Loading...
HomeMy WebLinkAboutF_RS_TIR_FinleySP_170824.pdfR-3950 U-16005573 PR-16000391 LUA-16000330 IN COMPIANCE WITH CITY OF RENTON STANDARDS FINAL DEVELOPMENT ENGINEERING Ann Fowler 08/28/2017 R-3915 SURFACE WATER UTILITY rstraka 08/28/2017 TABLE OF CONTENTS SECTION 1 - PROJECT OVERVIEW ............................................................................................. 2 FIGURE 1 ....................................................................................................................................... 3 TIR Worksheet FIGURE 2 ....................................................................................................................................... 8 Site Location FIGURE 3 ....................................................................................................................................... 9 Drainage Basins, Sub-Basins & Site Characteristics FIGURE 4 ..................................................................................................................................... 12 NRCS Soils Report SECTION 2 - CONDITIONS AND REQUIREMENT SUMMARY ................................................. 27 SECTION 3 – OFFSITE ANALYSIS ............................................................................................. 29 SECTION 4 – FLOW CONTROL & WATER QUALITY ANALYSIS ............................................ 34 SECTION 5 – CONVEYANCE SYSTEM ANALYSIS & DESIGN ................................................ 38 SECTION 6 – SPECIAL REPORTS & STUDIES ......................................................................... 43 SECTION 7 – OTHER PERMITS .................................................................................................. 43 SECTION 8 – CSWPPP ANALYSIS & DESIGN .......................................................................... 43 SECTION 9 – BOND QUANTITIES, FAC. SUMMARY & DEC. OF COVENANT ....................... 45 SECTION 10 – OPERATIONS & MAINTENANCE MANUAL ...................................................... 45 APPENDIX A – GEOTECHNICAL REPORT ................................................................................ 47 APPENDIX B – ARBORIST REPORT .......................................................................................... 48 APPENDIX C – KCRTS ANALYSIS ............................................................................................. 49 APPENDIX D – BOND QUANTITY WORKSHEET ...................................................................... 50             Page 1  Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15 Page 16 Page 17 Page 18 Page 19 Page 20 Page 21 Page 22 Page 23 Page 24 Page 25 Page 26 Page 27 Page 28 Page 29 Page 30 Page 31 Page 32 Page 33 Page 34 Page 35 Page 36 Page 37 Page 38 Page 39 Page 40 Page 41 Page 42 Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50