HomeMy WebLinkAboutF_CIVIL_FINLEYSP_170828.pdfPR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017REGIONAL FIRE AUTHORITYcthomas 08/28/2017APPROVEDSURFACE WATER UTILITYrstraka 08/28/2017WASTEWATER UTILITYdchristen 08/29/2017
PR:16-000391DEVELOPMENT ENGINEERING
Ann Fowler 08/28/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017WATER UTILITYAbdoul Gafour 08/28/201750% OFWASTEWATER UTILITYdchristen 08/29/2017water main installation note: vertical bends and blocking shall be used when jointdeflection would exceed one-half of the pipemanufacturer's recommended maximum deflection.
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017WASTEWATER UTILITYdchristen 08/29/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017WASTEWATER UTILITYdchristen 08/29/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017
PR:16-000391DEVELOPMENT ENGINEERINGAnn Fowler 08/28/2017SURFACE WATER UTILITYrstraka 08/28/2017
U-16005573B17002541PR:16-000391CURRENT PLANNINGcclose 08/28/2017
U-16005573B17002541PR:16-000391CURRENT PLANNINGcclose 08/28/2017
U-16005573B17002541PR:16-000391CURRENT PLANNINGcclose 08/28/2017
EarthSolutionsNWLLCEarthSolutionsNWLLCGeotechnicalEngineering,ConstructionMonitoringPlateProj.No.Drwn.ByCheckedByDateDateRevisionsandEnvironmentalSciencesR1RockeryDesignsandNotesFINLEYSHORTPLAT Renton,Washington4338.0105/17/2017MRSHTW07/19/2017PerReviewCommentsGENERAL NOTES
A.Rockery construction shall be performed in accordance with the Associated Rockery
Contractor Guidelines.
B.Rockery construction is a craft.The skill and experience of the builder will largely dictate
the success of the construction.
C.A rockery is a protective system with respect to weathering and erosion processes
on an exposed soil face.
D.Maximum inclination of the slopes above and in front of rockeries should be 2H :1V
(Horizontal :Vertical).
E.Minimum thickness of filter drain rock shall be 12 to 18 inches as specified.
F.Rockeries should be installed under periodic or full-time observation by the Geotechnical
Engineer as appropriate.
G.The long dimension of the rocks should extend back towards the cut or fill face to provide
maximum stability.
H.Rocks should be placed to avoid continuous joint planes in vertical or lateral directions.
Each rock should bear on two or more rocks below it,with good flat-to-flat contact.
I.For Fill Rockeries,it is imperative that Structural Fill compaction extend all the way to the
back of the Rockery and Filter Drain Rock Zone.Reduced lift thickness and light compaction
equipment may be required to fully achieve the required compaction.
J.Reference:Encompass Engineering &Surveying,Grading and Drainage Control Plan,
sheet 5 of 10,Dated November 18,2016
K.The following design assumptions were used:
Inter
Size Approximate
Weight -lbs.
Approximate
Diameter (in.)
1 Man
2 Man
3 Man
4 Man
5 Man
6 Man
50 -200
200 -700
700 -2000
2000 -4000
4000 -6000
6000 -8000
12 -18
18 -28
28 -36
36 -48
48 -54
54 -60
NATIVE CUT ROCKERY
A.The Geotechnical Engineer shall observe cuts for the rockery.Additional flattening
of cuts may be recommended by the Geotechnical Engineer depending on the soil
and groundwater conditions observed.Where Native Cuts do not expose competent
Native Soils,additional excavation,as well as addition of reinforcement and Compacted
Structural Fill,may be necessary.
FIELD QUALITY CONTROL
A.The rockery construction shall be observed by the Geotechncial Engineer on a periodic or
full-time basis as appropriate.Testing of the compacted backfill shall be performed by
the Geotechnical Engineer.
B.Quality assurance shall include foundation soil inspection,soil and backfill testing,
verification of design parameters,and observation of construction for general compliance
with design drawings and specifications.
GEOGRID SOIL REINFORCEMENT
A.Structural geogrid reinforcement shall consist of Miragrid 5XT,or an alternative as approved
by the Geotechnical Engineer.
STRUCTURAL FILL
A.Structural Fill shall consist of granular well-graded material with a fines content less
than 25 percent (percent passing the #200 sieve based on the minus three-quarter
inch fraction).Some rockery applications may require the use of “select”free-draining
Structural Fill Material.Structural Fill Material shall be approved and tested by the
Geotechncial Engineer.
STRUCTURAL GEOGRID INSTALLATION
A.Geogrid shall be oriented with the highest strength axis perpendicular to the rockery
alignment.
B.Geogrid Reinforcement shall be placed at the strengths,lengths,and elevations shown on
the construction design drawings or as directed by the Geotechnical Engineer.
C.The geogrid shall be laid horizontally on compacted backfill and extend to the back of
the rockery.The geogrid shall be pulled taut and anchored prior to backfill placement
on the geogrid.
D.Geogrid Reinforcements shall be continuous throughout their embedment lengths and
placed side-by-side to provide 100%coverage at each level.Spliced connections
between shorter pieces of geogrid or gaps between adjacent pieces of geogrids are not
permitted.
REINFORCED BACKFILL PLACEMENT
A.Reinforced Backfill shall be placed,spread,and compacted in such a manner that
minimizes the development of slack in the geogrid and installation damage.
B.Reinforced Backfill shall be placed and compacted in lifts not to exceed 6 inches where
hand compaction is used,or 8 to 10 inches where heavy compaction equipment is used.
Lift thickness shall be decreased to achieve the required density as required.
C.Reinforced Backfill shall be compacted to 95%of the maximum density as determined
by ASTM D1557.The moisture content of the backfill material prior to and during
compaction shall be at or near the optimum moisture content.
D.The required compaction shall extend all the way to the back of the Rockery and Filter
Drain Rock Zone.
E.Only lightweight hand-operated equipemnt shall be allowed within 3 feet of the back
of the rockery.
F.Tracked construction equipment shall not be operated directly upon the geogrid
reinforcement.A minimum fill thickness of 6 inches is required prior to operation of
tracked vehicles over the geogrid.Tracked vehicle turning should be kept to a minimum
to prevent tracks from displacing the fill and damaging the geogrid.
G.Rubber tired equipment may pass over geogrid reinforcement at speeds less than
10 mph.Sudden braking and sharp turning shall be avoided.
H.At the end of each day’s operation,the Contractor shall slope the last lift of reinforced
backfill away from the rockery to direct runoff away from wall face.The Contractor
shall not allow surface runoff from adjacent areas to enter the wall construction site.
()
1
6
2'(Typ.)
4"Diameter Perforated PVC
Drain Pipe (By Others)
Connect to Approved Discharge
12"(Min.)
Exposed Rockery Height
H =6'(Max.)
Upper One-Third
2 Man Rock
Middle One-Third
3 &4 Man Rock
Lower One-Third
5 Man Rock
Reinforced
Fill
2"to 4"
Filter Drain Rock
(Extend Along Entire Height
of Rockery)
ENGINEERED FILL
ROCKERY DETAIL
NOT -TO -SCALE
Competent Cut
(Geotechnical Engineer
to Confirm)
12"to 18"
Structural
Fill
Layer 1
Layer 2
Layer 3
Geogrid Reinforcement
Miragrid 5XT
5'setback
LR =H
NOTE:Property lines and building
footings located per civil plans.
1
6 Competent Cut
(Geotechnical Engineer to Confirm)
4"Diameter Perforated PVC
Drain Pipe (By Others)
Connect to Approved Discharge
12"(Min.)
Exposed Rockery Height
H =6'(Max.)
Upper One-Third
2 Man Rock
Middle One-Third
3 &4 Man Rock
Lower One-Third
5 Man Rock
2"to 4"
Filter Drain Rock
(Extend Along Entire Height
of Rockery)
SINGLE -TIER
COMPETENT CUT ROCKERY
DETAIL
NOT -TO -SCALE
Finish Grade shall slope away from back
of rockery or top of slope at 2 percent
or as approved by the Geotechncial Engineer.
2%Slope
12"to 18"
1
1 Footing element must be placed beyond
the 1H :1V projection as drawn from the
back of the base rock.
NOTE:Property lines and building
footings located per civil plans.
Internal angle of friction for reinforced soil =32 degrees
Unit weight of reinforced soil =125 pcf
Maximum rockery height =8 feet
Batter of rockery =1H :6V
Surcharges =250 psf Uniform Slope Surcharge (where applicable)
2500 lb.Footing Strip Load
B17002541PR:16-000391LUA:16-000330U:16005573