Loading...
HomeMy WebLinkAboutAvana Ridge - Traffic Concurrency Test.pdfDEPARTMENT OF COMMUNITYWool,0000 cAVO( `,_ AND ECONOMIC DEVELOPMENT eut n M E M O R A N D U M DATE: January 11, 2016 TO: Rocale Timmons, Senior Planner FROM: Brianne Bannwarth, Development Engineering Manager SUBJECT: Traffic Concurrency Test — Avana Ridge East and West; File No. B15008865 and B15008867 The applicant is requesting Building Permits for two apartment buildings under separate building permits. Avana Ridge East is 40 units (Permit No. 1315008865) and Avana Ridge West is 34 units (Permit No. 1315008867). The subject site is located at 10619 SE 1725nd Street. The vacant site is located within the Residential Multi -Family zoning classification. The proposed development would generate approximately 572 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 40 net new trips (8 inbound and 32 outbound). During the weekday PM peak hour, the project would generate approximately 58 net new trips (38 inbound and 20 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows: Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees Yes Site specific street improvements to be completed by project Yes Traffic Concurrency Test Passes Transportation Concurrency Test —Avana Ridge East and West Page 2 of 3 January 11, 2016 Evaluation of Test Criteria Implementation of citywide Transportation Plan: As shown on the attached citywide traffic concurrency summary, the city's investment in completion of the forecast traffic improvements are at 130% of the scheduled expenditure through 2015. Within allowed growth levels: As shown on the attached citywide traffic concurrency summary, the calculated citywide trip capacity for concurrency with the city adopted model for 2014 is 86,698 trips, which provides sufficient capacity to accommodate the 572 additional trips from this project. A resulting 86,126 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit for each new building. Site specific street improvements to be completed by project: The project will be required to complete all internal and frontage street improvements for the building prior to occupancy. Any additional off-site improvements identified through SEPA or land use approval will also be completed prior to final occupancy. Background Information on Traffic Concurrencv Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.13, which is listed for reference: D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test. If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. Transportation Concurrency Test —Avana Ridge East and West Page 3 of 3 January 11, 2016 The Concurrency Management System established in the Transportation Element on page XI -65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS -tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site specific mitigation, development will have met City of Renton concurrency requirements.