HomeMy WebLinkAbout180209_Sartori ES_N 3rd Street Offsite Signage and Striping.pdfTTTPARK AVE NN 3RD STREETCL PARK AVE STA: 20+00 =
CL N 3RD STREET STA: 9+96.42
20+00 8+0010+00THERMOPLASTIC TYPE 2L LEFT TURN
ARROW PER WSDOT M-24.20-02
THERMOPLASTIC SHALL CONTAIN 3M
SERIES WET DRY ELEMENT
SEE DETAIL 1 ON THIS SHEET
ON EXISTING OVERHEAD POLE AND WIRE
REMOVE EXISTING R3-6 SIGN.
INSTALL R3-5 SIGN.
THERMOPLASTIC TYPE 2L LEFT TURN
ARROW PER WSDOT M-24.20-02
THERMOPLASTIC SHALL CONTAIN 3M
SERIES WET DRY ELEMENT
SEE DETAIL 1 ON THIS SHEET
LEFT LANE MUST TURN LEFT SIGN
PER MUTCD R3-7L, SIGN INSTALLATION
PER DETAILS ON SHEET C7.11
MUTCD S1-1 "SCHOOL" SIGN
WITH ARROW TO CROSSWALK
PER MUTCD W 16-7
PER DETAIL 1 ON SHEET C6.8
THERMOPLASTIC TYPE 2L LEFT TURN
ARROW PER WSDOT M-24.20-02
THERMOPLASTIC SHALL CONTAIN 3M
SERIES WET DRY ELEMENT
SEE DETAIL 1 ON THIS SHEET
APPROACH LINE PER CITY OF
RENTON STANDARD PLAN H0002
ON THIS SHEET
LEFT LANE MUST TURN LEFT SIGN
PER MUTCD R3-7L, SIGN INSTALLATION
PER DETAILS ON SHEET C7.11
BEGIN WHITE PAINT ON FACE OF CURB
END WHITE PAINT ON FACE OF CURB
20.00'
20.00'
BEGIN APPROACH LINE
MUTCD S1-1 "SCHOOL" SIGN
WITH ARROW TO CROSSWALK
PER MUTCD W 16-7
PER DETAIL 1 ON SHEET C6.8
MUTCD S1-1 "SCHOOL" SIGN
WITH ARROW TO CROSSWALK
PER MUTCD W 16-7
PER DETAIL 1 ON SHEET C6.8
MUTCD S1-1 "SCHOOL" SIGN
WITH ARROW TO CROSSWALK
PER MUTCD W 16-7
PER DETAIL 1 ON SHEET C6.8
MUTCD S1-1 "SCHOOL" SIGN
WITH ARROW TO CROSSWALK
PER MUTCD W 16-7
PER DETAIL 1 ON SHEET C6.8
SARTORI ELEMENTARY SCHOOL
RENTON SCHOOL DISTRICTSARTORI ELEMENTARY SCHOOLLUA16-000692U16-006798PR16-0002152215 North 30th Street, Suite 300 Tacoma, WA 98403253.383.2422TEL 253.383.2572FAX www.ahbl.comWEB
T A C O M A SEATTLE SPOKANE TRI-CITIESKnow what's below.
before you dig.Call
R
1 ADDENDUM NO. 1 WJF 3/1/17 WJF
2 ADDENDUM NO. 3 WJF 3/17/17 WJF
3 CITY COMMENTS WJF 4/21/17 WJF
4 STORM DRAINAGE REVISIONS WJF 12/13/17 WJF NGRAPHIC SCALE
0 20 40
1" = 20 FEET
10
OFF-SITE SIGNAGE PLAN C6.10
1.THE CONTRACTOR SHALL COORDINATE WITH THE CITY OF RENTON TRANSPORTATION
MAINTENANCE DEPARTMENT FOR THE EXACT LOCATIONS OF ALL SIGNS.
2.THE CONTRACTOR SHALL TRIM ALL TREES ADJACENT TO NEW SIGNS TO PROVIDE
SIGHT DISTANCE AS REQUIRED BY THE CITY OF RENTON.
3.THE CONTRACTOR SHALL PROVIDE PRIVATE UTILITY LOCATES AT THE LOCATIONS OF
SIGNS. ADJUST THE LOCATIONS OF NEW FEATURES TO ENSURE CONFLICT WITH
UTILITIES DOES NOT OCCUR.
GENERAL NOTES: 8' - 0"2' - 8"3' - 0"1' - 0"8"8"2' - 4"1' - 6"
ELLIPSE "A"
AXIS
1' - 4"
1' - 2"
1' - 2"
10" ~ ELLIPSE "B" AXIS
ELLIPSE "A"
ELLIPSE "B"
CENTER POINT
OF ELLIPSES
MARKING AREA
7.73 SQ.FT.
GRID IS 4" (IN) SQUARE
SYMBOL & LANE
3' - 8"ELLIPSE "A" AXIS2' - 0"ELLIPSE "B" AXIS1 NOT TO SCALE
TYPE 2SL (LEFT) TRAFFIC ARROW
02/08/2018
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING
IFitz-James 02/09/2018