HomeMy WebLinkAboutSR_ERC_Chickfila_190204.pdf
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SIGNATURES:
Gregg Zimmerman, Administrator
Public Works Department
Date Rick M. Marshall, Administrator
Renton Regional Fire Authority
Date
Kelly Beymer, Administrator
Community Services Department
Date C.E. Vincent, Administrator Date
Department Of Community & Economic Development
ENVIRONMENTAL (SEPA) DETERMINATION OF
NON-SIGNIFICANCE - MITIGATED (DNS-M)
PROJECT NUMBER: LUA18-000619
APPLICANT: Carlos Arias, 4G Development & Consulting, Inc. / carias@4gdev.com / PO Box
270571, San Diego, CA 92198
PROJECT NAME: Chick-fil-A Restaurant
PROJECT DESCRIPTION: The applicant is requesting Administrative Site Plan Review, Environmental
Threshold Determination (SEPA), and two Modifications from the development regulations to construct an approximate
4,000 square foot fast food restaurant with two (2) vehicle drive through lanes and 47 surface parking spaces located at
361 Rainier Ave S. Associated site improvements including new stormwater infrastructure and landscaping is also included
with the proposal. The existing vacant building (formerly Diamond Lil’s Casino) would be removed. The subject property
is comprised of three (3) lots totaling 0.96 acres and is located in the Commercial Mixed Use Comprehensive Plan land use
designation and Commercial Arterial (CA) zoning classification. Vehicle access to the subject property would be provided
in a relocated driveway on Rainier Ave S and within an existing easement in the abutting Renton Center Shopping Center.
The applicant has requested a modification to the parking requirements (RMC 4-4-080F.10.d) to exceed the maximum
number of required parking spaces and a modification to the refuse and recycling standards (RMC 4-4-090C.10) for
enclosure roof height. The applicant proposes to retain one (1) of the subject property’s five (5) existing trees. The City’s
mapping system indicates the site is within a High Seismic Hazard Area and Wellhead Protection 5-year Capture Zone.
PROJECT LOCATION: 361 Rainier Ave S (APNs 0007200149, 0007200151, 0007200215)
LEAD AGENCY: City of Renton
Environmental Review Committee
Department of Community & Economic Development
The City of Renton Environmental Review Committee has determined that it does not have a probable significant adverse
impact on the environment. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c).
Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of
Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified
during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not
act on this proposal for fourteen (14) days.
Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on February 22, 2019.
Appeals must be filed in writing together with the required fee with: Hearing Examiner, City of Renton, 1055 South Grady
Way, Renton, WA 98057. Appeals to the Examiner are governed by RMC 4-8-110 and more information may be obtained
from the Renton City Clerk’s Office, (425) 430-6510.
PUBLICATION DATE: February 8, 2019
DATE OF DECISION: February 4, 2019
DocuSign Envelope ID: 5B8699B2-C7E5-4978-9A25-617BA2FA30E3
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Project Location Map
SR_ERC_Chickfila_190204
ENVIRONMENTAL REVIEW COMMITTEE REPORT
ERC Meeting Date: February 4, 2019
Project File Number: PR18-000439
Project Name: Chick-fil-A Restaurant
Land Use File Number: LUA18-000619, ECF, SA-A, MOD, MOD
Project Manager: Matt Herrera, Senior Planner
Owner: Nelson Gould LLC, 10620 NE 174th Pl, Bothell, WA 98011
Applicant: Don Ikeler, Chick-fil-A, Inc, 15635 Alton Pkwy, Suite 350, Irvine, CA 92619
Contact: Carlos Arias, 4G Development & Consulting, Inc, PO Box 270571, San Diego, CA 92198
Project Location: 361 Rainier Ave S, Renton, WA 98055
Project Summary: The applicant is requesting Administrative Site Plan Review, Environmental Threshold
Determination (SEPA), and two Modifications from the development regulations to
construct an approximate 4,000 square foot fast food restaurant with two (2) vehicle drive
through lanes and 47 surface parking spaces located at 361 Rainier Ave S. Associated site
improvements including new stormwater infrastructure and landscaping is also included
with the proposal. The existing vacant building (formerly Diamond Lil’s Casino) would be
removed. The subject property is comprised of three (3) lots totaling 0.96 acres and is
located in the Commercial Mixed Use Comprehensive Plan land use designation and
Commercial Arterial (CA) zoning classification. Vehicle access to the subject property would
be provided in a relocated driveway on Rainier Ave S and within an existing easement in
the abutting Renton Center Shopping Center. The applicant has requested a modification
to the parking requirements (RMC 4-4-080F.10.d) to exceed the maximum number of
required parking spaces and a modification to the refuse and recycling standards (RMC 4-
4-090C.10) for enclosure roof height. The applicant proposes to retain one (1) of the subject
property’s five (5) existing trees. The City’s mapping system indicates the site is within a
High Seismic Hazard Area and Wellhead Protection 5-year Capture Zone.
Exist. Bldg. Area SF: 5,049 square feet Proposed New Bldg. Area (footprint):
Proposed New Bldg. Area (gross):
4,042 square feet
4,042 square feet
Site Area: 41,308 square feet Total Building Area GSF: 4,042 square feet
STAFF
RECOMMENDATION:
Staff Recommends that the Environmental Review Committee issue a Determination of
Non-Significance - Mitigated (DNS-M).
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 2 of 9
SR_ERC_Chickfila_190204
PART ONE: PROJECT DESCRIPTION / BACKGROUND
The existing property contains a vacant 5,049 square foot building (former Diamond Lil’s Casino) located on the
northern portion of the property that abuts the Firestone automotive building located at 351 Rainier Ave S (Exhibit 2).
The site contains a surface parking area and vacant unimproved area containing grasses and erosion control planting.
Existing access to the subject property is provided via a right in/right out driveway located on Rainier Ave S (Principal
Arterial) approximately 170 linear feet north of the intersection centerline of S. 3rd Pl/Renton Center Way SW and
Rainier Ave S. Additional access is located (and granted by easement via Fred Meyer Short Plat File LUA16-000254)
along the southern portion of the property abutting Renton Center Way SW (private street) and at the western portion
of the property into the Renton Village Shopping Center. Frontage improvements consisting of a new 8-foot wide
sidewalk, 6-foot wide planter strip, street lights, and drainage conveyance was recently constructed as part of a
corridor capital improvement project by the City. The land use designation and zoning classification for the subject
property and surrounding vicinity is Commercial Mixed Use (CMU) and Commercial Arterial (CA), respectively. Fast
food restaurants are permitted in the CA zone and drive through services are permitted as an accessory provided it is
located on the same lot with another building/use; or it is structurally integrated into another building/use; or it is
located on its own lot with some amount of indoor customer seating to qualify the drive-through as “accessory” to
the eating/drinking establishment.
The applicant is requesting Environmental Review, Administrative Site Plan Review, and one Modification to the City’s
parking regulations to construct an approximate 4,000 square foot fast food restaurant with an accessory drive-
through service window located on three parcels (APNs 000720-0149, -0151, and -0215) at 361 Rainier Ave S (Exhibit
3). The former Diamond Lil’s building located on the northern portion of the subject property would be removed as
part of the proposal. The applicant’s proposal would include the new fast food restaurant building located near the
southeast corner of the property with a drive through window and lane on the north side of the building. Street
frontage landscaping approximately 17 feet in width would be located along the Rainier Ave S frontage and internal
parking lot landscaping would be provided in islands and bulbs interior to the project (Exhibit 4). The applicant has
proposed to retain one (1) of the site’s five (5) significant trees located on the southwest corner of the subject property
(Exhibits 5 and 6).
The applicant has proposed to relocate the existing driveway along Rainier Ave S to the northern edge of the property
approximately 3 feet from the property line (Exhibit 7). The southern access point along Renton Center Way SW would
be closed and replaced with a pedestrian pathway parallel to the southern property line. The existing vehicle access
point at the southwest corner of the property would remain. The applicant proposes 42 on-site surface parking spaces
and five (5) off-site compact spaces located on the abutting shopping center property. The applicant has requested a
modification to the maximum parking regulations for sit down/drive through restaurants (RMC 4-4-080F.10.d) that
limits parking spaces to one (1) space per 75 square feet of dining area. The applicant has proposed 1,384 square feet
of dining area thereby limiting parking to 18 spaces (1,384sf/75sf=18 spaces).
The applicant would construct flow control and water quality treatment to mitigate stormwater impacts associated
with the proposal. The applicant has proposed a bioretention and oil/water separator with modular wetland facility
prior to releasing to the City’s stormwater system (Exhibits 8 and 9) within Rainier Ave S. The site is relatively flat,
resulting in minimal site grading. On-site soils consist of a 10- to 12-foot layer of very loose silt and sand combined
with a high water table resulting in susceptibility to liquefaction during an earthquake (Exhibit 11). The City’s COR
mapping system has also indicated this site is within a potential High Seismic Hazard Area.
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 3 of 9
SR_ERC_Chickfila_190204
PART TWO: ENVIRONMENTAL REVIEW
In compliance with RCW 43.21C.240, the following environmental (SEPA) review addresses only those project
impacts that are not adequately addressed under existing development standards and environmental regulations.
A. Environmental Threshold Recommendation
Based on analysis of probable impacts from the proposal, staff recommends that the Responsible Officials:
Issue a DNS-M with a 14-day Appeal Period.
B. Mitigation Measures
1. The project shall comply with the recommendations of the geotechnical report, prepared by Terracon
Consultants, dated June 21, 2018, and any updated report(s) associated with the building and
construction permits to ensure compliance with the intent of the initial report.
2. The applicant’s geotechnical engineer shall review the project’s construction and building permit plans
to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a sealed
letter stating that he/she has reviewed the construction and building permit plans and in their opinion
the plans and specifications meet the intent of the report(s).
3. The applicant shall submit an Inadvertent Discoveries Plan prepared by a qualified professional with the
civil construction permit for review and approval by the Current Planning Project Manager prior to
permit issuance.
4. The applicant shall provide a professional archeologist on-site to monitor all ground disturbing activities
and provide the opportunity for Concerned Tribes to have a tribal monitor on-site. Ground disturbing
activities include but are not limited to geotechnical testing, concrete removal, utility removal and
replacement, and building excavation. The archeologist shall prepare a monitoring report to be
submitted to the Current Planning Project Manager and DAHP prior to Temporary Certificate of
Occupancy.
5. The applicant shall comply with the Revised Traffic and Parking Management Plan component of the
Traffic Impact Analysis prepared by Transportation Engineering NorthWest dated February 1, 2019, and
any updated report(s) associated with the plan’s monitoring element to ensure the restaurant’s vehicle
queueing does not adversely impact Rainier Ave S.
6. The initial weekly coordination meeting with the applicant and Renton Police Department shall occur
prior to issuance of Temporary Certificate of Occupancy.
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 4 of 9
SR_ERC_Chickfila_190204
C. Exhibits
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Neighborhood Detail Map
Exhibit 3: Site Plan
Exhibit 4: Landscape Plan
Exhibit 5: Arborist Report prepared by Greenforest Incorporated, dated August 7, 2018
Exhibit 6: Tree Removal Plan
Exhibit 7: Utilities Plan
Exhibit 8: Technical Information Report prepared by Barghausen Consulting Engineers, dated
August 16, 2018
Exhibit 9: Drainage Control Plan
Exhibit 10: Grading Plan
Exhibit 11: Geotechnical Report prepared by Terracon Consultants, dated June 21, 2018
Exhibit 12: Construction Mitigation Description
Exhibit 13: Exterior Elevations
Exhibit 14: Color Renderings
Exhibit 15: Archeological Monitoring Request from Washington State Department of Archeology
and Historic Preservation, dated October 3, 2018
Exhibit 16: Transportation Impact Analysis (Revised) prepared by Transportation Engineering NW,
dated,February 1 2019
Exhibit 17: Public Comment Letter and Staff Response
Exhibit 18: Transportation Concurrency Memo
Exhibit 19: Advisory Notes
D. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the
applicant has adequately identified and addressed environmental impacts anticipated to occur in conjunction
with the proposed development. Staff reviewers have identified that the proposal is likely to have the following
probable impacts:
1. Earth
Impacts: The subject property is relatively flat with a 3-foot drop in elevation over approximately 300
linear feet from the northeast corner of the site to southwest corner. COR maps has identified the site is
within a High Seismic Hazard Area.
Subsurface reconnaissance and assessment was conducted by the applicant’s geotechnical engineer and
summarized in the submitted geotechnical report prepared by Terracon, dated June 21, 2018 (Exhibit
11). Eight (8) subsurface borings were conducted on the site with a maximum depth of 51.5 feet.
Findings from the borings identify pavement up to 1 foot in depth, up to 2 feet of fill consisting of silty
gravel and sand, and alluvial deposits consisting of silt and sand with loose to very loose consistency.
Groundwater was encountered at 8 and 12 feet in borings located near the intersection of Rainer Ave S
and Renton Center Way SW and near the southeast corner of the location of the proposed building.
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 5 of 9
SR_ERC_Chickfila_190204
The Geotechnical Report confirmed the COR map identification of a High Seismic Hazard potential as the
analysis indicated the site’s geology and subsurface groundwater conditions result in a high risk of
liquefaction during a design level earthquake which is most likely to trigger between eight (8) and 20 feet
below the ground surface. As the site is relatively flat, the analysis concluded the risk of lateral spreading
is low and can be mitigated with seismic ties between footings or grade beams between pile caps. Vertical
settlements modeled by the geotechnical engineer found estimates of between 4 and 16 inches of
liquefaction-induced settlement of the ground surface based on their understanding of the regional
geology and alluvial deposits of the site.
In order to mitigate the potential for liquefaction-induced settlement, the geotechnical engineer has
recommended the use of a shallow foundation combined with a ground improvement such as aggregate
piers or a structural floor slab supported on small diameter (pin) piles. Any ground improvement method
would likely need to extend approximately 20 feet below the surface where dense to medium sandy
gravels form the bearing stratum to support the improvement. If pin piles are used, it is likely they will
need to reach between 25 and 30 feet below the surface to be effective. Due to the report’s confirmation
of the liquefaction potential for the site and recommendations for mitigating its effects during an
earthquake, staff recommends, as a mitigation measure, the applicant comply with the recommendations
of the geotechnical report, prepared by Terracon Consultant dated June 21, 2018 and future addenda. As
the geotechnical report was prepared prior to the final design of the project, staff recommends as a
mitigation measure, the applicant’s geotechnical engineer review the project’s construction and building
permit plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit
a sealed letter stating that he/she has reviewed the construction and building permit plans and in their
opinion the plans and specifications meet the intent of the report(s).
Mitigation Measures:
a. The project shall comply with the recommendations of the geotechnical report, prepared by Terracon
Consultants, dated June 21, 2018, and any updated report(s) associated with the building and
construction permits to ensure compliance with the intent of the initial report. .
b. The applicant’s geotechnical engineer shall review the project’s construction and building permit
plans to verify compliance with the geotechnical report(s). The geotechnical engineer shall submit a
sealed letter stating that he/she has reviewed the construction and building permit plans and in their
opinion the plans and specifications meet the intent of the report(s).
Nexus: City of Renton Comprehensive Plan Policy L-37, RMC 4-3-050 Critical Areas Regulations
2. Air
Impacts: It is anticipated that some temporary air quality impacts could be associated with site work and
building construction required to develop this site. Project development impacts during construction may
include dust as a result of grading and exhaust from construction vehicles and equipment. Dust control
would be mitigated through the use of temporary erosion control measures, watering or other measures
to remediate impacts as needed (Exhibit 12). Long term emissions from vehicles and vapors from the Type
I hood required for the kitchen would occur following construction.
No further site specific mitigation for the identified impacts from typical vehicle and construction exhaust
or cooking emissions is required.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
3. Water
a. Ground Water
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 6 of 9
SR_ERC_Chickfila_190204
Impacts: The COR mapping system has identified the property is located in a Wellhead Protection Five (5)
Year Capture Zone due to its proximity to the City’s source of drinking water. The site’s proposed
restaurant use is not indicative of a type of use that would potentially harm the City’s groundwater.
However, any off-site fill materials shall be from a verifiable source in order to ensure it is clear of
contaminants. The City’s grading and excavation regulations require imported fill in excess of 100 cubic
yards within the Five (5) Year Capture Zone have a source statement certified by a qualified professional
or confirm the fill was obtained from a WSDOT approved source.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
b. Storm Water
Impacts: The applicant submitted a Technical Information Report (TIR) prepared by Barghausen
Consulting Engineers dated August 16, 2018 (Exhibit 8) with the land use application. The report
analyzes existing conditions and proposed surface water collection and distribution. The site is within
the Black River drainage basin and Peak Rate Flow Control Standard (Existing Site Conditions). The
existing stormwater infrastructure on the subject property consists of two (2) catch basins collecting
flows with pipes connecting to the existing public system located in Rainier Ave S. There appears to
be no flow control or water quality features on the site.
To mitigate stormwater impacts from the new restaurant, the applicant proposes to utilize a series of
catch basins and pipes within the parking lot to convey stormwater to an oil/water separator and then
through a modular wetland treatment device prior to release into the City’s system in Rainier Ave S.
Stormwater generated from the building’s roof and pedestrian areas are proposed to be conveyed to
a bioretention basin. The TIR anticipates the proposed infrastructure improvements will have the
capacity to convey the 25-year peak flow without overtopping the catch basins.
The proposal is subject to Full Drainage Review in accordance with the 2017 Renton Surface Water
Design Manual (RSWDM). It is anticipated that design requirements within the manual will adequately
mitigate stormwater impacts and no further mitigation is needed.
Mitigation Measures: No further mitigation is recommended.
Nexus: Not applicable.
4. Vegetation
Impacts: Most of the property is covered with impervious surfaces with the exception of an area
containing erosion control grasses in the south central portion of the property and five (5) significant trees
with several low lying shrubs and groundcover located on the southern perimeter. The significant trees
are Red Maples (Acer rubrum) with DBHs ranging between approximately 8 inches and 21 inches. The
arborist report (Exhibit 5) has indicated that all the trees are viable and in generally good to excellent
health. Structure for the trees are noted as fair with minor visible problems. The applicant proposes to
remove four (4) of the five (5) significant trees resulting in a 20 percent (20%) significant tree retention
rate. RMC 4-4-130H.1.a.iii requires a minimum of 10 percent (10%) of the significant trees be protected
and retained in commercial developments. However, the purpose statement of the tree retention
regulations make clear that minimizing indiscriminate removal and promoting land development practices
that result in minimal adverse disturbances to existing vegetation are paramount to the City’s tree
preservation policies. Staff will identify the potential for retaining additional trees as a component of the
administrative site plan review decision.
As shown on the submitted landscape plan (Exhibit 4), the applicant would provide street frontage
landscaping along Rainier Ave S consisting of seven (7) Pacific Sunset Maples and three (3) Shademaster
Locusts with eight (8) varieties of shrubs and groundcover. Internal lot landscaping includes Standard
Arbutus and Shademaster Locusts located in landscape islands with shrubs and ground cover. A
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 7 of 9
SR_ERC_Chickfila_190204
bioretention facility with rain garden plantings is proposed in the southern portion of the property. Staff
will identify whether the proposed plantings meet the City’s landscape regulations and recommend
conditions of approval (if needed) with the site plan review decision.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
5. Aesthetics
Impacts: The proposed building would be a single-story with parapet-type walls extending above the roof
line to approximately 22 feet above grade at its highest point (Exhibits 13 and 14). Exterior cladding
includes a brick façade along the ground level with stucco along the building’s upper story topped with
prefinished metal coping. The drive through window, outdoor dining areas, and entrances are topped with
metal awnings at various depths. Expansive glazing is provided on the south elevation with limited
fenestration provided on remaining facades. The applicant would be required to comply with the City’s
Urban Design Regulations for overlay District ‘D’ as a component of the site plan review application.
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
6. Historic and Cultural Preservation
Impacts: According to the Washington Information System for Architectural and Archaeological Records
Data (WISAARD) mapping database accessed by City staff on October 16, 2018, the subject property is
located near the eastern banks of the former alignment of the Black River and approximately 1,000 feet
north of an Indian Site. On October 3, 2018, the City received a letter from the Washington State
Department of Archeology and Historic Preservation (DAHP) (Exhibit 15) recommending professional
archeological monitoring during all ground-disturbing activities and to allow Concerned Tribes be
provided the opportunity to have a tribal monitor on-site. Additionally, DAHP has recommended that an
Inadvertent Discoveries Plan be prepared prior to construction that would provide direction should
artifacts be encountered during development of the site. According to the DAHP letter it is typical for an
archeological survey to be completed prior to construction. However, the site is nearly completely
hardscaped, therefore not conducive to a survey prior to ground disturbing work. Due to the proximity to
archeological sites near the project area and the recommendation from DAHP, staff recommends , as a
mitigation measure, the applicant submit an Inadvertent Discoveries Plan prepared by a qualified
professional with the civil construction permit application for review and approval by the Current Planning
Project Manager prior to permit issuance. Due to the high probability of encountering archeological
remains on the subject property, staff recommends, as a mitigation measure, the applicant provide a
professional archeologist on-site to monitor all ground disturbing activities and provide the opportunity
for Concerned Tribes to have a tribal monitor on-site. Ground disturbing activities include but are not
limited to geotechnical testing, concrete removal, utility removal and replacement, and building
excavation. The archeologist shall prepare a monitoring report to be submitted to the Current Planning
Project Manager and DAHP prior to Temporary Certificate of Occupancy.
Mitigation Measures:
a. The applicant shall submit an Inadvertent Discoveries Plan prepared by a qualified professional with
the civil construction permit for review and approval by the Current Planning Project Manager prior
to permit issuance.
b. The applicant shall provide a professional archeologist on-site to monitor all ground disturbing
activities and provide the opportunity for Concerned Tribes to have a tribal monitor on-site. Ground
disturbing activities include but are not limited to geotechnical testing, concrete removal, utility
removal and replacement, and building excavation. The archeologist shall prepare a monitoring report
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 8 of 9
SR_ERC_Chickfila_190204
to be submitted to the Current Planning Project Manager and DAHP prior to Temporary Certificate of
Occupancy.
Nexus: City of Renton Comprehensive Plan Policies L-46 and L-47; RCW 27.53 Archaeological Sites and
Resources and RCW 27.44 Indian Graves and Records; Chapter 197-11 WAC; SEPA Rules
7. Transportation
Impacts: The subject property abuts Rainier Ave S along the east property line and Renton Center Way
SW (a private street associated with Renton Center Shopping Center) along the southern property line.
Rainier Ave S is a principal arterial that was recently updated with new frontage improvements as part of
a corridor capital project funded by the City, therefore no frontage improvements or dedication would be
required. Access from the subject property to Renton Center Way SW and to the shopping center is
identified in the Fred Meyer Short Plat (File LUA16-000254) recorded with King County Recorder’s Office
December 12, 2016.
The applicant submitted a Transportation Impact Analysis (TIA) prepared by Transportation Engineering
Northwest, dated February 1, 2019 (Exhibit 16). The proposal is estimated to generate 988 new weekday
trips with 86 new trips occurring during the weekday AM peak hour (44 entering, 22 exiting) and 68 new
trips occurring during the weekday PM peak hour (35 entering, 33 exiting). Following completion of the
project, the signalized intersection at Rainer Ave S and S 3rd Pl is expected to operate at a Level of Service
(LOS) of C or better and site access at the proposed right in/right out driveway along Rainier Ave S is
expected to operate at LOS B or better. Projected queues (95th Percentile) at the driveway location are
anticipated to be less than 25 feet during AM and PM peak hours.
The City received one (1) public comment letter on September 22, 2018 from Curt Kruse (Exhibit 17) owner
of the abutting parcel to the north (351 Rainier Ave S) that Mr. Kruse currently leases to a Firestone vehicle
service facility. The letter expresses concern related to potential queuing from the proposed restaurant
onto Rainier Ave S that would impact his tenant’s customers’ ability to access their entrance which would
result in a financial loss.
The Renton Police Department has reviewed the proposed site plan and TIA. Additionally, the department
had discussions with their counterparts in the cities of Bellevue, Covington, and Federal Way. In these
discussions, the Renton Police Department found that all three (3) cities had experienced long lasting
traffic impacts on city streets and police services that were atypical to any other grand opening of a fast
food restaurant (Exhibit 19).
The Chick-fil-A brand is relatively new to the Puget Sound region and the popularity of the restaurant in
several of the nearby cities where they have located has resulted in vehicle queues that extend off-site
and into abutting streets. Due to these concerns, the applicant attended a meeting with City staff that
included the Renton Police Department Traffic Commander and Sergeant on November 14, 2018 to
discuss the Traffic and Parking Management Plan component of the originally submitted TIA and concerns
the City had regarding potential impacts to Rainier Ave S. It was determined that a menu of mitigation
measures were needed to ensure queues onto Rainier Ave S would not occur and were subsequently
incorporated into the revised TIA (Exhibit 16). Those items include weekly coordination meetings to
evaluate the effectiveness of mitigation measures and determine appropriate off-duty police staffing
levels, off-duty police staffing at the Rainier Ave S entrance and intersection of Rainier Ave S and S. 3rd
Pl/Renton Center Way SW, and on-site Chick-fil-a staff positioned near the drive-through entrance and
exit to keep vehicles moving and maintain clear path for pedestrians. It was also determined that
ultimately the Renton Police Department Traffic Commander will assess the conditions on a regular basis
and anytime traffic volumes are deemed a hazard or impact traffic on Rainier Ave S, revisions to the Traffic
and Parking Management Plan may be made on an “as needed basis.”
Due to the applicant’s acknowledgment of potential impacts caused by the restaurant’s popularity,
information provided by nearby cities of impacts caused by recently opened Chick-fil-A restaurants, and
City of Renton Department of Community & Economic Development
Chick-fil-A Restaurant
Staff Report to the Environmental Review Committee
LUA18-000619, ECF, SA-A, MOD, MOD
Report of February 4, 2019 Page 9 of 9
SR_ERC_Chickfila_190204
the November 14, 2018 meeting with the applicant and City staff, staff recommends as a mitigation
measure the applicant comply with the Traffic and Parking Management Plan component of the Traffic
Impact Analysis and any future addenda to the plan. Additionally, the initial weekly coordination meeting
with the applicant and Renton Police Department shall be held prior to Temporary Certificate of
Occupancy.
The proposal has passed the City’s Traffic Concurrency Test per RMC 4-6-070.D (Exhibit 18), which is based
upon a test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested
Transportation Plan, and future payment of appropriate Transportation Impact Fees.
Mitigation Measures:
a. The applicant shall comply with the Revised Traffic and Parking Management Plan component of the
Traffic Impact Analysis prepared by Transportation Engineering NorthWest dated February 1, 2019,
and any updated report(s) associated with the plan’s monitoring element to ensure the restaurant’s
vehicle queueing does not adversely impact Rainier Ave S.
b. The initial weekly coordination meeting with the applicant and Renton Police Department shall occur
prior to issuance of Temporary Certificate of Occupancy.
Nexus: City of Renton Comprehensive Plan Goal T-A; RMC 4-4-080 Parking, Loading, and Driveway
Regulations
8. Fire & Police
Impacts: Police and Fire Prevention staff indicated that sufficient resources exist to furnish services to the
proposed development; provided the applicant constructs Code-required improvements, pays associated
impact fees, and implements transportation related mitigation as recommended by the Police
Department (Exhibit 19).
Mitigation Measures: No further mitigation recommended.
Nexus: Not applicable.
E. Comments of Reviewing Departments
The proposal has been circulated to City Department and Division Reviewers. Where applicable, their comments
have been incorporated into the text of this report and/or “Advisory Notes to Applicant.”
Copies of all Review Comments are contained in the Official File and may be attached to this report.
The Environmental Determination decision will become final if the decision is not appealed within the 14-day
appeal period (RCW 43.21.C.075(3); WAC 197-11-680).
Environmental Determination Appeal Process: Appeals of the environmental determination must be filed in writing
together with the required fee to: Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98057, on
or before 5:00 p.m. on February 22, 2019. RMC 4-8-110 governs appeals to the Hearing Examiner and additional
information regarding the appeal process may be obtained from the City Clerk’s Office, Renton City Hall – 7th Floor,
(425) 430-6510.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE ENVIRONMENTAL REVIEW COMMITTEE
EXHIBITS
Project Name:
Chick-fil-A Restaurant
Land Use File Number:
LUA18-000619, ECF, SA-A, MOD, MOD
Date of Meeting
February 4, 2019
Staff Contact
Matt Herrera
Senior Planner
Project Contact/Applicant
Carlos Arias
4G Development & Consulting, Inc
PO Box 270571, San Diego, CA 92198
Project Location
361 Rainier Ave S, Renton,
WA 98055
The following exhibits are included with the ERC Report:
Exhibit 1: Environmental Review Committee (ERC) Report
Exhibit 2: Neighborhood Detail Map
Exhibit 3: Site Plan
Exhibit 4: Landscape Plan
Exhibit 5: Arborist Report prepared by Greenforest Incorporated, dated August 7, 2018
Exhibit 6: Tree Removal Plan
Exhibit 7: Utilities Plan
Exhibit 8: Technical Information Report prepared by Barghausen Consulting Engineers, dated
August 16, 2018
Exhibit 9: Drainage Control Plan
Exhibit 10: Grading Plan
Exhibit 11: Geotechnical Report prepared by Terracon Consultants, dated June 21, 2018
Exhibit 12: Construction Mitigation Description
Exhibit 13: Exterior Elevations
Exhibit 14: Color Renderings
Exhibit 15: Archeological Monitoring Request from Washington State Department of Archeology
and Historic Preservation, dated October 3, 2018
Exhibit 16: Transportation Impact Analysis (Revised) prepared by Transportation Engineering NW,
dated February 1, 2019
Exhibit 17: Public Comment Letter and Staff Response
Exhibit 18: Transportation Concurrency Memo
Exhibit 19: Advisory Notes
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
A
FSR#CHICK-FIL-A1
B
C
D
E
A
B
C
D
E
234
1234
5
5
I:\Chick-fil-A\16-Jobs\16-144361RainierAve.South,Renton,WA\Graphics\20CustomDesign\20.2SchematicDesign\001-04249SP-1.dwgSheetNo:SITEPLANSavedby:tony-Tuesday,August21,201810:59AMPrintedby:TonyMorales-August21,201810:59AM1833 E. 17th. Street; Suite 301Santa Ana, CA. 92705Phone 714.832.1834
WWWWW
W
W
W
W
W
W
W
W
WWWWWWWWWW
W
W
W
W
W
W
W
WWWWW
W
W
W
W
W
SOU
T
H
3
R
D
P
L RAIN
IER
AVE
SOUTH
FIRE HYDRANT
FIRE HYDRANT
9 SP
A
C
E
S6 SPACES6 SPACES6 SPACES
6 SPA
C
E
S
6 SPA
C
E
S
4 SPAC
E
S
4 SPAC
E
S
20" ACER RUBRUM
TO BE RETAINED
20" ACER RUBRUM,
TO BE REMOVED
12" ACER RUBRUM ,
TO BE REMOVED
8" ACER RUBRUM,
TO BE REMOVED
6" DEC
6" DEC
12" ACER
RUBRUM, TO
BE REMOVED
TRASH ENCLOSURE
167.2'225.5'
PROP LINE, TYP
117.51 sq.ft.
117.51 sq.ft.274.50 sq.ft.
141.02 sq.ft.
314.66 sq.ft.
4471.24 sq.ft.
238.93 sq.ft.
1643.05 sq.ft.
432.30 sq.ft.
216.65 sq.ft.
1192.68 sq.ft.
25.50 sq.ft.
414.63 sq.ft.
126.96 sq.ft.
31.17 sq.ft.
126.31 sq.ft.
331.67 sq.ft.
415.07 sq.ft.
24.89 sq.ft.
JJ
J J
J J
JJJJ
JJ
J JJJ
J J
J D
D
D
D
D
DD
D
D
D
D
DD
D
D
D D D
D
CkCk
Ck
CkCk
CkCk
Ck
Ck
CkCk Ck CkCk Ck Ck Ck
Ck
Ck
Ck
Ck
Ck
Ck
D D
Ck
Sf Sf
Sf Sf
SfSf
Sf
Sf
Sf
Sf
Sf Sf
Sf
Sf Sf Sf
Sf Sf
Sf
Sf Sf Sf Sf Sf Sf
Og
Og
Og
Og
Sf
Sf
Sf
Sf Sf Sf Sf Sf Sf
Sf
Sf
SfSfSfSfSfSfSfSfSfSfSf
Sf Sf Sf
Sf Sf Sf Sf Sf Sf Sf Sf Sf
Sf
BIORETENTION AREA
105.51 sq.ft.
B
B
B
B
B
B
B
B
B B
B
B
B
BB
B
B
B
B
B B B
L L L
L L L L L L L L L L L L L L L L L L L L L
L
L
L L L L L
L L L L
L L L L
L L L L
L
LL
L L L L L L L L L L L L L L L L L L L L L
L
L
L
LL
H
H
H
HH
H
H
H
H
H
H
H
H
H
H H
H
H
HHH
H
H
H
HH
H
H
H
H H
H
H
H
H
HH
H H H H
L
LL
HH
H
H
H
H
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ms
MsMsMs
Ms
Ms
Ms
Ms
Ms
MsMsMs
MsMs
Ms
Ms
MsMsMsMs
Ms Ms
Ms Ms
Ms
LLLLLL
L L L L L
LLLLL
L L L L L L L L L L L L L L
L L L L L L L L L L L L L
LLL
L
L
L
Ca Ca Ca Ca CaCaCa
Ca
Ca
Ca
Ca
Ca Ca
Ca Ca
CaCa
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
B
B
B
B
B
B
B
B
B
B
B
B
B
B B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
B
B
B
B
B
B
B
B B B B B B B B B
B
B
B
BB
B
B
BBBBBBB
B
B
B
B
B
B
Ca
Ca
Ca
Ca Ca Ca
CaCa
Ca Ca Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
CaL
L
L
L
L
L
L
L
L
H
H
H
H
H
H
H
H
H
H
H
H
H
H
B
B
B
H
H
H
H
H
HHH
H HH
L
L
L
L
L
L L
L
L
L L L
LL
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
CaCa
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
Ca
L
L
L
L
L
L
L
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ms
Ca
Pt
PtPt
Pt
Pt
Pt
Pt
Pt
PtPt
Pt
Pt Pt
Pt
Pt
Pt
Pt
Pt
Pt
Pt
Pt
FF
FF
F
F
F
F
F
F
F
F
F F
F F
F
F
F
F
N N
N N
NN
N N
N
N
NNNNN
N
N N NN
N N N
N
N
N
N
N N
N
N N
N
NN
N N
N N
N N
N
NN N
N N
N
N
N N N N
N N N N N
NNNN
NN
F
F
F
F
NN
F
F
F
F
F F
F
F
F
PtPt
Pt
Pt
Pt Pt Pt
Pt Pt
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
ARCHITECT'S PROJECT #
PRINTED FOR
DATE
SHEET
SHEET NUMBER
DRAWN BY
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
FSR#CHICK-FIL-AP:\18000s\18963\preliminary\18963-PL.dwg Sheet No: L1 Saved by: jbarnes - Friday, August 17, 2018 9:19 AM Printed by: Jessi Barnes - August 17, 2018 9:31 AM361 RAINIER AVE S. RENTON, WA 98057 0000
XX-XXX
Plan'g, Building, Etc.
08-09-18
JLB01/21/19Dial 811
Call before you dig.
below.Know what's
TREES BOTANICAL NAME / COMMON NAME CONT.CAL.FOLIAGE QTY
ACER TRUNCATUM X A. PLAT. `WARRENRED` / PACIFIC SUNSET MAPLE B & B 2"DECIDUOUS 11
ARBUTUS X `MARINA` / ARBUTUS STANDARD B & B 2"EVERGREEN 9
GLEDITSIA TRIACANTHOS INERMIS `SHADEMASTER` TM / SHADEMASTER LOCUST B & B 2"DECIDUOUS 5
SHRUBS BOTANICAL NAME / COMMON NAME CONT.SPACING FOLIAGE QTY
BERBERIS THUNBERGII `CONCORDE` / REDLEAF BARBERRY #2 36" O.C.DECIDUOUS 97
CALAMAGROSTIS X ACUTIFLORA `KARL FOERSTER` / FEATHER REED GRASS #2 36" O.C.SEMI-DECIDUOUS 154
FOTHERGILLA X `BLUE SHADOW` / DWARF FOTHERGILLA #2 60" O.C.DECIDUOUS 33
HELICTOTRICHON SEMPERVIRENS `SAPPHIRE` / BLUE OAT GRASS #2 36" O.C.EVERGREEN 72
LAVANDULA ANGUSTIFOLIA `HIDCOTE BLUE` / HIDCOTE BLUE LAVENDER #2 36" O.C.DECIDUOUS 171
MISCANTHUS SINENSIS `LITTLE MISS' / MAIDEN GRASS #2 36" O.C.SEMI-DECIDUOUS 83
NANDINA DOMESTICA `MOON BAY` TM / HEAVENLY BAMBOO #2 60" O.C.EVERGREEN 66
PHORMIUM TENAX `ROSIE CHAMELEON` / NEW ZEALAND FLAX #2 48" O.C.EVERGREEN 30
RAIN GARDEN, ZONE 1 BOTANICAL NAME / COMMON NAME CONT.SPACING FOLIAGE QTY
DESCHAMPSIA CESPITOSA / TUFTED HAIR GRASS #2 48" O.C.EVERGREEN 21
JUNCUS EFFUSUS / SOFT RUSH #2 24" O.C.EVERGREEN 19
RAIN GARDEN, ZONE 2 BOTANICAL NAME / COMMON NAME CONT.SPACING FOLIAGE QTY
CORNUS SERICEA `KELSEYI` / KELSEYI DOGWOOD #2 36" O.C.DECIDUOUS 24
RAIN GARDEN, ZONE 3 BOTANICAL NAME / COMMON NAME CONT.SPACING FOLIAGE QTY
MAHONIA NERVOSA / OREGON GRAPE #2 36" O.C.EVERGREEN 4
POLYSTICHUM MUNITUM / WESTERN SWORD FERN #2 36" O.C.EVERGREEN 60
B
Ca
F
H
L
Ms
N
Pt
D
J
Ck
Og
Sf
PLANT SCHEDULE
EXISTING TREE TO REMAIN 3
PRESERVE AND PROTEXT EXISTING
TREE
-
EXISTING TREE TO BE REMOVED 4
-
EXISTING LANDSCAPE TO REMAIN 598 SF
PRESERVE AND PROTECT EXISTING
LANDSCAPE
-
NOTES:
1.PROPERTY ZONED "COMMERCIAL ARTERIAL (CA)"
2.47 PARKING SPACES PROPOSED
3.TREE CALIPER TO BE MEASURED AT 4.5' ABOVE GRADE
4.10,058 SF LANDSCAPE PROPOSED
CODE REQUIRED LANDSCAPE PROPOSED
PARKING LOT INTERIOR LANDSCAPE
1.1 TREE / 6 SPACES = 8 TREES REQUIRED 8 TREES
2.1 SHRUB / 20 SF LANDSCAPE = 537 SHRUBS REQUIRED 746 SHRUBS
PARKING LOT PERIMETER LANDSCAPE
1.1 TREE / 30' STREET FRONTAGE = 13 TREES REQUIRED 14 TREES
2.<50% SHRUBS DECIDUOUS REQUIRED 42.9%
TREE REPLACEMENT
1.3 TREES REQUIRED 3 TREES PRELIM. LANDSCAPE PLAN1 OF 2
L1
PRELIM. LANDSCAPE PLAN
P:\18000s\18963\preliminary\18963-PL.dwg, 8/17/2018 9:31:46 AM
Greenforest Incorporated
C o n s u l t i n g A r b o r i s t
4547 South Lucile Street, Seattle, WA 98118 Tel. 206-723-0656
TO: Carlos Arias, Project Engineer
4G Development and Consulting, Inc.
P.O. Box 270571
San Diego CA 92198
REFERENCE: Arborist Report, BCE #18963
SITE ADDRESS: 361 Rainier Ave., Renton WA
DATE: August 7, 2018
PREPARED BY: Favero Greenforest, ISA Certified Arborist # PN -0143A
ISA Tree Risk Assessment Qualified
ASCA Registered Consulting Arborist® #379
INTRODUCTION
You contacted me and contracted my services as a consulting arborist. My assignment is to
tag, assess and inventory the regulated trees at the above referenced site. The purpose of
this report is to establish the condition of the significant trees to satisfy City of Renton
permit submittal requirements.
I received a site plan from Barghausen Consulting Engineers dated 6/28/18. I visited the site
7/12/2018 and visually inspected the trees indicated on the survey, which are the subject of
this report.
SUMMARY
The following table summarizes the tree quantities and categories inventoried in this report.
Significant, Heritage, Landmark and Dangerous categories are defined by municipal code.
Significant Trees on Site 5
Heritage Trees on Site 0
Landmark Trees on Site 0
Dangerous Trees on Site 0
Total Subject Trees 5
One significant tree is proposed for retention, and 4 for removal.
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
ENGINEER'S PROJECT #
PRINTED FOR
DATE
SHEET
SHEET NUMBER
DRAWN BY
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
FSR#CHICK-FIL-A361 RAINIER AVE S. RENTON, WA 98057 04249
18963
SITE PLAN REVIEW
08-01-18
DVZGENERALIZED UTILITY PLAN2 OF 3
C2.0
GENERALIZED UTILITY PLAN
STORMWATER CONTROL PLAN
Chick-fil-A
Project Site No. 04249
361 Rainier Avenue South
Renton, Washington
Prepared for:
Chick-fil-A, Inc.
15635 Alton Parkway, Suite 350
Irvine, CA 92618
August 16, 2018
Our Job No. 18963
18215 72ND AVENUE SOUTH KENT, WA 98032 (425) 251-6222 (425) 251-8782 FAX
BRANCH OFFICES ¨ TUMWATER, WA ¨ KLAMATH FALLS, OR ¨ LONG BEACH, CA ¨ ROSEVILLE, CA ¨ SAN DIEGO, CA
www.barghausen.com
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
ENGINEER'S PROJECT #
PRINTED FOR
DATE
SHEET
SHEET NUMBER
DRAWN BY
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
FSR#CHICK-FIL-A361 RAINIER AVE S. RENTON, WA 98057 04249
18963
SITE PLAN REVIEW
08-01-18
DVZDRAINAGE CONTROL PLAN3 OF 3
C3.0
DRAINAGE CONTROL PLAN
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
ENGINEER'S PROJECT #
PRINTED FOR
DATE
SHEET
SHEET NUMBER
DRAWN BY
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
FSR#CHICK-FIL-A361 RAINIER AVE S. RENTON, WA 98057 04249
18963
SITE PLAN REVIEW
08-01-18
DVZCONCEPTUAL GRADING ELEVATIONS & PLAN1 OF 3
C1.0
CONCEPTUAL GRADING ELEVATIONS & PLAN
REPORT COVER PAGE
RED
Geotechnical Engineering Report
Proposed Chick-fil-A Restaurant #04249
Renton, King County, Washington
June 21, 2018
Terracon Project No. 81185084
Prepared for:
Chick-fil-A, Inc.
Irvine, California
Prepared by:
Terracon Consultants, Inc.
Mountlake Terrace, WA
1
Construction Mitigation Description
New Chick-fil-A Restaurant
361 Rainier Ave S
Renton WA 98055
8/22/18
Planning Division
City of Renton
1055 South Grady Way, Renton, WA 98057
Proposed Construction Start Date:
• Fourth Quarter, 2019
Hours of Operation:
• Per City Restrictions
“Commercial, multi-family, new single family and other non-residential construction activities shall be
restricted to the hours between 7:00 a.m. and 8:00 p.m., Monday through Friday. Work on Saturdays
shall be restricted to the hours between 9:00 a.m. and 8:00 p.m. No work shall be permitted on
Sundays”.
• Majority of the work will be performed Monday through Friday from 7am to 5pm.
Proposed Hauling/Transportation Routes:
• Access from Rainier Ave and Renton.
Measures to be implemented to minimize dust/traffic/erosion/mud/noise:
• Temporary fencing will be provided around the perimeter of the subject site
• Erosion control measures will be provided as required by the City.
• Construction noise will be limited to the allowed hours of construction established in the City code. No special
hours of operation are anticipated.
Carlos Arias
4G Development & Consulting, Inc.
Phone: 951-970-9138
Email: carias@4gdev.com
Address: PO BOX 270571, San Diego, CA 92198
BR-3
EC-1SC-1
T/ SLAB
0"
WATER TABLE
3'-0"
T.O. HIGH PLATE
21'-8"
T.O.PLATE
20'-4"
VARIES
H.P. 16'-0"
ROOF TOP EQUIPMENT
SCREENED BY PARAPET
WALL, TYP.
BR-3
EC-1SC-1
T/ SLAB
0"
WATER TABLE
3'-0"
T.O. HIGH PLATE
21'-8"
T.O.PLATE
20'-4"
VARIES
H.P. 16'-0"
ROOF TOP EQUIPMENT
SCREENED BY PARAPET
WALL, TYP.
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
A
FSR#CHICK-FIL-A1
B
C
D
E
A
B
C
D
E
234
1234
5
5
I:\Chick-fil-A\16-Jobs\16-144361RainierAve.South,Renton,WA\Graphics\20CustomDesign\20.2SchematicDesign\00304249A2.1.dwgSheetNo:ELEVATIONSSavedby:tony-Tuesday,August14,20186:09AMPrintedby:TonyMorales-August21,201811:48AM1833 E. 17th. Street; Suite 301Santa Ana, CA. 92705Phone 714.832.1834
BR-3
EC-1
SC-1
BR-3
EC-1
SC-1
T/ SLAB
0"
WATER TABLE
3'-0"
T.O. HIGH PLATE
21'-8"
T.O.PLATE
20'-4"
T/ SLAB
0"
WATER TABLE
3'-0"
T.O. HIGH PLATE
21'-8"
T.O.PLATE
20'-4"
H.P. PLYWOOD
16'-0"
ROOF TOP EQUIPMENT
SCREENED BY PARAPET
WALL, TYP.
ROOF TOP EQUIPMENT
SCREENED BY PARAPET
WALL, TYP.
Information contained on this drawing and in all
digital files produced for above named project
may not be reproduced in any manner without
express written or verbal consent from
authorized project representatives.
Chick-fil-A
5200 Buffington Road
Atlanta, Georgia
30349-2998
NO.DATE DESCRIPTION
REVISION SCHEDULE
A
FSR#CHICK-FIL-A1
B
C
D
E
A
B
C
D
E
234
1234
5
5
I:\Chick-fil-A\16-Jobs\16-144361RainierAve.South,Renton,WA\Graphics\20CustomDesign\20.2SchematicDesign\00304249A2.2.dwgSheetNo:ELEVATIONSSavedby:tony-Tuesday,August21,201811:50AMPrintedby:TonyMorales-August21,201811:51AM1833 E. 17th. Street; Suite 301Santa Ana, CA. 92705Phone 714.832.1834
(ΚΝΓ 0ΧΟΓ ∋ΝΓΞΧςΚΘΠΥ
∋#56 ∋.∋8#6+10 5176∗∋.∋8#6+10
%1.14 #0&/#6∋4+#..∋)∋0&
56%
∃4
∋%
0ΘςΓ#ΝΝ ΤΘΘΗ ςΘΡ ΟΓΕϑΧΠΚΕΧΝ ΓΣΩΚΡΟΓΠς ΥϑΧΝΝ ∆Γ ΝΘΕΧςΓΦ ΚΠ
ΓΣΩΚΡΟΓΠς ΨΓΝΝ ΧΠΦ ΥΕΤΓΓΠΓΦ ΗΤΘΟ ΞΚΓΨ ∆[ΡΧΤΧΡΓς ΨΧΝΝΥ
#
5ςΩΕΕΘ 561 2ΘΨΓΤΨΧΝΝ 9ϑΚςΓ
∃ΤΚΕΜ 8ΓΠΓΓΤ ∃ΘΤΧΝ ∃ΤΚΕΜ %ΘΝΘΤ %ΚςΧΦΓΝ
2ΧΤΧΡΓς 9ΧΝΝ %ΘΡΚΠΙ &ΩΤΘΝΧΥς ∋ΖΕΓΡςΚΘΠΧΝ /ΓςΧΝΥ &ΧΤΜ ∃ΤΘΠ∴Γ /ΧςςΓ
#ΝΩΟΚΠΩΟ #ΨΠΚΠΙ %ΘΝΘΤ &ΧΤΜ ∃ΤΘΠ∴Γ24∋.+/+0#4;∋.∋8#6+105
4ΓΠςΘΠ 9#
9∋56 ∋.∋8#6+10 0146∗∋.∋8#6+10
5ςΩΕΕΘ 56%
5ςΩΕΕΘ 56%
2ΧΤΧΡΓς 9ΧΝΝ %ΘΡΚΠΙ ∋%
2ΧΤΧΡΓς 9ΧΝΝ %ΘΡΚΠΙ ∋%
#ΝΩΟΚΠΩΟ #ΨΠΚΠΙ #
∃ΤΚΕΜ 8ΓΠΓΓΤ ∃4
∃ΤΚΕΜ 8ΓΠΓΓΤ ∃4
#ΝΩΟΚΠΩΟ #ΨΠΚΠΙ #
(ΚΝΓ 0ΧΟΓ ∋ΝΓΞΧςΚΘΠΥ
5176∗9∋56 4∋0&∋4+0)
24∋.+/+0#4;4∋0&∋4+0)5
4ΓΠςΘΠ 9#
(ΚΝΓ 0ΧΟΓ ∋ΝΓΞΧςΚΘΠΥ
5176∗∋#56 4∋0&∋4+0)
24∋.+/+0#4;4∋0&∋4+0)5
4ΓΠςΘΠ 9#
(ΚΝΓ 0ΧΟΓ ∋ΝΓΞΧςΚΘΠΥ
0146∗9∋56 4∋0&∋4+0)
24∋.+/+0#4;4∋0&∋4+0)5
4ΓΠςΘΠ 9#
(ΚΝΓ 0ΧΟΓ ∋ΝΓΞΧςΚΘΠΥ
0146∗∋#56 4∋0&∋4+0)
24∋.+/+0#4;4∋0&∋4+0)5
4ΓΠςΘΠ 9#
State of Washington • Department of Archaeology & Historic Preservation
P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065
www.dahp.wa.gov
October 3, 2018
Mr. Matthew Herrera
Senior Planner
City of Renton
1055 South Grady Way
Renton, WA 98057
In future correspondence please refer to:
Project Tracking Code: 2018-09-07339
Property: City of Renton Chick -fil-A Construction on Rainier Ave
Re: Archaeology - Monitoring Requested
Dear Mr. Herrera:
Thank you for contacting the Washington State Historic Preservation Officer (SHPO) and Department of
Archaeology and Historic Preservation (DAHP) and providing documentation regarding the above
referenced project. As a result of our review, our professional opinion is that the project area at 361
Rainier Ave S has the potential to contain archaeological resources. Further, the scale of the proposed
ground disturbing actions would destroy any archaeological resources present. Therefore, we
recommend a professional archaeologist monitor all ground disturbing activities that occur within the
project area. We also recommend consultation with the concerned Tribes' cultural committees and staff
regarding cultural resource issues.
Although this property is currently land locked, early GLO maps of the south Lake Washington area show
that the project area is located near the eastern bank of the Black River. The river was subsequently
filled, but intact archaeological sites have been located to both the north and south of the project area
beneath shallow fill, and some of these sites have been found to contain Native American human
remains.
Due to the high probability of this project encountering archaeological remains the DAHP recommends
that a professional archaeologist monitor all ground disturbing activities within the project area including,
but not limited to, geotechnical testing, concrete removal, utility removal and replacement, and building
excavation. Prior to monitoring a robust Inadvertent Discoveries Plan (IDP) should be written and this
plan should be adhered to during all ground disturbing activities. Concerned Tribes’ should also be
provided the opportunity to have a tribal monitor on site.
Identification during construction is not a recommended detection method because inadvertent
discoveries can result in costly construction dela ys and damage to the resource. However, the majority of
the project area is hardscaped and thus is not available for archaeological survey prior to ground
disturbing work.
These comments are based on the information available at the time of this review and on behalf of the
SHPO in conformance with state law. Should additional information become available, our assessment
may be revised.
We appreciate receiving any correspondence or comments from concerned tribes or other parties
concerning cultural resource issues that you receive.
State of Washington • Department of Archaeology & Historic Preservation
P.O. Box 48343 • Olympia, Washington 98504-8343 • (360) 586-3065
www.dahp.wa.gov
Thank you for the opportunity to comment on this project and we look forward to receiving the monitoring
report. Please ensure that the DAHP Project Number (a.k.a. Project Tracking Code) is shared with any
hired cultural resource consultants and is attached to any communications or submitted reports. Should
you have any questions, please feel free to contact me.
Sincerely,
Stephanie Jolivette
Local Governments Archaeologist
(360) 586-3088
Stephanie.Jolivette@dahp.wa.gov
Chick-fil-A
Renton, WA
PRE17-000838
Revised Transportation Impact Analysis
February 1, 2019
Prepared for:
Chick-fil-A Inc.
15635 Alton Parkway, Suite 350
Irvine, CA 92618
Prepared by:
TENW
Transportation Engineering NorthWest
11400 SE 8th Street, Suite 200
Bellevue, WA 98004
Office: (425) 889-6747
Fax: (425) 889-8369
From: Curt Kruse <curt.kruse@comcast.net>
Sent: Saturday, September 22, 2018 11:41 AM
To: Matthew Herrera; Sandi Kruse; curt.kruse@comcast.net
Subject: Proposed Chick-fil-A traffic issues
Mr. Herrera,
This letter is a follow-up to our telephone conversation of September 21, 2018.
We want to express our concern regarding the potential traffic effects of the proposed
Chick-fil-A restaurant at 361 Rainier Ave S. in Renton, WA. The proposed building is
immediately south of and next to our property at 351 Rainier Ave S. (Our property is
leased to the Firestone/Bridgestone Corporation as a tire/auto repair business.)
Chick-fil-A restaurants attract large volumes of automobile traffic, which tends to line-up
and back-up on the street and block traffic. The Chick-fil-A restaurant at NE 8th and
116th street in Bellevue, WA is an example of this. Automobiles are often lined-up to
enter the restaurant parking lot/drive-through well beyond the driveway entrance and
block all other traffic in the right/southbound lane.
If this line-up/back-up were to occur on southbound lane/lanes of Rainier Ave S.
adjacent to our property it would restrict the entrance to our property and damage our
tenant's business. This could result in financial loss for us and our long-term tenant.
Please consider this and keep us informed as you work through the permitting process.
Sincerely,
Curt and Alexandra Kruse
3801 92nd Ave NE
Bellevue, WA 98004
425-922-0828 (cell)
425-454-2552 (home)
From: Matthew Herrera
Sent: Monday, September 24, 2018 12:13 PM
To: 'Curt Kruse'; Sandi Kruse
Subject: RE: Proposed Chick-fil-A traffic issues
Thank you Mr. Kruse for your comments. I will add this email to the project file and add you to the
project’s party of record list. The applicant’s site plan (linked below) proposes a vehicle stacking lane
that would accommodate 15 cars with additional capacity within the parking lot aisle lanes. The
applicant’s Transportation Impact Analysis (also linked below) proposes to utilize a Police Officer to
ensure vehicles do not back up into Rainier Ave S and restaurant staff to assist drivers leaving the
restaurant. The City Environmental Review Committee will review these proposals for adequacy prior to
issuing an environmental determination.
Again thank you for your email and the City will consider your comments prior to issuing a land use
decision. Please feel free to contact me should you have any additional questions and/or concerns. –
Matt
Site Plan
https://edocs.rentonwa.gov/Documents/1/edoc/1239751/P_Site_Plan_Color_2018.pdf
Transportation Impact Analysis
https://edocs.rentonwa.gov/Documents/1/edoc/1239759/RS_Transportation_Impact_Analysis_2018.pd
f
Matt Herrera, AICP - Senior Planner
City of Renton
Community & Economic Development
1055 S. Grady Way
Renton, WA 98057-3232
425.430.6593
From: Curt Kruse [mailto:curt.kruse@comcast.net]
Sent: Saturday, September 22, 2018 11:41 AM
To: Matthew Herrera <MHerrera@Rentonwa.gov>; Sandi Kruse <alexandra.kruse@va.gov>;
curt.kruse@comcast.net
Subject: Proposed Chick-fil-A traffic issues
Mr. Herrera,
This letter is a follow-up to our telephone conversation of September 21, 2018.
We want to express our concern regarding the potential traffic effects of the proposed
Chick-fil-A restaurant at 361 Rainier Ave S. in Renton, WA. The proposed building is
immediately south of and next to our property at 351 Rainier Ave S. (Our property is
leased to the Firestone/Bridgestone Corporation as a tire/auto repair business.)
Chick-fil-A restaurants attract large volumes of automobile traffic, which tends to line-up
and back-up on the street and block traffic. The Chick-fil-A restaurant at NE 8th and
116th street in Bellevue, WA is an example of this. Automobiles are often lined-up to
enter the restaurant parking lot/drive-through well beyond the driveway entrance and
block all other traffic in the right/southbound lane.
If this line-up/back-up were to occur on southbound lane/lanes of Rainier Ave S.
adjacent to our property it would restrict the entrance to our property and damage our
tenant's business. This could result in financial loss for us and our long-term tenant.
Please consider this and keep us informed as you work through the permitting process.
Sincerely,
Curt and Alexandra Kruse
3801 92nd Ave NE
Bellevue, WA 98004
425-922-0828 (cell)
425-454-2552 (home)
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: September 28, 2018
TO: Matt Herrera, Senior Planner
FROM: Brianne Bannwarth, Development Engineering Manager
SUBJECT: Traffic Concurrency Test – Chick-fil-A;
LUA18-000619, ECF, CU-H
The applicant is requesting Administrative Site Plan Review, Environmental Threshold
Determination (SEPA), and one modification to the development regulations to construct a new
4,195 square foot fast food restaurant with two (2) vehicle drive through lane s and 42 surface
parking spaces located at 361 Rainier Ave S. The existing building (formerly Diamond Lil’s Casino)
would be removed. The subject property is comprised of three (3) lots totaling 0.96 acres and is
located in the Commercial Mixed Use Comprehensive Plan land use designation and Commercial
Arterial (CA) zoning classification. Vehicle access to the subject property would be provided on
Rainier Ave S and within an existing easement with the abutting Renton Center Shopping Center.
The applicant has requested a modification to the parking requirements to exceed the maximum
number of allowed parking spaces.
The proposed development would generate approximately 988 net new average weekday daily
trips. During the weekday AM peak hour, the project would generate approximately 86 net new
trips (44 inbound and 42 outbound). During the weekday PM peak hour, the project would
generate approximately 68 net new trips (35 inbound and 33 outbound). The proposed project
passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows:
Transportation Concurrency Test – Chick-fil-A
Page 2 of 3
September 28, 2018
Traffic Concurrency Test Criteria Pass
Implementation of citywide Transportation Plan Yes
Within allowed growth levels Yes
Project subject to transportation mitigation or impact fees Yes
Site specific street improvements to be completed by project No
Traffic Concurrency Test Passes
Evaluation of Test Criteria
Implementation of citywide Transportation Plan: The City’s investment in completion of the
forecast traffic improvements is 130% of the scheduled expenditure through 2017.
Within allowed growth levels: As shown on the attached citywide traffic concurrency summary,
the calculated citywide trip capacity for concurrency with the city adopted model for 201 8 is
1,880 trips, which provides sufficient capacity to accommodate a reduction of 68 trips from this
project. A resulting 1,812 trips are remaining.
Project subject to transportation mitigation or impact fees: The project will be subject to
transportation impact fees at time of building permit for the project.
Site specific street improvements to be completed by project: The project will be required to
complete all internal and frontage street improvements for the building prior to occupancy. Any
additional off-site improvements identified through SEPA or land use approval will also be
completed prior to final occupancy.
Background Information on Traffic Concurrency Test for Renton
The City of Renton Traffic Concurrency requirements for proposed development projects are
covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement
is covered in RMC 4-6-070.D, which is listed for reference:
D. CONCURRENCY REVIEW PROCESS:
1. Test Required: A concurrency test shall be conducted by the Department for each
nonexempt development activity. The concurrency test shall determine consistency with
the adopted Citywide Level of Service Index and Concurrency Management System
established in the Transportation Element of the Renton Comprehensive Plan, according
to rules and procedures established by the Department. The Department shall issue an
initial concurrency test result describing the outcome of the concurrency test.
Transportation Concurrency Test – Chick-fil-A
Page 3 of 3
September 28, 2018
2. Written Finding Required: Prior to approval of any nonexempt development activity
permit application, a written finding of concurrency shall be made by the City as part of
the development permit approval. The finding of concurrency shall be made by the
decision maker with the authority to approve the accompanying development permits
required for a development activity. A written finding of concurrency shall apply only to
the specific land uses, densities, intensities, and development project described in the
application and development permit.
3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project
fails the concurrency test, the project application shall be denied by the decision maker
with the authority to approve the accompanying development activity permit application.
The Concurrency Management System established in the Transport ation Element on page XI-65
of the Comprehensive Plan states the following:
Based upon the test of the citywide Transportation Plan, consideration of growth levels
included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation
Fee, and an application of site specific mitigation, development will have met City of
Renton concurrency requirements.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 3 LUA**-000***
ADVISORY NOTES TO APPLICANT
The following notes are supplemental information provided in conjunction with the administrative land use
action. Because these notes are provided as information only, they are not subject to the appeal process for
the land use action.
Planning:
(Contact: Name, 425-430-6593, mherrera@rentonwa.gov)
1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless
otherwise approved by the Development Services Division.
2. Commercial construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and
eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours
between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an
appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where
no further construction work will occur within ninety (90) days. Alternative measures such as mulch,
sodding, or plastic covering as specified in the current King County Surface Water Management Design
Manual as adopted by the City of Renton may be proposed between the dates of November 1st and
March 31st of each year. The Development Services Division’s approval of this work is required prior to
final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is
being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or
fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the
area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around
the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be
placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on
each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups
of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the
applicant shall provide supervision whenever equipment or trucks are moving near trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible
for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and
/or your U.S. Fish and Wildlife Service permit.
Development Engineering:
(Contact: Justin Johnson, 425-430-7291, jtjohnson@rentonwa.gov)
1. See Attached Development Engineering Memo dated September 30, 2018
Fire Authority:
(Contact: Corey Thomas, 425-430-7024, cthomas@rentonwa.gov)
1. Fire impact fees are applicable at the rate of $2.67 per square foot of commercial space. This fee is
paid at time of building permit issuance. Credit is granted for the building removed and results in no
new fee added.
ADVISORY NOTES TO APPLICANT
Page 2 of 3 LUA18-000619
2. The preliminary fire flow calculation is 2,000 gpm. A minimum of two hydrants are required. One
within 150-feet and one within 300-feet of the proposed building. Existing fire hydrants appear
adequate to meet these requirements.
3. An approved fire sprinkler system is required throughout the building as it exceeds 100 occupant load.
An approved fully automatic fire alarm system is required throughout the building per local ordinance.
Separate plans and permits required by the fire department. Direct access is required into the fire
sprinkler equipment room from the outside of the building. Separate plan and permits for the kitchen
hood fire suppression systems. Carbon dioxide systems for beverage dispensing shall meet Section
5307 of the fire code if the system exceeds 100 pounds.
4. Existing fire department apparatus access roadways are adequate.
5. An annual place of assembly permit is required at the conclusion of the project for buildings with an
occupant load exceeding 50.
Technical Services:
(Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov)
1. During Construction Phase, please confirm the existing easement locations in relation to the proposed
structures. If necessary, releasing or extinguishing easements may be necessary. Unable to determine
based on information provided.
Police:
(Contact: Sandra Havlik, 425-430-7520, shavlik@rentonwa.gov)
1. Estimated CFS Annually: 3 (does not include traffic impact)
2. Safety Concerns: The Renton Police Department has reviewed the revised Traffic and Parking
Management Plan proposed by Chick-fil-A. The Police Department have considered the revised
proposal from Chick-fil-A and acknowledge that they will defer to the Traffic Commander for expertise
regarding traffic flow and safety measures for our community. As noted in their plan, as well as our
suggestions, regular meetings will be scheduled to allow for open communication between
management and the Police Department. These discussions will be held as needed to discuss any
proposed changes to the traffic plan or extra officer staffing that may be required for the success of
Chick-fil-A’s operation. Open discussions will also ensure that the safety of the public and
consideration of impact to existing and surrounding businesses are a priority.
a. Duration and strategy of traffic management plan will be at the discretion of the Traffic
Commander.
i. It is unknown at this time the true impact an opening of this type of restaurant will have
on our city, surrounding business, and traffic on Rainier Ave S. Traffic Division will
communicate with appropriated Chick-fil-A staff at reasonable intervals to evaluate the
effectiveness of mitigation measures ensuring the efficient movement of traffic as well
as efficient movement of customers from the roadway, onto private property, then
exiting back out on to city streets.
ii. Off-duty officers will be utilized to manage the appropriate mitigation measures. The
purpose of off-duty police officers is to safely move the large volume of vehicles from
the street, through the purchasing process, then back onto the street and away from
the area with the least amount of disruption to the already congested area, the local
businesses and of course the customers themselves. Off-duty staffing decisions will be
based on that primary purpose.
iii. The Traffic Commander will assess on a regular basis and at any time traffic volumes are
deemed a hazard or impact traffic on Rainier Ave S in regards to safety, revisions to
Chick-Fil-A’s plan above will be made on an “as needed” basis. This could include, at
minimum, restricting access via Rainier Ave S.
ADVISORY NOTES TO APPLICANT
Page 3 of 3 LUA18-000619
iv. The required mitigation is fluid and unknown. A staffing review for modifications should
be done every 30 days (or as needed) between the Renton Police Department and
Chick-fil-A.
b. An overflow area for drive-through traffic will need to be designated and is recommended a site
abutting the Chick-fil-A property is utilized.
i. The applicant has proposed 15-stalls for overflow customers and staff across Rainier Ave
S. in the McLendon parking lot. This will add additional safety concerns as this will
increase pedestrian flow across an already busy thoroughfare (Rainier Ave S). Be advised
that an additional officer may need to be placed at this location and will be determined
by the Traffic Commander.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:September 30, 2018
TO:Matt Herrera, Planner
FROM:Justin Johnson, Civil Plan Reviewer
SUBJECT:Chick-fil-A Building
PRE 18-000619
I have reviewed the application for the Chick-fil-A Building at 361 Rainier Ave S APN(‘s) 0007200149,
0007200215 and 0007200151) and have the following comments:
EXISTING CONDITIONS
The site is approximately 0.96 acres in size and is rectangular in shape. The existing site consists of an
existing casino and paved parking lot. There is also a large gravel parking lot located in the center of the
site.
Water Water service is provided by City of Renton The site is in the Valley service area in the 196
hydraulic pressure zone. There is an existing 12-inch City water main located in Rainier Ave S
(see Water plan no. W-3430) that can deliver a maximum total flow capacity of 4500 gallons
per minute (gpm). There is also an existing 8-inch water main located in Renton Center Way
SW (see Water plan no. W-2165) that can deliver a maximum capacity of 2,000 gallons per
minute. The approximate static water pressure is 70 psi at the elevation of 26 feet. The site is
located within Zone 2 of an Aquifer Protection Area. There is an existing domestic water service
that serves each parcel, there is 1-inch domestic water meter serviced from a 1” lateral serving
parcel 0007200149, a 1-1/2” lateral serving parcel 0007200215, and a 2” lateral serving parcel
0007200215.
Sewer Wastewater service is provided by the City of Renton There is an existing 8-inch PVC
wastewater main located on the west of the property where it flows southwest paralleling
Renton Center Way SW (see City plan no. S-2293).
Storm There is an existing storm drainage system in Rainier Ave S (see City plan no. R-3430). There is
also an existing on-site conveyance system. The site falls within the City’s Flow Control Standard
(Exist Peak). The site falls within the Black River drainage basin.
Chick-fil-A – LUA18-000619
Page 2 of 6
September 30, 2018
Streets Rainier Ave S is a Principal Arterial Street with an existing right of way (ROW) width of
approximately 125 as measured using the King County Assessor’s Map. Current street frontage
improvements include curb and gutter, five foot planter strip and an eight foot sidewalk on both
sides of the street.
WATER COMMENTS
1. The development is subject to a water system development charge (SDC) fee. Proposed water
meter sizes have not been noted on the preliminary utility plans. Typical water meter sizes and
associated fees are noted as follows:
a. The SDC fee for water is based on the size of the new domestic water to serve the
project. The current water fee for a single 1-inch meter is $3,727.00 per meter, 1-1/2
inch meter is $18,635.00 and a 2-inch meter is $29,816.00.
b. A water system redevelopment credit will apply for the existing domestic water meters
if they are abandoned within 5 years before the date of application for the new water
meters.
c. SDC fees are assessed and payable at construction permit issuance.
2. There are 2 existing 1-inch water service lines to the property that end inside 2 water meter
boxes, without the meters, located behind the sidewalk along Rainier Ave S. These service lines
can be used for the new building if new 1-inch meters can be used. Based on the preliminary
generalized utility plan (Sheet C.2) submitted with the land use application, the new 1.5-inch
water service line and water meter along with the fire sprinkler stub to the new building will be
connected to the existing 8-inch water line in Renton Center Way SW. The meter and backflow
prevention assembly vault for the fire sprinkler system must be relocated to be within a planter
strip and not under a parking stall as shown. The building fire department connection for the
fire sprinkler system must be within 50 feet of a fire hydrant.
3. There are also 2 existing water meters north of Renton Center Way that will be within
the new driveway and these meters must also be relocated to be within a planter strip. The
water service lines from the back of the 2 meters to the existing building at 364 Renton Center
Way will also need to be relocated due to conflict with the proposed utilities.
4. Installation of a fire sprinkler stub a with a detector double check valve assembly (DDCVA) for
backflow prevention is required to each building. The fire sprinkler stub and related piping shall
be done by a registered fire sprinkler designer/contractor. The DDCVA shall be installed on the
private property in an outside underground vault per City standard plan no. 360.2. The DDCVA
may be installed inside the building if it meets the conditions as shown on City’s standard plan
360.5 for the installation of a DDCVA inside a building. The location of the DDCVA inside the
building must be pre-approved by the City Plan Reviewer and Water Utility.
5. The fire department connection (FDC) shall be within 50’ of a fire hydrant or in a location
approved by the Renton Regional Fire Authority. A post indicator valve (PIV) per City standards
is required on the fire line. The fire sprinkler stub and appurtenance shall be sized by a
registered fire sprinkler designer / contractor.
6. Installation of a domestic water meter is required for each building. The sizing of the meter(s)
shall be in accordance with the most recent edition of the Uniform Plumbing Code. Domestic
water meter with size 3-inch or larger shall be installed in an exterior vault per standard plan no.
Chick-fil-A – LUA18-000619
Page 3 of 6
September 30, 2018
320.4. The meter vault shall be located within public right-of-way or within an easement on
private property.
7. Installation of a with a backflow prevention assembly is required on private property behind the
domestic water meter. A reduced-pressure principle backflow prevention assembly (RPBA) is
required for water meters for retail, commercial use. The RPBA shall be installed inside an
above-ground heated enclosure per City standard plan no. 350.2. The RPBA may be located
inside the building if a drainage outlet for the relief valve is provided and the location is pre-
approved by the City Plan Reviewer and City Water Utility Department.
8. Installation of a landscape irrigation meter and double check valve assembly (DCVA) is required,
if applicable.
9. The development is subject to applicable water system development charges (SDC’s) and meter
installation fees based on the number and size of the meters for domestic uses and for fire
sprinkler use. The development is also subject to fees for water connections, cut and caps, and
purity tests. Current fees can be found on the City’s website. Fees that are current will be
charged at the time of construction permit issuance.
10. The development is subject to water system redevelopment fees based on the size of the
existing meters and if the existing meters are abandoned.
SEWER COMMENTS
1. The development is subject to a wastewater system development charge (SDC) fee. Typical fees
are noted as follows:
a. The SDC fee for wastewater is based on the size of the new domestic water to serve the
project. The current sewer fee for a single 1-inch meter is $2,837.00 per side sewer, 1-
1/2 inch meter is $14,185.00 and a 2-inch meter is $22,696.00.
b. A wastewater system redevelopment credit will apply for the existing side sewer when it
is abandoned.
c. SDC fees are assessed and payable at construction permit issuance.
2. The new building side sewer shall be a minimum of 6” and flow by gravity at a minimum of 2%
to the main.
3. The developer will be required to provide a utility easement over the existing sewer main.
4. Grease Interceptor is required for the restaurant and is shown on the Utility Plan submitted with
the project application. The grease interceptor shall be sized based on drainage fixture units in
accordance with standards found in the latest edition of the Uniform Plumbing Code (UPC). The
grease interceptor shall drain by gravity to the sewer main. The grease interceptor shall be
located on site so that is accessible for routine maintenance.
STORM DRAINAGE COMMENTS
1. The development is subject to a system development charge (SDC) for stormwater. The 2018
SDC for stormwater is $0.687 per square foot of new impervious surface area, but not less than
$1,718.00. The fee that is current will be charged at the time of construction permit issuance.
Chick-fil-A – LUA18-000619
Page 4 of 6
September 30, 2018
2. A preliminary Drainage Plan and Technical Information Report (TIR), dated August 16, 2018, was
submitted by Barghausen Engineering with the Land Use Application. Based on the City of
Renton’s flow control map, the site falls under Flow Control Duration Standards (Existing Peak
Conditions) and is located within the Black River drainage basin. The development is subject to a
Full Drainage Review in accordance with the 2017 Renton Surface Water Design Manual
(RSWDM). All nine core requirements and the six special requirements have been discussed in
the Technical Information Report. The detention, water quality and conveyance shall be
designed in accordance with the RSWDM that is current at the time of the civil construction
permit application. The applicant has proposed to connect to the City of Renton’s storm
drainage system located within Rainier Ave.
a. The development currently is showing that there is less than 0.15 CFS increase due to
the proposed development and they are exempt from flow control. During the review of
the final TIR the applicant will need to ensure that flow control standards are being met
as outlined in the 2017 RSWDM.
b. The applicant is proposing to use a modular wetland in order for the project to meet the
water quality requirements. The modular wetland is proposed within the parking lot in
the center of the lot prior to connecting into the City of Renton system located within
Rainier Ave S.
c. On-site BMPs satisfying Core Requirement #9 will be required for the site. On-site BMPs
shall be evaluated in order of preference by feasibility as described in Section C.1.3 of
the 2017 RSWDM. All targeted impervious area to the maximum extent feasible shall be
conveyed to an On-site BMP. Applicant proposes to use bio retention facilities with
underdrains in the planter strips along the onsite roadway.
d.The following stormwater improvements are required and shall be discussed or revised
within the TIR:
i. All Core Requirements and Special Requirements must be evaluated within
the TIR.
ii. Feasibility of On-site BMPs must be based on the feasibility criteria
established for the specific On-site BMPs noted in Appendix C of the 2017
RSWDM. A feasibility analysis of the On-site BMPs must be provided with the
TIR.
1. The TIR notes that On-site BMPs shall be applied to 10% of the site
with 65% impervious coverage. This statement only applies when
infiltration and basic dispersion have been deemed infeasible or have
been applied to the site to the maximum extent feasible and Reduced
Impervious Surface Credit, Native Growth Retention Credit, and the
Tree retention credit are being applied to the site.
2. Treatment Liners may be required for infiltration facilities within
Aquifer Protection Zone 2 per RSWDM Section 1.3.6 (Special
Requirement #6).
3. Bio-retention facilities with underdrains do not satisfy the
requirements of Core Requirement #9 per RSWDM Section C.2.6.1
Note 5 and may not be used as On-site BMP Sizing Credit for Core
Chick-fil-A – LUA18-000619
Page 5 of 6
September 30, 2018
Requirement #3 Flow Control facility sizing or exemption per RSWDM
Section 1.2.9.4.
4. The On-site BMPs if sized per the LID Performance Standards must
meet 8% of the 2-year peak flow up to the 50-year peak flow. The bio-
retention sized in the TIR has been sized to meet 50% of the 2-year
peak flow up to the 50-year peak flow. Revise the TIR accordingly if
LID Performance Standards are being used.
3. A Geotechnical Report, dated June 21
th, 2018, completed by Terracon for the site has been
provided. The submitted report describes multiple layers of soil characteristics. Approximately
the first 1 to 2 feet contain imported fill. Below the surface there is approximately 10 to 12 feet
of very loose silt and sand combination with a high water table that increase the susceptibility to
static settlements and liquefactions in the event of an earthquake.
a. The Geotechnical report recommends that all drainage facilities, including splash
blocks, be located a minimum of 10 feet away from the building.
b. Infiltration testing may be required in order to determine feasibility of the On-site
BMPs required in order to meet Core Requirement #9 of the RSWDM.
c. The TIR states that full infiltration is not recommended on site due to high
groundwater elevation during the winter months. However, Groundwater was
detected between 8’ and 12’ in borings collected on May 31st, 2018 per Geotechnical
Report. Provide documentation from geotechnical engineer supporting the
infeasibility of full infiltration for this reason.
TRANSPORTATION/STREET COMMENTS
1. The 2018 transportation impact fee is $90.36 per square foot. A credit for the previous square
footage will be issued for the existing building. Transportation Impact Fees for additional uses
can be found on the City’s website. Transportation impact fees are due at the time of building
permit issuance.
2. The proposed development fronts Rainier Ave S along the east property line(s). Rainier Ave S is
classified as a Principal Arterial Road. Existing right-of-way (ROW) width is approximately 125 feet
subject to final survey. To meet the City’s complete street standards for Principal Arterial streets,
minimum ROW is 125 feet. No dedication will be required for this project. The frontage
improvements have been constructed by the City’s Rainer Ave S corridor project and will not
require the development to construct frontage improvements along Rainer Ave S.
3. Renton Center Way /South 3
rd Place (private access) is located on the south side of the proposed
project. The project should obtain the access easement from the owners of Renton Center Way
if the access easement is not already obtained. A copy of the recorded access easement should
be provided with the land use application.
4.A traffic analysis dated August 13, 2018, was provided by TENW. The site generated traffic
volumes were calculated using data from the Institute of Transportation Engineers (ITE) Trip
Generation Manual, 10th Edition, (2017). Based on the calculations provided, the proposed
development would average 988 new daily vehicle trips, accounting for pass-by trips. As
discussed in the analysis presented in the report, the site would generate 68 new PM peak hour
trips, accounting for pass-by and shared trips. As detailed in the report the proposed project is
Chick-fil-A – LUA18-000619
Page 6 of 6
September 30, 2018
not expected to lower the levels of service of the surrounding intersections included in the traffic
study. Increased traffic created by the development will be mitigated by payment of
transportation impact fees.
a. Applicant will need to ensure that there will not be a backup onto Rainier Ave S at any
time.
5. Paving and trench restoration within the City of Renton right of way shall comply with the City’s
Street Restoration and Overlay requirements.
GENERAL COMMENTS
1. Retaining walls that are 4’ or taller from bottom of footing and stormwater detention vaults will
require a separate building permit. Structural calculations and plans prepared by a licensed
engineer will be required as part of the building permit review.
2. All civil plans shall conform to the current City of Renton survey and drafting standards. Current
drafting standards can be found on the City of Renton website.
3. A separate plan submittal will be required for a construction permit for utility work and street
improvements. All plans shall be prepared by a licensed Civil Engineer in the State of Washington.
4. Please see the City of Renton website for the Construction Permit Application and Construction
Permit Process and Submittal Requirements. Please contact the City to schedule a construction
permit intake meeting.
5. Beginning April 3, 2017, the City will transition to electronic plan review. See
http://rentonwa.gov/paperless for more details and updates.