HomeMy WebLinkAboutA_CCE Application and Checklist_BRH_181127_v1.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 5 | Published: 2/1/2018
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Website: rentonwa.gov
CIVIL CONSTRUCTION PERMIT APPLICATION
Published: 2/1/2018
1.Fill out Civil Construction Permit Application form and Project Cost Estimate.
2.Schedule an Intake Meeting with the assigned City Development Engineer.
3.The following items are all required at the First Intake meeting:
☐Electronic Copy of the Civil Construction Permit Application
☐Electronic Copy of the Intake Checklist
☐Electronic Copy of All Plans, Complete TIR, and all supporting reports and studies
☐Electronic Copy of the Bond Quantity Worksheet (.xlsx format)
☐Draft Electronic copy of easement and/or right-of-way dedication documents (note: not applicable to
plats; documents will be recorded at project close-out)
4.Upon completion of a successful and complete intake, the City has accepted the submitted materials for review
and the first review cycle has begun. The City reviewers will evaluate your plans for compliance with
development standards, applicable codes and regulations, and satisfaction of Land Use Decision conditions as
applicable to the civil construction permit.
Note: The Applicant has the option to schedule an informal pre-screen meeting prior to preparing the required
number of copies for the formal intake meeting. Applicants should coordinate with the assigned City Development
Engineer to determine if a pre-screen meeting is appropriate for their project. One complete copy of the application
package (including all items noted above) is required for informal review by the City Development Engineer. Please
allow approximately 45 minutes for the application screening.
Specific Code Section(s) related to this document
RMC Ch 4-6 Street and Utility Standards
RMC Ch 4-8 Permits – General and Appeals
Additional Design Resources and City Standards
City of Renton Surface Water Design Manual (RSWDM)
City of Renton Standard Details
City of Renton Forms
4
4
4
4
4
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 2 of 5 | Published: 2/1/2018
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Website: rentonwa.gov
CIVIL CONSTRUCTION PERMIT APPLICATION
Applicant Information
Name:
Address:
City: State: Zip:
Phone:
Email:
Engineer Information
Firm:
Address
City: State: Zip:
Contact:
Phone:
Email:
Earthwork and Clearing
Earthwork Volumes (cubic yards)
Cut: Fill: Total:
Total Site Area (SF):
Area of Site
Disturbance
Acres: SF:
(If more than 1 acre, NPDES Permit Required)
Property Owner Information
Name:
Address:
City: State: Zip:
Phone:
Email:
Public Improvements
Utilities Improvements (check all that apply):
☐Water ☐Wastewater ☐Stormwater
If not a City of Renton Utility, list provider jurisdiction and
service (i.e. Soos Creek Water & Sewer District):
Streets Improvements (check all that apply):
☐Curb/Gutter ☐Sidewalk ☐Planter Strip
☐Street Lights ☐Street Trees ☐Roadway
If any right-of-way is not owned by the City of Renton, list the
jurisdiction (i.e. King County, WSDOT):
Project Name:
Project Address/Location:
Parcel #(s):
Description of Project:
Related Permit(s): LUA#: B#: PRE#:
Type of Construction:
☐Short Plat (9 or fewer lots)☐Subdivision (10+ Lots)☐Commercial / Multi-Family
☐Tenant Improvement ☐Addition to Existing - Approximate Value of Addition: $
☐Clear and Grade & TESC Only
Pallet Storage Fire Service Extension
800 SW 27th Street, Renton WA 98057
252304-9064-04
Install a new above-ground pallet shed over existing asphalt with ±59LF of 6" water pipe
to provide fire service. A private PIV, FDC and internal detector check assembly are
included.
N/A 18001535 N/A
4 10,942.49
BRH Engineering
2009 Minor Ave E
Seattle WA 98102
(206) 323-4144
zacharye@brhinc.com
Trojan Litho
800 SW 27th Street
Renton WA 98057
(425) 873-5314
nick.pogreba@trojanlitho.com
BRH Engineering
2009 Minor Ave E
Seattle WA 98102
Zachary Evans
(206) 323-4144
zacharye@brhinc.com
32 18 50
10,525
0.03 1,114
4
CIVIL CONSTRUCTION PERMIT APPLICATION (CONT’D )
Page 3 of 5 | Published: 2/1/2018
Project Costs for Permit Fee Calculation
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal.
The balance is due at Permit Issuance. Significant changes or additional review cycles (beyond 3 cycles) during the
review process may result in adjustments to the final review fees.
It is required that you provide an itemized estimated cost of construction for proposed improvements to water (if the
project has City of Renton water service), wastewater (if the project has City of Renton wastewater service), stormwater,
and transportation facilities, both on-site and off-site.
Enter estimated costs in items (A) through (D):
(A)Water $
(B) Wastewater $
(C) Stormwater $
(D) Roadway $
(E) Total of Improvements
(A thru D)
$
This application does not constitute a permit to work. Work shall not commence until a civil construction permit
is issued and the pre-construction meeting has been held.
I certify that the information on this application is accurate to the best of my knowledge and I will be responsible
for any additional fees resulting from a different valuation.
Print Name Signature Date
Accepted By: Civil Construction Permit # Date
6,050.00
4,892.49
10,942.49
Nick Pogreba 11/28/18
Reset Costs
Pallet Storage Fire Service Extension