the er licant's authorized agent and do hereby agree to abide to the terms and conditions set forth
under this perm a co - y of Renton's Trench Restoration and Street Overlay Requirements. "
Signatur Date 10/25/18
INSPECTIO SHALL E Q ED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour.
All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date ❑ Approved as submitted
❑ Pre -Construction Meeting required
Site Construction Inspector Date 0 Approved with comments or redlines
❑ Camera inspection of utilities required
Development Engineering Manager Date
Page 1 of 1 I Published: 2/1/2018