HomeMy WebLinkAboutMFP19000013.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000013
IVR Number: 19000013
Permit Informaon
Permit Name:SEATTLE CITY LIGHT - BLANKET PERMIT
Address/Locaon :01/02/2019Application Date:Parcel Number:Various locations in Renton
Permit Type:01/02/2019Issue Date:Franchise
Permit Work Class:01/02/2020Expiration Date:Minor Utility
Job Number:Blanket PermitFranchise Type:Electric
Description:2019 BLANKET PERMIT FOR SEATTLE CITY LIGHT EMERGENCY MAINTENANCE WORK. Work Under this Permit
must be Called in at Job Start (425) 430 7203.
Contacts
Name Address PhoneTypeBilling
Senait Telahun
SEATTLE CITY LIGHT
700 5th Ave, Suite 3200, PO 34023
SEATTLE, WA 98124
B: (206) 615-0629ApplicantX
CARMEN RODRIGUEZ-ORTON
SEATTLE CITY LIGHT
700 5th Ave, Suite 3200, PO 34023
Seattle, WA 98124
Contact
Mark Nagasawa
SEATTLE CITY LIGHT
700 5th Ave, Suite 3200 Po Box
34023 (ms-S/7)
Seattle, WA 98124
B: (206) 615-0667Contact
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES