Loading...
HomeMy WebLinkAboutFranchise App Renton SE73XC042 - SignedDEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENT on 10 Planning Division 1 1055 South Grady Way, 6` Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.eov Website: rentonwa.eov 77 FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 Franchise Agency: Zayo Group (Authorized Agent: Fibe Solutions) Franchise Job Number: Phone: 208-392-1925 Contact Name: Matthew Travis( Auth: Charlotte Foster) Email: Matthew.travis@zayo.com Job Site Address: Description of Work: 3205 NE 4th St Renton, WA 98056 Project Name: SE73XCO42 New Underground 693', Tie into Existing 15': Sweep (3) 1-1/4" HDPE conduits into existing Zayo vault leave 150' tail. Directional bore under grass/ asphalt roadway, pull fiber through. Install 24"x36" vault in grass area. Trench in grass and install HDPE conduits, pull fiber. Hog/driveway/sidewalk pull fiber through. Please check all that apply: ❑ New Construction ❑ Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑✓ Open Trench R1 Bore # of feet: T=272' H=91' B=330' Contractor Name: Zayo Phone: 206-832-4853 State Contractors License #: ZAYOGGL898PJ City of Renton Business License it: "I certify that I am the er licant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this perm a co - y of Renton's Trench Restoration and Street Overlay Requirements. " Signatur Date 10/25/18 INSPECTIO SHALL E Q ED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date ❑ Approved as submitted ❑ Pre -Construction Meeting required Site Construction Inspector Date 0 Approved with comments or redlines ❑ Camera inspection of utilities required Development Engineering Manager Date Page 1 of 1 I Published: 2/1/2018