HomeMy WebLinkAboutAdden 2Renton Avenue South Resurfacing ADDENDUM NO. 2
TED4003844 February 1, 2019
Page 1 of 2
Addendum No. 2
Renton Avenue South Resurfacing
Federal Aid Number: STP(UL)-1201(023)
Date of Issue: February 1, 2019
Bid Due Date: February 12, 2019 (CHANGED FROM DATE IN CALL FOR BIDS)
Date of Bid Opening: February 13, 2019 (CHANGED FROM DATE IN CALL FOR BIDS)
ATTENTION: ALL BIDDERS AND PLAN HOLDERS:
The Bid Documents for the above-named project are modified as described below. Bidders
shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall attach this addendum to their copy of the Contract Documents, and shall
acknowledge receipt of this Addendum on the Proposal Signature Page. A Proposal may be
considered irregular and may be rejected if the receipt of Addenda is not acknowledged. A
Proposal will be considered irregular and will be rejected if the Schedule of Prices included in
this Addendum is not completed and submitted with the Proposal.
THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS:
1. BID DUE DATE AND BID OPENING DATE
Sealed bids will be received by the City of Renton, at the City Clerk’s Office, located on
the 7th floor of Renton City Hall, until 10:30 AM on Tuesday, February 12, 2019. All
supplemental documents, that are allowed to be submitted after this date and time, shall
be delivered to the City Clerk’s Office. The bids will be opened and publicly read at 11:30
AM on Wednesday, February 13, 2019 in room #511, located on the 5th floor of Renton
City Hall. Renton City Hall is located at 1055 South Grady Way, Renton, WA 98057.
2. FUTURE ADDENDA
A future addendum is planned the week of Monday, February 3, 2019, that will be revising
select sections of the Special Provisions and the Schedule of Prices.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.