HomeMy WebLinkAboutStreet Lighting Inspection Checklist.pdfCITY OF RENTON STREET LIGHT-LUMINAIRE CHECKLIST Last Modified: 2/20/2017 CONTACT: PHONE: EMAIL: INSPECTOR NAMES: const/elect/maintenance / / ELECTRICAL CONTRACTORS NAME: PROJECT NAME(s): DATE OF INSPECTION COMPLETION: LOCATION: NOTE TO CONTRACTOR: Check to insure the following is installed as outlined in WSDOT Standard Specifications Section 8 & 9 or as amended by the Renton Standard details and is installed per the approved plans. Construction Inspection Checklist Lighting Contractor call 425-430-7203 for inspections 1-3 Date of Inspection: Initials of Inspector If Accepted CONSTRUCTION PERMIT# COMMENTS 1. Pole Foundations 2. Base Bolts 3. Cabinet foundation and Type Electrical Construction Inspection Checklist Lighting Contractor call 425-430-7202 for inspection 4 Date of Inspection: Initials of Inspector If Accepted ELECTRICAL PERMIT# COMMENTS 4. Underground/Rough-In Inspection: Junction Box/Conduit Size, Type, Burial Transportation Maintenance Inspection Checklist Lighting Contractor call 425-430-7423 for inspection 5 Date of Inspection: Initials of Inspector If Accepted CONSTRUCTION PERMIT# COMMENTS 5. Street Lighting Inspection for Project By City Maintenance confirming standard details and plans have been met prior to energizing (see list below for typical inspection items). Electrical Construction Inspection Checklist Lighting Contractor call 425-430-7202 for inspections 6-7 Date of Inspection: Initials of Inspector If Accepted ELECTRICAL PERMIT# COMMENTS 6. Service Inspection: Confirm electrical system conforms with Electrical Code prior to being energized. (See contractor requirements for energizing system.) 7. Final Inspection: Final Street Lighting Inspection for Project By Electrical Inspector once street lighting has been energized. Inspection 5: Typical inspection items reviewed during Maintenance Inspection: conductor size, insulation, type; electrical service panel (including address); grounding and connections; wire/splices/fuses; fixture and associated parts; poles and plumb/nut covers; decorative pad around vault; street lighting pole locations; pole numbers; and check for damage. Meg reading may be required. Inspection 6: Following inspection, electrical contractor is required to submit application to PSE to energize the street lighting. PSE application (201E) may be found at the following website: https://pse.com/accountsandservices/Construction/CCS%20Forms/1378_201E.pdf