Loading...
HomeMy WebLinkAboutP_Arch_Elevations_v1.pdf1st Flr0' -0"1st Flr0' -0"2A4.02top LOW21' -0"top HIGH26' -0"ADEFGB.62A4.011A4.02btm DECK22' -11"BCto PURLINS17' -0"MP-3MP-4MP-3MP-3MP-2EIFS-1CMU-1EIFS-1EIFS-2CMU-1MP-2MP-3AluminumComposit Panels07 46 00.A2Pre-FinishedParapet Flashing07 62 00.A6Pre-FinishedParapet Flashing07 62 00.A68" x 8" x 16" SplitFace CMU04 22 00.F16EIFS On 1"Insulation Board07 24 00.A2Coiling Door WithChain08 33 00.A1Hollow Metal Doorsand Frames08 11 13P-5P-5Storefronts08 43 00Storefronts08 43 00Storefronts08 43 00Storefronts08 43 008" x 8" x 16" SplitFace CMU04 22 00.F16EIFS On 1"Insulation Board07 24 00.A2AluminumComposit Panels07 46 00.A2AluminumComposit Panels07 46 00.A2MP-2AluminumComposit Panels07 46 00.A2EIFS On 1"Insulation Board07 24 00.A2AluminumComposit Panels07 46 00.A2Pre-FinishedParapet Flashing07 62 00.A6Storefronts08 43 00MP-3MP-4P-5Pre-FinishedParapet Flashing07 62 00.A61st Flr0' -0"1st Flr0' -0"1A4.01top LOW21' -0"2nd Flr12' -0"top HIGH26' -0"12672.33.25.76.46.1453btm DECK22' -11"3' - 6"EIFS-2CMU-1EIFS-1MP-2EIFS On 1"Insulation Board07 24 00.A2AluminumComposit Panels07 46 00.A28" x 8" x 16" SplitFace CMU04 22 00.F16Pre-FinishedParapet Flashing07 62 00.A6EIFS On 1"Insulation Board07 24 00.A2Storefronts08 43 00Storefronts08 43 00Storefronts08 43 00Storefronts08 43 008" x 8" x 16" SplitFace CMU04 22 00.F16Coiling Door WithMotor08 33 00.C1Rectangular RainLeader 4"x3"07 62 00.F1CMU-1MP-2MP-3MP-3MP-3MP-3P-5P-5SIGN-WALKER RENTON10' - 0"11' - 0"SIGN-MAZDA LOGOAluminumComposit Panels07 46 00.A2AluminumComposit Panels07 46 00.A2EIFS-1EIFS On 1"Insulation Board07 24 00.A24" x 5" BeveledGutter07 71 23.E2SIGN-SERVICEPre-Finished SSMetal Roofing07 46 00.A1Project Title601 St. Helens AveTacoma, Washington 98402Phone: (253) 922-4168ARCHITECTSPLLCSheet TitleProject Number:Date:Drawn:Checked:File:Scale:REVISIONS:NOTE: THESE DRAWINGS ARE PRODUCED EXCLUSIVELY FOR USE BY HHJ CONSTRUCTION INC. AND FOR PERMIT APPLICATION ONLY. ADDITIONAL DETAILING AND ENGINEERING SHALL BE REQUIRED BY ANY OTHER CONTRACTOR TO COMPLETE THE DRAWINGS TO "FOR CONSTRUCTION" PURPOSES.PLOT:1/8" = 1'-0"\\hhj-foundation\users\tanya\MyDocuments\Walker-Renton_Tanya613.rvt11/15/2018 4:17:53 PM03/26/18.AuthorCheckerA3.01Walker's RentonMazda - ValleyRoad DealershipEXTERIORELEVATIONSPROGRESS - 111518PROGRESS - 1115181/8" = 1'-0"2SOUTH ELEVATION1/8" = 1'-0"1WEST ELEVATION# Date Description T ectonic Cop yright 20071st Flr0' -0"1st Flr0' -0"2A4.02top LOW21' -0"2nd Flr12' -0"top HIGH26' -0"ADEFGB.62A4.011A4.02btm DECK22' -11"BCto PURLINS17' -0"Pre-FinishedParapet Flashing07 62 00.A68" x 8" x 16" SplitFace CMU04 22 00.F16Coiling Door WithChain08 33 00.A1Hollow Metal Doorsand Frames08 11 13CMU-1CMU-1EIFS-2EIFS On 1"Insulation Board07 24 00.A2Coiling Door WithChain08 33 00.A1Scupper andDownspout 4"x3"07 62 00.D1Pre-FinishedParapet Flashing07 62 00.A6AluminumComposit Panels07 46 00.A2Storefronts08 43 00Storefronts08 43 00Storefronts08 43 00Storefronts08 43 00Aluminum Windows08 51 13Pre-FinishedParapet Flashing07 62 00.A68" x 8" x 16" SplitFace CMU04 22 00.F163' - 6"1st Flr0' -0"1st Flr0' -0"1A4.01top LOW21' -0"2nd Flr12' -0"top HIGH26' -0"12672.33.25.76.46.1453btm DECK22' -11"to PURLINS17' -0"CMU-1EIFS-2CMU-1EIFS-2CMU-1EIFS-2P-5MP-3Pre-FinishedParapet Flashing07 62 00.A6EIFS On 1"Insulation Board07 24 00.A2SIGN-MAZDA LOGOStorefronts08 43 00Storefronts08 43 00Storefronts08 43 00Rectangular RainLeader 4"x3"07 62 00.F1Hollow Metal Doorsand Frames08 11 138" x 8" x 16" SplitFace CMU04 22 00.F164" x 5" BeveledGutter07 71 23.E2Pre-Finished SSMetal Roofing07 46 00.A1EIFS On 1"Insulation Board07 24 00.A28" x 8" x 16" SplitFace CMU04 22 00.F16AluminumComposit Panels07 46 00.A2P-53' - 6"Project Title601 St. Helens AveTacoma, Washington 98402Phone: (253) 922-4168ARCHITECTSPLLCSheet TitleProject Number:Date:Drawn:Checked:File:Scale:REVISIONS:NOTE: THESE DRAWINGS ARE PRODUCED EXCLUSIVELY FOR USE BY HHJ CONSTRUCTION INC. AND FOR PERMIT APPLICATION ONLY. ADDITIONAL DETAILING AND ENGINEERING SHALL BE REQUIRED BY ANY OTHER CONTRACTOR TO COMPLETE THE DRAWINGS TO "FOR CONSTRUCTION" PURPOSES.PLOT:1/8" = 1'-0"\\hhj-foundation\users\tanya\MyDocuments\Walker-Renton_Tanya613.rvt11/15/2018 4:17:57 PM03/26/18.AuthorCheckerA3.02Walker's RentonMazda - ValleyRoad DealershipEXTERIORELEVATIONSPROGRESS - 111518PROGRESS - 111518# Date Description1/8" = 1'-0"3NORTH ELEVATION1/8" = 1'-0"4EAST ELEVATION