HomeMy WebLinkAboutF_RS_Renton SCC TIR_180222.pdfDEVELOPMENT ENGINEERINGBrianne Bannwarth 02/21/2018SURFACE WATER UTILITYrstraka 02/21/2018FINALR-3962C-17002683LUA-17000023PR-17000057DEVELOPMENT ENGINEERINGAnn Fowler 02/22/2018
TABLE OF CONTENTS
Section Title
1 Project Overview 1-1
2 Conditions and Requirements Summary 2-1
3 Offsite Analysis 3-1
4 Flow Control/Water Quality Facility Analysis and Design 4-1
5 Conveyance System Analysis and Design 5-1
6 Special Reports and Studies 6-1
7 Other Permits 7-1
8 SWPPP Analysis and Design 8-1
9 Bond Quantities, Facility Summaries 9-1
10 Operations and Maintenance Manual 10-1
Technical Information Report 1-1 LDC Job No. 16-137
1 PROJECT OVERVIEW
The Renton Special Care Community project proposes the construction of four
cottages, three for resident housing and the fourth to act as the administration/
kitchen building. Approximately 50,000 SF of impervious surface and roughly 21,000
SF of pervious surface is proposed onsite and within the Right-of-Way frontage. The
proposed development proposes four convalescent buildings, access drive aisles,
parking, associated utilities and ROW improvements on a 1.65 acre site. The subject
property is located on parcels 0087000285 and 0087000293 at 17033 108th Avenue SE,
Renton, WA 98055. Access to the proposed project will be gained from the south and
east via SE 172nd St and 108th Ave SE respectively.
The subject property is comprised of two parcels, one is currently developed with a
vacant single-family residence, associated driveway and landscaped areas and the
other parcel is undeveloped with moderate to dense vegetation. Site soils are dense
to very dense Vashon Till, exhibiting low infiltration rates. Existing grades across the
property are moderate across most the site, ranging from 2 to 25%, sloping mainly
from the northeast to the southwest.
Runoff from the site currently flows to the southwest and exits the subject property
at the southwest corner of the site, entering the municipal storm drainage system
located in SE 172nd ST. Downstream flows eventually outlet into the Black River, a
tributary of the Duwamish River.
A lot combination will be completed to combine the two parcels to one. Offsite
frontage clearing activities will result in additional disturbed area impacts to the site.
See Developed Hydrology Map, Figure 4.2 for a graphical depiction of the proposed
development.
This report and calculations were produced in accordance with the 2016 King County
Surface Water Design Manual and the 2017 City of Renton Surface Water Design
Manual (2017 City of Renton SWDM).
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
Renton Special Care Community LLC Renton Special Care Community
98040
C17002683
2731 77th AVE SE, Suite #203 Mercer Island, WA
29
Mark Villwock 5E
LDC, Inc.29
425-806-1869 17033 108th AVE SE
Renton, WA 98055
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual
8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
none
none
none
none
none
N/A N/A
N/A N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 / 2 / 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
On-site BMPs: _______________________________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
Vashon Till 2-25%N/A
section 3 pg 3-1
section 3 pg 3-1
section 2 pg 2-2
N/A
N/A
N/A
Flows exit the site and proceed through a series of culverts and roadside ditches crossing state route 515.
All 9 requirements are required
12/6/16
Detention Pipe
N/A
Michael S. Place, PE
(425)409-2505
(253)255-7805
1
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual
8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation Responsibility (circle one): Private / Public
If Private, Maintenance Log Required: Yes / No
Financial Guarantees and Liability Provided: Yes / No
Water Quality (include facility
summary sheet)
Type (circle one): Basic / Sens. Lake / Enhanced Basic / Bog
or Exemption No. _______________________
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO / MDP / BP / Shared Fac. / None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major / Minor / Exemption / None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes / No
Treatment BMP: _________________________________
Maintenance Agreement: Yes / No
with whom? _____________________________________
Other Drainage Structures
Describe:
N/A
N/A
Grease Interceptor Used
contech Filterra Enhanced Water Treatment Facility
Commercial
N/A
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
________________
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4′ High
Structural on Steep Slope
Other _______________________________
Detention Pipe
Porous Pavement
Grease Interceptor
Planning
Structural
Engineering
Survey
PlanningStructuralEngineeringSurvey24Ä.7#Ä%
4'061052'%+#.%#4'6'&ÄÄ604 SF (with noattributing run-on)permeable pavementflow control BMPRun-on (to permeable pavement)Proposed Permeable FlowControl BMP Per CORSWDM C.2.71,055 SF (with no attributing run-on)642 SF (with no attributing run-on)2,255 SF
Technical Information Report 2-1 LDC Job No. 16-137
2 Conditions and Requirements Summary
This report was produced in accordance with the 2017 City of Renton Surface Water
Design Manual (2017 City of Renton SWDM). Per Chapter I of the Manual, the
proposed development requires a Full Drainage Review, meeting all nine core
requirements as well as all six special requirements, since there will be more than
2,000 square feet of new impervious surfaces and more than 7,000 sf of land
disturbing activities. A summary of how each of the minimum requirements is met is
described in this section.
Core Requirement #1: Discharge at the Natural Location: The existing site runoff
discharges the site along the southern and western property boundaries. All site
runoff ends up in a roadside ditch located on the north end of SE 172nd ST. In the
developed condition all runoff will be conveyed to the previously described natural
discharge location.
Core Requirement #2: Offsite Analysis: No discernable upstream run-off flows onto
the subject property. Onsite runoff discharges as concentrated flow into a roadside
ditch and culvert located in the southwest corner of the property. Downstream flows
are conveyed in the westerly direction through a series of roadside ditch, culvert,
storm pipe, catch basins and natural and engineered drainage swales. No signs of
constrictions, capacity issues, erosion or sedimentation were noted along the
downstream investigation. See Offsite Analysis in Section 3 of this report.
Core Requirement #3: Flow Control: Historic site conditions, assuming all forested,
must be used for the predeveloped conditions. Flow control will be provided by a
detention pipe facility located beneath the parking and access drive aisle along the
western and northern property boundaries. See Flow Control/Water Quality Facility
Analysis and Design, section 4 of this report for additional information.
Technical Information Report 2-2 LDC Job No. 16-137
Core Requirement #4: Conveyance System: The new pipe system for this project
will be sized to meet the 100-year peak flows. See Conveyance System Analysis and
Design, section 5, for additional information regarding conveyance analysis and
conveyance capacity.
Core Requirement #5: Erosion and Sediment Control: See SWPPP Analysis and
Design, Section 8 of this Report for the SWPPP BMP Elements.
Core Requirement #6: Maintenance and Operations: The stormwater detention and
water quality facilities will be maintained by the property owner. An emergency
access easement will be granted to the City of Renton. See Operations and
Maintenance in Section 10 of this report.
Core Requirement #7: Financial Guarantees and Liability: Any required
performance or assurance bonds will be posted with the City as required.
Core Requirement #8: Water Quality: Based on the 2017 City of Renton SWDM, this
project must meet the requirements of the Enhanced Basic Water Quality Treatment.
The proposed enhanced treatment facility is a Filterra Bioretention Systems an
approved method by 2017 RSWDM section 14-A. See Flow Control/Water Quality
Analysis and Design in Section 4 of this report for additional information.
Core Requirement #9: On-site BMPs: The 2017 City of Renton SWDM requires that all
target surfaces must provide onsite BMPs to the maximum extent feasible to mitigate
impacts of increased stormwater surface runoff per Large Lot BMP Requirements,
section C.1.3.2. Permeable Pavement is the only feasible BMP applied to the site per
section C.2.7, satisfying the onsite BMP requirements. Additionally all pervious
surfaces will be protected in accordance with the soil amendment BMP detailed in
Appendix C, Section C.2.1.3. See Flow Control/Water Quality Analysis and Design in
Section 4 of this report for additional information.
Technical Information Report 2-3 LDC Job No. 16-137
Special Requirement #1: Other Adopted Area-Specific Requirements: There are no
Critical Drainage Areas, Master Drainage Plans, Basin Plans, Salmon Conservation
Plans, Stormwater Compliance Plans, Lake Management Plans, Flood Hazard
Reduction Plan Updates, or Shared Facility Drainage Plans within the vicinity of this
project. Therefore, this requirement does not apply to the project.
Special Requirement #2: Flood Hazard Area Delineation: Per the FEMA Flood
Insurance Rate Map 53033C0979 F, the site is located in Zone C corresponding to an
area outside of the 500-year flood plain. Therefore, there are no flood hazard areas
(100-year floodplains, zero-rise flood fringe, zero-rise floodway, FEMA floodway, or
channel migration zones) on or adjacent to this site. Therefore, this requirement
does not apply to the project.
Special Requirement #3: Flood Protection Facilities: There are no levees or
revetments on or adjacent to this site. Therefore this requirement does not apply to
the project.
Special Requirement #4: Source Controls: Source controls such as wheel wash
stations and utility corridor maintenance are proposed within the SWPPP and TESC
plan.
Special Requirement #5: Oil Control: Based on the Traffic Analysis report by Gibson
Traffic Consultants, Inc dated June 2016 there are an estimated 150 ADT for the
whole site which is a total of 65,715 sf. The threshold for requiring oil control is 100
ADT per 1,000 SF , since our site will only bring in a total of 150ADT for the site the
proposed site does not exceed the threshold.
Special Requirement #6 Aquifer Protection Area: This project is not within an
aquifer protection area and is therefore not applicable to this project.
Technical Information Report 3-1 LDC Job No. 16-137
3.0 OFFSITE ANALYSIS
Task 1. Study Area Definition and Maps
King County LiDAR, survey, and 2012 aerial photography were the best topographical
references available for the area containing the site. The limits of downstream
analysis extended roughly 0.25 miles from the site’s natural discharge location. Please
reference Task 3 below for a detailed description of the downstream flow path (See
Figure 3.0 Downstream Analysis Map).
Task 2. Resource Review
All of the resources below have been reviewed for existing and potential issues near
the project site:
Adopted Basin Plans
No Adopted Basin Plans were located that include the project site.
Drainage Basin
This site is located within the Panther Creek drainage sub basin. The sub
basin flows are tributary to the Black River and ultimately to the Duwamish
River.
Floodplain / Floodway (FEMA) maps
According to FEMA mapping this project is not within a floodplain.
Sensitive Areas
Sensitive areas are not located on the site.
Drainage Complaints and Studies
According to email correspondence with Ann Fowler, on 10/13/2017, there are
not any drainage complaints of concern in or near the subject property’s
downstream flow path.
Road Drainage Problems
No issues were identified near the proposed site.
Technical Information Report 3-2 LDC Job No. 16-137
Wetland Inventory Maps
There are no wetland areas located on or downstream of the proposed subject
property. This has been verified in the critical areas study as completed by
others
Section 303d List of Polluted Waters
The proposed subject property is not tributary to any 303d listed waters
within ¼ of a mile from the subject property.
Stormwater Compliance Plans
Not applicable to the proposed project.
Task 3. Field Inspection
On Tuesday December 6th, 2016 upstream and downstream analyses were performed
at the site. The following observations were verified during this visit. Please refer to
Figure 3.0, Downstream Analysis Map, for reference locations.
Upstream Analysis
As observed on December 6th, 2016 site visit, there is no discernable upstream flow
entering the proposed site.
Downstream Analysis
Runoff from the subject property discharges the site at the southwest property
boundary and enters a 12” concrete driveway culvert located on the northern side of
SE 172nd St. Flows continue westward through the roadside ditch and are redirected
southerly, crossing SE 172nd St via a 12” concrete culvert, and are discharged into an
open densely vegetated parcel to the south. Flows then enter an 18 inch concrete
culvert, flow westerly, crossing State Route 515 Benson Dr. S, and are discharged into
an engineered open channel located on a private parcel. Open channel flows are
mitigated via 12”+ riprap and flows enter an 18” PVC pipe. Tightlined flows are
conveyed westerly via 18” PVC pipe along S 36th St., crossing the ¼ mile downstream
analysis extent boundary.
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(2502
6
0 2702802
9
0 310
3
3
0
420410390380
370
2903202002102202302404003
903803703604104
0
0390230240
320330340330340200
2
1
0 260270280290190410240
250410310
300340
3
60
380350370 420430190300350
3.0FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F03
DRAWING BY: T.ABBOTTDATE: 12-07-16SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: T.ABBOTT
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137DownstreamAnalysisMap.mxd | MOD: 12/07/2016 | DEWVICINITY MAP
17033 108TH AVE SE, RENTON, WA 98055RENTON SPECIAL CARE COMMUNITYDOWNSTREAM ANALYSIS MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYHWY 167¬«515
!(1
!(2!(3!(4
q
Scale in Feet
200 0 200
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Downstream Flowpath
Storm Node
Parcel Boundary
Storm System
!(
Parcel Boundary
Technical Information Report 3-3 LDC Job No. 16-137
Image 1: Downstream flow conveyed in SE 172nd St roadside ditch
Image 2: Concentrated flows are discharged from 18” concrete culvert crossing Benson Dr S (State
Route 515) into an open channel heading westward
Technical Information Report 3-4 LDC Job No. 16-137
Image 3: Open channel flows are mitigated with riprap and collected and conveyed westward via
18” PVC storm drain pipe
Image 4: Downstream flows are conveyed westerly through a series of catch basins and 18” storm
drain pipe located in S 36th St, crossing the ¼ mile downstream analysis extent threshold
Technical Information Report 4-1 LDC Job No. 16-137
4.0 FLOW CONTROL/WATER QUALITY FACILITY ANALYSIS AND DESIGN
The flow control and water quality requirements are identified in the 2017 City of
Renton Surface Water Design Manual.
Pre-Developed Conditions:
See the following page, Figure 4.1 Existing Hydrology Map, for a graphical depiction of
the pre-developed hydrology. See below for the areas as modeled in WWHM4:
Targeted Basin:
Forested 1.65 Acres
Total 1.65 Acres
Developed Conditions:
See the following page, Figure 4.2 Developed Hydrology Map, for a graphical depiction
of the developed hydrology. See below for the areas as modeled in WWHM4:
Basin A (tributary to detention facility):
Pervious landscape 0.39 Acres
Impervious 0.96 Acres
Total 1.25 Acres
Pervious Pavement (tributary to detention facility):
Pervious Pave 4,556 SF
Total 0.10 Acres
Detention Bypass:
Pervious 0.23 Acres
Impervious 0.07 Acres
Total 0.30 Acres
410410
390400390
4 0 0
4004104104.1FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F04
DRAWING BY: D.WESTLEYDATE: 9-6-17SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: D.WESTLEY
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137PredevelopedHydrologyMap.mxd | MOD: 9/06/2017 | TPAVICINITY MAP
RENTON SPECIAL CARE COMMUNITY, LLCRENTON SPECIAL CARE COMMUNITYEXISTING HYDROLOGY MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893q
Scale in Feet
0 40 80
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Parcel Boundary PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT
Watercourse 108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYDEVELOPED BASIN ATOTAL = 1.69 AC
DEVELOPED BASIN ATOTAL = 1.69 AC
GRIND AND OVERLAY
410
390400390
4 0 0
400410410410
4.2FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F4.2
DRAWING BY: D.WESTLEYDATE: 9-06-2017SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: D.WESTLEY
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137DevelopedHydrologyMap.mxd | MOD: 9/06/2017 | TPAVICINITY MAP
RENTON SPECIAL CARE COMMUNITY, LLCRENTON SPECIAL CARE COMMUNITYDEVELOPED HYDROLOGY MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893q
Scale in Feet
0 40 80
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Parcel Boundary PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT
Watercourse 108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYDEVELOPED BASIN A1.35 AC
DEVELOPED BASIN AREAS
DEVELOPED BASIN A TOTAL
TOTAL =1.35 ACPERVIOUS0.39 AC
LID PERMEABLE PAVEMENT 0.10 ACIMPERVIOUS0.96 AC
BYPASS BASIN TOTAL = 0.30 AC FLOW CONTROL MITIGATION TRADE*
NON-TARGET EXISTING PAVEMENT TO FLOW CONTROL FACILITY=3,500 SF
ROW PAVEMENT FLOW CONTROL BYPASS =200 SF
PRIVATE DRIVE PAVEMENT FLOW CONTROL BYPASS =1,800 SF
FLOW CONTROL BYPASS
TOTAL =0.30 ACPERVIOUS0.23 ACIMPERVIOUS0.07 AC
NON-TARGET IMPERVIOUS SURFACEEXISTING PAVEMENT 3,500 SF
TARGET SURFACE AREA BYPASS
TOTAL =3,500 SFPRIVATE DRIVE PAVEMENT 1,800 SF
ROW PAVEMENT 200 SF
MITIGATION TRADE NET
TOTAL =0 SFTARGET (BYPASS)- 3,500 SFNON-TARGET (TO FC)3,500 SF
* ALL AREAS NOTED ARE PGIS.CALCULATIONS REFLECT PGIS TRADE CALCULATIONS.
PAVEMENT FLOW CONTROL BYPASS = 1,500 SF
ROW PAVEMENT 1,500 SFGRIND AND OVERLAY
Technical Information Report 4-2 LDC Job No. 16-137
4.1 Flow Control Facility
Based on the City of Renton’s flow control map and City of Renton Municipal Code 4-
6-030.c., the site falls within the Flow Control Duration Standard (for Forested Site
Conditions). Flow control standards shall be according to the 1.2.3.B of the 2017
RSWDM. Flow control performance “shall match the predeveloped site’s discharge
duration for the discharge rates between fifty percent (50%) of the two (2) year peak
flow through the fifty (50) year peak flow and the two (2) and ten (10) year peak
discharge assuming forested site conditions as the predeveloped site condition”.
The proposed detention pipe facility has been designed in accordance with the City of
Renton SWDM design criteria in section 5.1.2.1, general requirements for Detention
Tanks. Flow control compliance modeling and analysis has been assessed using WWHM
4 in accordance with the 2017 City of Renton SWDM section 5.1.2.2.
WWHM Modeled Detention Pipe
Pipe Diameter: 8’
Pipe Length: 480’
Bottom of Pipe: 390.00
Sediment Storage: 0.5’
Begin Live Storage: 391.50
Live Storage Depth: 7.0’
Top of Riser Elevation: 398.50
Freeboard: 0.5’
Top of Pipe Elevation: 399.00
See the following pages for the WWHM 4 project report containing predeveloped and
mitigated land use description, detention facility hydraulic table, predeveloped and
mitigated hydrology and release rates, and analysis passing report summary.
Flow Control Mitigation Trade
A flow control facility mitigation trade is utilized per 2017 City of Renton SWDM
section 1.2.3.2.G, Mitigation Trades. The project’s onsite flow control facility has
been designed to mitigate for an area of existing non-targeted impervious surface
area located in the 108th AVE SE frontage road in trade for not mitigating part of the
Technical Information Report 4-3 LDC Job No. 16-137
project’s targeted impervious surfaces that cannot be vertically routed to the
proposed flow control facility. The target impervious surface areas being traded are a
portion of the 108th AVE SE ROW and a portion of the private drive aisle at the
southwestern portion of the site. The proposed mitigation trade meets or exceeds
conditions, #1 through #5, per section 1.2.3.2.G.
Condition 1: Both the non-targeted existing pavement and both ROW pavement flow
control bypass areas are made up of roadway runoff. The non- target pavement flow
are similar in peak flow and volume as the ROW pavement control bypass as seen in
Figure 4.2.
Condition 2: The non-targeted existing pavement, and area identified to be traded is
all within the same drainage basin and all flows converge without an easement.
Condition 3: The same amount of PGIS is being traded both from ROW which results
in a similar amount of runoff volume which means the net effect will essentially be
zero for this trade.
Condition 4: There are no sensitive downstream drainage systems downstream of the
project site thus there would not be a significant adverse impact downstream to this
trade.
Condition 5: The area proposed to be traded is ROW pavement and will not be
developed further in the future besides pavement restoration.
Condition 6: Mitigation trade proposals must be reviewed and approved with input
from the City of Renton. Please see Figure 4.2, Developed Hydrology Map, for a
graphical depiction of the proposed flow control mitigation trade areas.
Technical Information Report 4-4 LDC Job No. 16-137
Additional target surfaces that cannot be routed to the onsite flow control facilities
will be modeled in WWHM as bypass, per the conditions listed in the 2017 City of
Renton SWDM section 1.2.3.2.E all the conditions are met as follows:
Condition 1: The bypass trade both onsite and offsite are both within the same
drainage basin and converge within a quarter mile downstream.
Condition 2: The bypass increase does not exceed 0.4 cfs as seen in the WWHM 4
output.
Condition 3: There are no sensitive downstream drainage systems downstream of the
project site thus there would not be a significant adverse impact downstream due to
the bypass.
Condition 4: The bypass trade will be collected and treated for water quality.
Condition 5: The difference between the peak 100-year discharge using 15-min time
steps compared to the existing site conditions does not exceed 0.15 cfs. The flow
control facility provides additional storage volume to account for the bypass flows
without receiving the bypass flows.
Please see Figure 4.2, Developed Hydrology Map, for a graphical depiction of the
proposed flow control bypass areas. See WWHM4 model output for just bypass
predeveloped and developed pre-mitigated (701) flows following WWHM4 Project
Report.
WWHM4
PROJECT REPORT
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 2
General Model Information
Project Name:20170918_ConstructionSizing
Site Name:
Site Address:
City:
Report Date:9/20/2017
Gage:Seatac
Data Start:1948/10/01
Data End:1998/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2016/11/23
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 1.64
Pervious Total 1.64
Impervious Land Use acre
Impervious Total 0
Basin Total 1.64
Element Flows To:
Surface Interflow Groundwater
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Pasture, Flat 0.29
Pervious Total 0.29
Impervious Land Use acre
ROADS FLAT 0.35
ROOF TOPS FLAT 0.39
SIDEWALKS FLAT 0.21
Impervious Total 0.95
Basin Total 1.24
Element Flows To:
Surface Interflow Groundwater
Tank 1 Tank 1
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 5
Bypass
Bypass:Yes
GroundWater:No
Pervious Land Use acre
C, Pasture, Flat 0.23
Pervious Total 0.23
Impervious Land Use acre
ROADS FLAT 0.03
SIDEWALKS FLAT 0.04
Impervious Total 0.07
Basin Total 0.3
Element Flows To:
Surface Interflow Groundwater
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 6
Routing Elements
Predeveloped Routing
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 7
Mitigated Routing
Porous Pavement 1
Pavement Area:0.1031 acre.Pavement Length: 67.00 ft.
Pavement Width: 67.00 ft.
Pavement slope 1:0.03 To 1
Pavement thickness: 0.5
Pour Space of Pavement: 0.35
Material thickness of second layer: 2
Pour Space of material for second layer: 0.35
Material thickness of third layer: 0
Pour Space of material for third layer: 0
Infiltration On
Infiltration rate:0.05
Infiltration safety factor:1
Total Volume Infiltrated (ac-ft.):12.312
Total Volume Through Riser (ac-ft.):0.073
Total Volume Through Facility (ac-ft.):12.384
Percent Infiltrated:99.42
Total Precip Applied to Facility:0
Total Evap From Facility:1.011
Element Flows To:
Outlet 1 Outlet 2
Tank 1
Porous Pavement Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.103 0.000 0.000 0.000
0.0333 0.103 0.001 0.000 0.005
0.0667 0.103 0.002 0.000 0.005
0.1000 0.103 0.003 0.000 0.005
0.1333 0.103 0.004 0.000 0.005
0.1667 0.103 0.006 0.000 0.005
0.2000 0.103 0.007 0.000 0.005
0.2333 0.103 0.008 0.000 0.005
0.2667 0.103 0.009 0.000 0.005
0.3000 0.103 0.010 0.000 0.005
0.3333 0.103 0.012 0.000 0.005
0.3667 0.103 0.013 0.000 0.005
0.4000 0.103 0.014 0.000 0.005
0.4333 0.103 0.015 0.000 0.005
0.4667 0.103 0.016 0.000 0.005
0.5000 0.103 0.018 0.000 0.005
0.5333 0.103 0.019 0.178 0.005
0.5667 0.103 0.020 0.252 0.005
0.6000 0.103 0.021 0.308 0.005
0.6333 0.103 0.022 0.356 0.005
0.6667 0.103 0.024 0.398 0.005
0.7000 0.103 0.025 0.436 0.005
0.7333 0.104 0.026 0.471 0.005
0.7667 0.104 0.027 0.504 0.005
0.8000 0.104 0.029 0.535 0.005
0.8333 0.104 0.030 0.564 0.005
0.8667 0.104 0.031 0.591 0.005
0.9000 0.104 0.032 0.617 0.005
0.9333 0.104 0.033 0.643 0.005
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 8
0.9667 0.104 0.035 0.667 0.005
1.0000 0.104 0.036 0.690 0.005
1.0333 0.104 0.037 0.713 0.005
1.0667 0.104 0.038 0.735 0.005
1.1000 0.104 0.039 0.756 0.005
1.1333 0.104 0.041 0.777 0.005
1.1667 0.104 0.042 0.797 0.005
1.2000 0.104 0.043 0.817 0.005
1.2333 0.104 0.044 0.836 0.005
1.2667 0.104 0.046 0.855 0.005
1.3000 0.104 0.047 0.873 0.005
1.3333 0.104 0.048 0.891 0.005
1.3667 0.104 0.049 0.909 0.005
1.4000 0.104 0.050 0.926 0.005
1.4333 0.104 0.052 0.943 0.005
1.4667 0.104 0.053 0.960 0.005
1.5000 0.104 0.054 0.976 0.005
1.5333 0.105 0.055 0.993 0.005
1.5667 0.105 0.057 1.009 0.005
1.6000 0.105 0.058 1.024 0.005
1.6333 0.105 0.059 1.040 0.005
1.6667 0.105 0.060 1.055 0.005
1.7000 0.105 0.061 1.070 0.005
1.7333 0.105 0.063 1.084 0.005
1.7667 0.105 0.064 1.099 0.005
1.8000 0.105 0.065 1.113 0.005
1.8333 0.105 0.066 1.128 0.005
1.8667 0.105 0.068 1.142 0.005
1.9000 0.105 0.069 1.155 0.005
1.9333 0.105 0.070 1.169 0.005
1.9667 0.105 0.071 1.183 0.005
2.0000 0.105 0.073 1.196 0.005
2.0333 0.105 0.074 1.209 0.005
2.0667 0.105 0.075 1.222 0.005
2.1000 0.105 0.076 1.235 0.005
2.1333 0.105 0.077 1.248 0.005
2.1667 0.105 0.079 1.261 0.005
2.2000 0.105 0.080 1.273 0.005
2.2333 0.105 0.081 1.286 0.005
2.2667 0.105 0.082 1.298 0.005
2.3000 0.105 0.084 1.310 0.005
2.3333 0.106 0.085 1.322 0.005
2.3667 0.106 0.086 1.334 0.005
2.4000 0.106 0.087 1.346 0.005
2.4333 0.106 0.089 1.358 0.005
2.4667 0.106 0.090 1.370 0.005
2.5000 0.106 0.093 1.381 0.005
2.5333 0.106 0.097 1.393 0.005
2.5667 0.106 0.100 1.404 0.005
2.6000 0.106 0.104 1.415 0.005
2.6333 0.106 0.108 1.562 0.005
2.6667 0.106 0.111 1.822 0.005
2.7000 0.106 0.115 2.154 0.005
2.7333 0.106 0.118 2.546 0.005
2.7667 0.106 0.122 2.988 0.005
2.8000 0.106 0.125 3.477 0.005
2.8333 0.106 0.129 4.007 0.005
2.8667 0.106 0.132 4.575 0.005
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 9
2.9000 0.106 0.136 5.179 0.005
2.9333 0.106 0.140 5.817 0.005
2.9667 0.106 0.143 6.488 0.005
3.0000 0.106 0.147 7.188 0.005
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 10
Tank 1
Dimensions
Depth:8 ft.
Tank Type:Circular
Diameter:8 ft.
Length:470 ft.
Discharge Structure
Riser Height:7.5 ft.
Riser Diameter:18 in.
Orifice 1 Diameter:0.5 in.Elevation:0.5 ft.
Orifice 2 Diameter:1.125 in.Elevation:5.73 ft.
Orifice 3 Diameter:0.5 in.Elevation:6.5 ft.
Element Flows To:
Outlet 1 Outlet 2
Tank Hydraulic Table
Stage(feet)Area(ac.)Volume(ac-ft.)Discharge(cfs)Infilt(cfs)
0.0000 0.000 0.000 0.000 0.000
0.0889 0.018 0.001 0.000 0.000
0.1778 0.025 0.003 0.000 0.000
0.2667 0.031 0.005 0.000 0.000
0.3556 0.035 0.008 0.000 0.000
0.4444 0.039 0.011 0.000 0.000
0.5333 0.043 0.015 0.001 0.000
0.6222 0.046 0.019 0.002 0.000
0.7111 0.049 0.023 0.003 0.000
0.8000 0.051 0.028 0.003 0.000
0.8889 0.054 0.032 0.004 0.000
0.9778 0.056 0.037 0.004 0.000
1.0667 0.058 0.043 0.005 0.000
1.1556 0.060 0.048 0.005 0.000
1.2444 0.062 0.053 0.005 0.000
1.3333 0.064 0.059 0.006 0.000
1.4222 0.066 0.065 0.006 0.000
1.5111 0.067 0.071 0.006 0.000
1.6000 0.069 0.077 0.007 0.000
1.6889 0.070 0.083 0.007 0.000
1.7778 0.071 0.089 0.007 0.000
1.8667 0.073 0.096 0.007 0.000
1.9556 0.074 0.102 0.008 0.000
2.0444 0.075 0.109 0.008 0.000
2.1333 0.076 0.116 0.008 0.000
2.2222 0.077 0.122 0.008 0.000
2.3111 0.078 0.129 0.009 0.000
2.4000 0.079 0.136 0.009 0.000
2.4889 0.079 0.143 0.009 0.000
2.5778 0.080 0.151 0.009 0.000
2.6667 0.081 0.158 0.010 0.000
2.7556 0.082 0.165 0.010 0.000
2.8444 0.082 0.172 0.010 0.000
2.9333 0.083 0.180 0.010 0.000
3.0222 0.083 0.187 0.010 0.000
3.1111 0.084 0.195 0.011 0.000
3.2000 0.084 0.202 0.011 0.000
3.2889 0.084 0.210 0.011 0.000
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 11
3.3778 0.085 0.217 0.011 0.000
3.4667 0.085 0.225 0.011 0.000
3.5556 0.085 0.232 0.011 0.000
3.6444 0.086 0.240 0.012 0.000
3.7333 0.086 0.248 0.012 0.000
3.8222 0.086 0.255 0.012 0.000
3.9111 0.086 0.263 0.012 0.000
4.0000 0.086 0.271 0.012 0.000
4.0889 0.086 0.278 0.012 0.000
4.1778 0.086 0.286 0.013 0.000
4.2667 0.086 0.294 0.013 0.000
4.3556 0.086 0.301 0.013 0.000
4.4444 0.085 0.309 0.013 0.000
4.5333 0.085 0.317 0.013 0.000
4.6222 0.085 0.324 0.013 0.000
4.7111 0.084 0.332 0.013 0.000
4.8000 0.084 0.339 0.014 0.000
4.8889 0.084 0.347 0.014 0.000
4.9778 0.083 0.354 0.014 0.000
5.0667 0.083 0.362 0.014 0.000
5.1556 0.082 0.369 0.014 0.000
5.2444 0.082 0.376 0.014 0.000
5.3333 0.081 0.384 0.014 0.000
5.4222 0.080 0.391 0.015 0.000
5.5111 0.079 0.398 0.015 0.000
5.6000 0.079 0.405 0.015 0.000
5.6889 0.078 0.412 0.015 0.000
5.7778 0.077 0.419 0.023 0.000
5.8667 0.076 0.426 0.028 0.000
5.9556 0.075 0.433 0.032 0.000
6.0444 0.074 0.439 0.035 0.000
6.1333 0.073 0.446 0.037 0.000
6.2222 0.071 0.452 0.040 0.000
6.3111 0.070 0.458 0.042 0.000
6.4000 0.069 0.465 0.044 0.000
6.4889 0.067 0.471 0.046 0.000
6.5778 0.066 0.477 0.050 0.000
6.6667 0.064 0.482 0.052 0.000
6.7556 0.062 0.488 0.055 0.000
6.8444 0.060 0.494 0.057 0.000
6.9333 0.058 0.499 0.059 0.000
7.0222 0.056 0.504 0.061 0.000
7.1111 0.054 0.509 0.063 0.000
7.2000 0.051 0.514 0.064 0.000
7.2889 0.049 0.518 0.066 0.000
7.3778 0.046 0.522 0.068 0.000
7.4667 0.043 0.526 0.069 0.000
7.5556 0.039 0.530 0.279 0.000
7.6444 0.035 0.533 0.941 0.000
7.7333 0.031 0.536 1.830 0.000
7.8222 0.025 0.539 2.831 0.000
7.9111 0.018 0.541 3.830 0.000
8.0000 0.000 0.542 4.717 0.000
8.0889 0.000 0.000 5.410 0.000
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:05 AM Page 12
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.64
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.52
Total Impervious Area:1.123053
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.041538
5 year 0.063061
10 year 0.074565
25 year 0.086168
50 year 0.093021
100 year 0.098633
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.036604
5 year 0.049231
10 year 0.058611
25 year 0.071678
50 year 0.082332
100 year 0.093809
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.046 0.034
1950 0.067 0.059
1951 0.104 0.089
1952 0.032 0.028
1953 0.025 0.029
1954 0.037 0.034
1955 0.064 0.034
1956 0.051 0.061
1957 0.039 0.039
1958 0.045 0.033
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 13
1959 0.038 0.032
1960 0.064 0.040
1961 0.039 0.033
1962 0.022 0.027
1963 0.030 0.035
1964 0.039 0.030
1965 0.029 0.031
1966 0.029 0.034
1967 0.058 0.039
1968 0.038 0.040
1969 0.037 0.031
1970 0.029 0.030
1971 0.027 0.034
1972 0.075 0.074
1973 0.035 0.030
1974 0.037 0.036
1975 0.049 0.043
1976 0.035 0.030
1977 0.004 0.030
1978 0.028 0.037
1979 0.018 0.040
1980 0.051 0.059
1981 0.027 0.036
1982 0.043 0.055
1983 0.047 0.032
1984 0.030 0.032
1985 0.017 0.024
1986 0.080 0.043
1987 0.067 0.043
1988 0.026 0.025
1989 0.017 0.030
1990 0.095 0.056
1991 0.092 0.066
1992 0.030 0.031
1993 0.035 0.025
1994 0.010 0.023
1995 0.051 0.033
1996 0.096 0.082
1997 0.090 0.081
1998 0.019 0.037
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1038 0.0886
2 0.0964 0.0817
3 0.0945 0.0806
4 0.0924 0.0737
5 0.0896 0.0655
6 0.0803 0.0608
7 0.0746 0.0593
8 0.0671 0.0590
9 0.0670 0.0562
10 0.0640 0.0546
11 0.0639 0.0434
12 0.0575 0.0433
13 0.0515 0.0429
14 0.0512 0.0405
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 14
15 0.0512 0.0398
16 0.0488 0.0396
17 0.0467 0.0387
18 0.0460 0.0385
19 0.0453 0.0371
20 0.0434 0.0369
21 0.0395 0.0362
22 0.0388 0.0359
23 0.0387 0.0346
24 0.0380 0.0342
25 0.0378 0.0340
26 0.0374 0.0338
27 0.0372 0.0336
28 0.0367 0.0336
29 0.0354 0.0333
30 0.0352 0.0331
31 0.0345 0.0327
32 0.0323 0.0324
33 0.0302 0.0322
34 0.0302 0.0318
35 0.0299 0.0313
36 0.0289 0.0312
37 0.0289 0.0310
38 0.0285 0.0302
39 0.0285 0.0302
40 0.0275 0.0302
41 0.0271 0.0299
42 0.0260 0.0297
43 0.0250 0.0296
44 0.0224 0.0290
45 0.0186 0.0283
46 0.0180 0.0268
47 0.0168 0.0254
48 0.0166 0.0246
49 0.0102 0.0244
50 0.0036 0.0229
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 15
Duration Flows
The Facility PASSED
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0208 15726 10037 63 Pass
0.0215 14558 8515 58 Pass
0.0222 13571 7353 54 Pass
0.0230 12661 6495 51 Pass
0.0237 11900 5754 48 Pass
0.0244 11157 5116 45 Pass
0.0251 10449 4599 44 Pass
0.0259 9779 4157 42 Pass
0.0266 9151 3771 41 Pass
0.0273 8568 3471 40 Pass
0.0281 8061 3168 39 Pass
0.0288 7609 2887 37 Pass
0.0295 7219 2681 37 Pass
0.0303 6834 2502 36 Pass
0.0310 6476 2340 36 Pass
0.0317 6134 2190 35 Pass
0.0324 5813 2039 35 Pass
0.0332 5501 1899 34 Pass
0.0339 5191 1793 34 Pass
0.0346 4905 1695 34 Pass
0.0354 4677 1604 34 Pass
0.0361 4449 1528 34 Pass
0.0368 4234 1460 34 Pass
0.0376 4013 1413 35 Pass
0.0383 3850 1357 35 Pass
0.0390 3659 1317 35 Pass
0.0397 3498 1250 35 Pass
0.0405 3347 1171 34 Pass
0.0412 3198 1116 34 Pass
0.0419 3050 1073 35 Pass
0.0427 2917 1028 35 Pass
0.0434 2795 988 35 Pass
0.0441 2679 955 35 Pass
0.0449 2551 925 36 Pass
0.0456 2444 891 36 Pass
0.0463 2342 845 36 Pass
0.0470 2253 801 35 Pass
0.0478 2156 766 35 Pass
0.0485 2051 731 35 Pass
0.0492 1941 698 35 Pass
0.0500 1851 669 36 Pass
0.0507 1765 638 36 Pass
0.0514 1690 605 35 Pass
0.0522 1611 572 35 Pass
0.0529 1538 539 35 Pass
0.0536 1457 514 35 Pass
0.0543 1401 490 34 Pass
0.0551 1334 465 34 Pass
0.0558 1273 427 33 Pass
0.0565 1214 392 32 Pass
0.0573 1144 361 31 Pass
0.0580 1088 326 29 Pass
0.0587 1043 306 29 Pass
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 16
0.0594 994 281 28 Pass
0.0602 945 269 28 Pass
0.0609 899 255 28 Pass
0.0616 865 235 27 Pass
0.0624 834 223 26 Pass
0.0631 793 212 26 Pass
0.0638 758 198 26 Pass
0.0646 731 188 25 Pass
0.0653 708 172 24 Pass
0.0660 682 159 23 Pass
0.0667 655 148 22 Pass
0.0675 629 139 22 Pass
0.0682 605 129 21 Pass
0.0689 581 121 20 Pass
0.0697 564 108 19 Pass
0.0704 544 99 18 Pass
0.0711 525 93 17 Pass
0.0719 506 85 16 Pass
0.0726 476 79 16 Pass
0.0733 456 75 16 Pass
0.0740 428 65 15 Pass
0.0748 404 59 14 Pass
0.0755 391 53 13 Pass
0.0762 370 49 13 Pass
0.0770 342 45 13 Pass
0.0777 319 37 11 Pass
0.0784 295 32 10 Pass
0.0792 270 27 10 Pass
0.0799 251 20 7 Pass
0.0806 234 17 7 Pass
0.0813 218 13 5 Pass
0.0821 204 10 4 Pass
0.0828 190 10 5 Pass
0.0835 179 8 4 Pass
0.0843 171 7 4 Pass
0.0850 156 7 4 Pass
0.0857 142 4 2 Pass
0.0865 128 3 2 Pass
0.0872 114 1 0 Pass
0.0879 104 1 0 Pass
0.0886 93 0 0 Pass
0.0894 85 0 0 Pass
0.0901 79 0 0 Pass
0.0908 72 0 0 Pass
0.0916 63 0 0 Pass
0.0923 54 0 0 Pass
0.0930 48 0 0 Pass
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 17
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 18
Model Default Modifications
Total of 0 changes have been made.
PERLND Changes
No PERLND changes have been made.
IMPLND Changes
No IMPLND changes have been made.
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 19
Appendix
Predeveloped Schematic
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 20
Mitigated Schematic
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 21
Predeveloped UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 1998 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 20170918_ConstructionSizing.wdm
MESSU 25 Pre20170918_ConstructionSizing.MES
27 Pre20170918_ConstructionSizing.L61
28 Pre20170918_ConstructionSizing.L62
30 POC20170918_ConstructionSizing1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 10
COPY 501
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Basin 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
10 C, Forest, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
10 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
10 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 22
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
10 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
10 0 4.5 0.08 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
10 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
10 0.2 0.5 0.35 6 0.5 0.7
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
10 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
END PRINT-INFO
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
END IWAT-STATE1
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 23
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 10 1.64 COPY 501 12
PERLND 10 1.64 COPY 501 13
******Routing******
END SCHEMATIC
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 DIV PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 DIV IMPLND 1 999 EXTNL PREC
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 24
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 501 FLOW ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
END MASS-LINK
END RUN
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 25
Mitigated UCI File
RUN
GLOBAL
WWHM4 model simulation
START 1948 10 01 END 1998 09 30
RUN INTERP OUTPUT LEVEL 3 0
RESUME 0 RUN 1 UNIT SYSTEM 1
END GLOBAL
FILES
<File> <Un#> <-----------File Name------------------------------>***
<-ID-> ***
WDM 26 20170918_ConstructionSizing.wdm
MESSU 25 Mit20170918_ConstructionSizing.MES
27 Mit20170918_ConstructionSizing.L61
28 Mit20170918_ConstructionSizing.L62
30 POC20170918_ConstructionSizing1.dat
END FILES
OPN SEQUENCE
INGRP INDELT 00:15
PERLND 13
IMPLND 1
IMPLND 4
IMPLND 8
IMPLND 16
RCHRES 1
RCHRES 2
COPY 1
COPY 501
COPY 601
DISPLY 1
END INGRP
END OPN SEQUENCE
DISPLY
DISPLY-INFO1
# - #<----------Title----------->***TRAN PIVL DIG1 FIL1 PYR DIG2 FIL2 YRND
1 Tank 1 MAX 1 2 30 9
END DISPLY-INFO1
END DISPLY
COPY
TIMESERIES
# - # NPT NMN ***
1 1 1
501 1 1
601 1 1
END TIMESERIES
END COPY
GENER
OPCODE
# # OPCD ***
END OPCODE
PARM
# # K ***
END PARM
END GENER
PERLND
GEN-INFO
<PLS ><-------Name------->NBLKS Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
13 C, Pasture, Flat 1 1 1 1 27 0
END GEN-INFO
*** Section PWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC ***
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:46 AM Page 26
13 0 0 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ***************************** PIVL PYR
# - # ATMP SNOW PWAT SED PST PWG PQAL MSTL PEST NITR PHOS TRAC *********
13 0 0 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
PWAT-PARM1
<PLS > PWATER variable monthly parameter value flags ***
# - # CSNO RTOP UZFG VCS VUZ VNN VIFW VIRC VLE INFC HWT ***
13 0 0 0 0 0 0 0 0 0 0 0
END PWAT-PARM1
PWAT-PARM2
<PLS > PWATER input info: Part 2 ***
# - # ***FOREST LZSN INFILT LSUR SLSUR KVARY AGWRC
13 0 4.5 0.06 400 0.05 0.5 0.996
END PWAT-PARM2
PWAT-PARM3
<PLS > PWATER input info: Part 3 ***
# - # ***PETMAX PETMIN INFEXP INFILD DEEPFR BASETP AGWETP
13 0 0 2 2 0 0 0
END PWAT-PARM3
PWAT-PARM4
<PLS > PWATER input info: Part 4 ***
# - # CEPSC UZSN NSUR INTFW IRC LZETP ***
13 0.15 0.4 0.3 6 0.5 0.4
END PWAT-PARM4
PWAT-STATE1
<PLS > *** Initial conditions at start of simulation
ran from 1990 to end of 1992 (pat 1-11-95) RUN 21 ***
# - # *** CEPS SURS UZS IFWS LZS AGWS GWVS
13 0 0 0 0 2.5 1 0
END PWAT-STATE1
END PERLND
IMPLND
GEN-INFO
<PLS ><-------Name-------> Unit-systems Printer ***
# - # User t-series Engl Metr ***
in out ***
1 ROADS/FLAT 1 1 1 27 0
4 ROOF TOPS/FLAT 1 1 1 27 0
8 SIDEWALKS/FLAT 1 1 1 27 0
16 Porous Pavement 1 1 1 27 0
END GEN-INFO
*** Section IWATER***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # ATMP SNOW IWAT SLD IWG IQAL ***
1 0 0 1 0 0 0
4 0 0 1 0 0 0
8 0 0 1 0 0 0
16 0 0 1 0 0 0
END ACTIVITY
PRINT-INFO
<ILS > ******** Print-flags ******** PIVL PYR
# - # ATMP SNOW IWAT SLD IWG IQAL *********
1 0 0 4 0 0 0 1 9
4 0 0 4 0 0 0 1 9
8 0 0 4 0 0 0 1 9
16 0 0 4 0 0 0 1 9
END PRINT-INFO
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 27
IWAT-PARM1
<PLS > IWATER variable monthly parameter value flags ***
# - # CSNO RTOP VRS VNN RTLI ***
1 0 0 0 0 0
4 0 0 0 0 0
8 0 0 0 0 0
16 0 0 0 0 0
END IWAT-PARM1
IWAT-PARM2
<PLS > IWATER input info: Part 2 ***
# - # *** LSUR SLSUR NSUR RETSC
1 400 0.01 0.1 0.1
4 400 0.01 0.1 0.1
8 400 0.01 0.1 0.1
16 400 0.01 0.1 0.1
END IWAT-PARM2
IWAT-PARM3
<PLS > IWATER input info: Part 3 ***
# - # ***PETMAX PETMIN
1 0 0
4 0 0
8 0 0
16 0 0
END IWAT-PARM3
IWAT-STATE1
<PLS > *** Initial conditions at start of simulation
# - # *** RETS SURS
1 0 0
4 0 0
8 0 0
16 0 0
END IWAT-STATE1
END IMPLND
SCHEMATIC
<-Source-> <--Area--> <-Target-> MBLK ***
<Name> # <-factor-> <Name> # Tbl# ***
Basin 1***
PERLND 13 0.29 RCHRES 2 2
PERLND 13 0.29 RCHRES 2 3
IMPLND 1 0.35 RCHRES 2 5
IMPLND 4 0.39 RCHRES 2 5
IMPLND 8 0.21 RCHRES 2 5
IMPLND 16 0.1031 RCHRES 1 5
Bypass***
PERLND 13 0.23 COPY 501 12
PERLND 13 0.23 COPY 601 12
PERLND 13 0.23 COPY 501 13
PERLND 13 0.23 COPY 601 13
IMPLND 1 0.03 COPY 501 15
IMPLND 1 0.03 COPY 601 15
IMPLND 8 0.04 COPY 501 15
IMPLND 8 0.04 COPY 601 15
******Routing******
PERLND 13 0.29 COPY 1 12
IMPLND 1 0.35 COPY 1 15
IMPLND 4 0.39 COPY 1 15
IMPLND 8 0.21 COPY 1 15
PERLND 13 0.29 COPY 1 13
RCHRES 1 1 RCHRES 2 7
RCHRES 1 COPY 1 17
RCHRES 2 1 COPY 501 16
END SCHEMATIC
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 28
NETWORK
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
COPY 501 OUTPUT MEAN 1 1 48.4 DISPLY 1 INPUT TIMSER 1
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # #<-factor->strg <Name> # # <Name> # # ***
END NETWORK
RCHRES
GEN-INFO
RCHRES Name Nexits Unit Systems Printer ***
# - #<------------------><---> User T-series Engl Metr LKFG ***
in out ***
1 Porous Pavement -006 2 1 1 1 28 0 1
2 Tank 1 1 1 1 1 28 0 1
END GEN-INFO
*** Section RCHRES***
ACTIVITY
<PLS > ************* Active Sections *****************************
# - # HYFG ADFG CNFG HTFG SDFG GQFG OXFG NUFG PKFG PHFG ***
1 1 0 0 0 0 0 0 0 0 0
2 1 0 0 0 0 0 0 0 0 0
END ACTIVITY
PRINT-INFO
<PLS > ***************** Print-flags ******************* PIVL PYR
# - # HYDR ADCA CONS HEAT SED GQL OXRX NUTR PLNK PHCB PIVL PYR *********
1 4 0 0 0 0 0 0 0 0 0 1 9
2 4 0 0 0 0 0 0 0 0 0 1 9
END PRINT-INFO
HYDR-PARM1
RCHRES Flags for each HYDR Section ***
# - # VC A1 A2 A3 ODFVFG for each *** ODGTFG for each FUNCT for each
FG FG FG FG possible exit *** possible exit possible exit
* * * * * * * * * * * * * * ***
1 0 1 0 0 4 5 0 0 0 0 0 0 0 0 2 2 2 2 2
2 0 1 0 0 4 0 0 0 0 0 0 0 0 0 2 2 2 2 2
END HYDR-PARM1
HYDR-PARM2
# - # FTABNO LEN DELTH STCOR KS DB50 ***
<------><--------><--------><--------><--------><--------><--------> ***
1 1 0.01 0.0 0.0 0.5 0.0
2 2 0.09 0.0 0.0 0.5 0.0
END HYDR-PARM2
HYDR-INIT
RCHRES Initial conditions for each HYDR section ***
# - # *** VOL Initial value of COLIND Initial value of OUTDGT
*** ac-ft for each possible exit for each possible exit
<------><--------> <---><---><---><---><---> *** <---><---><---><---><--->
1 0 4.0 5.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
2 0 4.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
END HYDR-INIT
END RCHRES
SPEC-ACTIONS
END SPEC-ACTIONS
FTABLES
FTABLE 1
91 5
Depth Area Volume Outflow1 Outflow2 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (cfs) (ft/sec) (Minutes)***
0.000000 0.103053 0.000000 0.000000 0.000000
0.033333 0.103053 0.000902 0.000000 0.005196
0.066667 0.103053 0.001803 0.000000 0.005196
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 29
0.100000 0.103053 0.002705 0.000000 0.005196
0.133333 0.103053 0.003607 0.000000 0.005196
0.166667 0.103053 0.004509 0.000000 0.005196
0.200000 0.103053 0.005410 0.000000 0.005196
0.233333 0.103053 0.006312 0.000000 0.005196
0.266667 0.103053 0.007214 0.000000 0.005196
0.300000 0.103053 0.008115 0.000000 0.005196
0.333333 0.103053 0.009017 0.000000 0.005196
0.366667 0.103053 0.009919 0.000000 0.005196
0.400000 0.103053 0.010821 0.000000 0.005196
0.433333 0.103053 0.011722 0.000000 0.005196
0.466667 0.103053 0.012624 0.000000 0.005196
0.500000 0.103053 0.013526 0.000000 0.005196
0.533333 0.103053 0.014427 0.178361 0.005196
0.566667 0.103053 0.015329 0.252241 0.005196
0.600000 0.103053 0.016231 0.308931 0.005196
0.633333 0.103053 0.017133 0.356723 0.005196
0.666667 0.103053 0.018034 0.398828 0.005196
0.700000 0.103053 0.018936 0.436894 0.005196
0.733333 0.103053 0.019838 0.471900 0.005196
0.766667 0.103053 0.020739 0.504482 0.005196
0.800000 0.103053 0.021641 0.535084 0.005196
0.833333 0.103053 0.022543 0.564028 0.005196
0.866667 0.103053 0.023445 0.591557 0.005196
0.900000 0.103053 0.024346 0.617862 0.005196
0.933333 0.103053 0.025248 0.643091 0.005196
0.966667 0.103053 0.026150 0.667367 0.005196
1.000000 0.103053 0.027051 0.690790 0.005196
1.033333 0.103053 0.027953 0.713445 0.005196
1.066667 0.103053 0.028855 0.735402 0.005196
1.100000 0.103053 0.029757 0.756723 0.005196
1.133333 0.103053 0.030658 0.777459 0.005196
1.166667 0.103053 0.031560 0.797656 0.005196
1.200000 0.103053 0.032462 0.817354 0.005196
1.233333 0.103053 0.033363 0.836589 0.005196
1.266667 0.103053 0.034265 0.855391 0.005196
1.300000 0.103053 0.035167 0.873788 0.005196
1.333333 0.103053 0.036069 0.891806 0.005196
1.366667 0.103053 0.036970 0.909468 0.005196
1.400000 0.103053 0.037872 0.926792 0.005196
1.433333 0.103053 0.038774 0.943799 0.005196
1.466667 0.103053 0.039676 0.960505 0.005196
1.500000 0.103053 0.040577 0.976925 0.005196
1.533333 0.103053 0.041479 0.993074 0.005196
1.566667 0.103053 0.042381 1.008964 0.005196
1.600000 0.103053 0.043282 1.024608 0.005196
1.633333 0.103053 0.044184 1.040016 0.005196
1.666667 0.103053 0.045086 1.055200 0.005196
1.700000 0.103053 0.045988 1.070168 0.005196
1.733333 0.103053 0.046889 1.084929 0.005196
1.766667 0.103053 0.047791 1.099493 0.005196
1.800000 0.103053 0.048693 1.113866 0.005196
1.833333 0.103053 0.049594 1.128056 0.005196
1.866667 0.103053 0.050496 1.142069 0.005196
1.900000 0.103053 0.051398 1.155913 0.005196
1.933333 0.103053 0.052300 1.169593 0.005196
1.966667 0.103053 0.053201 1.183115 0.005196
2.000000 0.103053 0.054103 1.196484 0.005196
2.033333 0.103053 0.055005 1.209705 0.005196
2.066667 0.103053 0.055906 1.222783 0.005196
2.100000 0.103053 0.056808 1.235723 0.005196
2.133333 0.103053 0.057710 1.248529 0.005196
2.166667 0.103053 0.058612 1.261205 0.005196
2.200000 0.103053 0.059513 1.273754 0.005196
2.233333 0.103053 0.060415 1.286182 0.005196
2.266667 0.103053 0.061317 1.298490 0.005196
2.300000 0.103053 0.062218 1.310682 0.005196
2.333333 0.103053 0.063120 1.322763 0.005196
2.366667 0.103053 0.064022 1.334734 0.005196
2.400000 0.103053 0.064924 1.346598 0.005196
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 30
2.433333 0.103053 0.065825 1.358359 0.005196
2.466667 0.103053 0.066727 1.370019 0.005196
2.500000 0.103053 0.070162 1.381581 0.005196
2.533333 0.103053 0.073597 1.393046 0.005196
2.566667 0.103053 0.077032 1.404418 0.005196
2.600000 0.103053 0.080467 1.415699 0.005196
2.633333 0.103053 0.083903 1.562671 0.005196
2.666667 0.103053 0.087338 1.822040 0.005196
2.700000 0.103053 0.090773 2.154550 0.005196
2.733333 0.103053 0.094208 2.546193 0.005196
2.766667 0.103053 0.097643 2.988876 0.005196
2.800000 0.103053 0.101078 3.477137 0.005196
2.833333 0.103053 0.104513 4.006966 0.005196
2.866667 0.103053 0.107948 4.575259 0.005196
2.900000 0.103053 0.111383 5.179517 0.005196
2.933333 0.103053 0.114819 5.817673 0.005196
2.966667 0.103053 0.118254 6.487982 0.005196
3.000000 0.103053 0.121689 7.188940 0.005196
END FTABLE 1
FTABLE 2
91 4
Depth Area Volume Outflow1 Velocity Travel Time***
(ft) (acres) (acre-ft) (cfs) (ft/sec) (Minutes)***
0.000000 0.000000 0.000000 0.000000
0.088889 0.018096 0.001075 0.000000
0.177778 0.025447 0.003030 0.000000
0.266667 0.030989 0.005547 0.000000
0.355556 0.035577 0.008511 0.000000
0.444444 0.039544 0.011853 0.000000
0.533333 0.043063 0.015528 0.001239
0.622222 0.046235 0.019499 0.002372
0.711111 0.049129 0.023739 0.003117
0.800000 0.051791 0.028226 0.003716
0.888889 0.054254 0.032941 0.004231
0.977778 0.056545 0.037866 0.004689
1.066667 0.058685 0.042989 0.005107
1.155556 0.060688 0.048295 0.005493
1.244444 0.062569 0.053774 0.005853
1.333333 0.064337 0.059415 0.006193
1.422222 0.066003 0.065209 0.006515
1.511111 0.067573 0.071146 0.006822
1.600000 0.069054 0.077219 0.007115
1.688889 0.070452 0.083420 0.007397
1.777778 0.071771 0.089741 0.007669
1.866667 0.073017 0.096177 0.007931
1.955556 0.074191 0.102720 0.008185
2.044444 0.075299 0.109365 0.008431
2.133333 0.076342 0.116105 0.008670
2.222222 0.077324 0.122935 0.008903
2.311111 0.078246 0.129849 0.009130
2.400000 0.079111 0.136844 0.009351
2.488889 0.079921 0.143912 0.009568
2.577778 0.080677 0.151050 0.009779
2.666667 0.081381 0.158253 0.009986
2.755556 0.082034 0.165516 0.010189
2.844444 0.082637 0.172835 0.010388
2.933333 0.083192 0.180206 0.010583
3.022222 0.083699 0.187624 0.010774
3.111111 0.084159 0.195085 0.010963
3.200000 0.084574 0.202584 0.011148
3.288889 0.084943 0.210118 0.011330
3.377778 0.085267 0.217684 0.011509
3.466667 0.085547 0.225276 0.011685
3.555556 0.085783 0.232891 0.011859
3.644444 0.085976 0.240525 0.012030
3.733333 0.086126 0.248174 0.012199
3.822222 0.086232 0.255835 0.012366
3.911111 0.086296 0.263503 0.012530
4.000000 0.086318 0.271175 0.012692
4.088889 0.086296 0.278847 0.012852
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 31
4.177778 0.086232 0.286515 0.013010
4.266667 0.086126 0.294176 0.013167
4.355556 0.085976 0.301825 0.013321
4.444444 0.085783 0.309459 0.013474
4.533333 0.085547 0.317074 0.013625
4.622222 0.085267 0.324667 0.013774
4.711111 0.084943 0.332232 0.013922
4.800000 0.084574 0.339766 0.014068
4.888889 0.084159 0.347266 0.014213
4.977778 0.083699 0.354726 0.014356
5.066667 0.083192 0.362144 0.014498
5.155556 0.082637 0.369515 0.014638
5.244444 0.082034 0.376834 0.014777
5.333333 0.081381 0.384097 0.014915
5.422222 0.080677 0.391300 0.015051
5.511111 0.079921 0.398438 0.015187
5.600000 0.079111 0.405507 0.015321
5.688889 0.078246 0.412501 0.015454
5.777778 0.077324 0.419415 0.023093
5.866667 0.076342 0.426246 0.028413
5.955556 0.075299 0.432986 0.032157
6.044444 0.074191 0.439630 0.035234
6.133333 0.073017 0.446173 0.037914
6.222222 0.071771 0.452609 0.040325
6.311111 0.070452 0.458930 0.042536
6.400000 0.069054 0.465131 0.044591
6.488889 0.067573 0.471204 0.046522
6.577778 0.066003 0.477142 0.050240
6.666667 0.064337 0.482935 0.052856
6.755556 0.062569 0.488576 0.055179
6.844444 0.060688 0.494055 0.057327
6.933333 0.058685 0.499362 0.059349
7.022222 0.056545 0.504484 0.061271
7.111111 0.054254 0.509410 0.063110
7.200000 0.051791 0.514124 0.064878
7.288889 0.049129 0.518611 0.066584
7.377778 0.046235 0.522851 0.068235
7.466667 0.043063 0.526822 0.069837
7.555556 0.039544 0.530497 0.279667
7.644444 0.035577 0.533839 0.941903
7.733333 0.030989 0.536803 1.830642
7.822222 0.025447 0.539321 2.831222
7.911111 0.018096 0.541275 3.830165
8.000000 0.000000 0.542350 4.717726
END FTABLE 2
END FTABLES
EXT SOURCES
<-Volume-> <Member> SsysSgap<--Mult-->Tran <-Target vols> <-Grp> <-Member-> ***
<Name> # <Name> # tem strg<-factor->strg <Name> # # <Name> # # ***
WDM 2 PREC ENGL 1 DIV PERLND 1 999 EXTNL PREC
WDM 2 PREC ENGL 1 DIV IMPLND 1 999 EXTNL PREC
WDM 1 EVAP ENGL 0.76 PERLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 IMPLND 1 999 EXTNL PETINP
WDM 1 EVAP ENGL 0.76 RCHRES 1 EXTNL POTEV
END EXT SOURCES
EXT TARGETS
<-Volume-> <-Grp> <-Member-><--Mult-->Tran <-Volume-> <Member> Tsys Tgap Amd ***
<Name> # <Name> # #<-factor->strg <Name> # <Name> tem strg strg***
COPY 1 OUTPUT MEAN 1 1 48.4 WDM 701 FLOW ENGL REPL
COPY 501 OUTPUT MEAN 1 1 48.4 WDM 801 FLOW ENGL REPL
COPY 601 OUTPUT MEAN 1 1 48.4 WDM 901 FLOW ENGL REPL
RCHRES 2 HYDR RO 1 1 1 WDM 1000 FLOW ENGL REPL
RCHRES 2 HYDR STAGE 1 1 1 WDM 1001 STAG ENGL REPL
END EXT TARGETS
MASS-LINK
<Volume> <-Grp> <-Member-><--Mult--> <Target> <-Grp> <-Member->***
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 32
<Name> <Name> # #<-factor-> <Name> <Name> # #***
MASS-LINK 2
PERLND PWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 2
MASS-LINK 3
PERLND PWATER IFWO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 3
MASS-LINK 5
IMPLND IWATER SURO 0.083333 RCHRES INFLOW IVOL
END MASS-LINK 5
MASS-LINK 7
RCHRES OFLOW OVOL 1 RCHRES INFLOW IVOL
END MASS-LINK 7
MASS-LINK 12
PERLND PWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 12
MASS-LINK 13
PERLND PWATER IFWO 0.083333 COPY INPUT MEAN
END MASS-LINK 13
MASS-LINK 15
IMPLND IWATER SURO 0.083333 COPY INPUT MEAN
END MASS-LINK 15
MASS-LINK 16
RCHRES ROFLOW COPY INPUT MEAN
END MASS-LINK 16
MASS-LINK 17
RCHRES OFLOW OVOL 1 COPY INPUT MEAN
END MASS-LINK 17
END MASS-LINK
END RUN
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 33
Predeveloped HSPF Message File
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 34
Mitigated HSPF Message File
DRAFT20170918_ConstructionSizing 9/20/2017 8:30:47 AM Page 35
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
Technical Information Report 4-5 LDC Job No. 16-137
WWHM4
PROJECT REPORT
___________________________________________________________________
Project Name: 20170920_BypassFlow
Site Name:
Site Address:
City :
Report Date: 9/20/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 1998/09/30
Precip Scale: 1.00
Version Date: 2016/11/23
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Forest, Flat .3
Pervious Total 0.3
Impervious Land Use acre
Impervious Total 0
Basin Total 0.3
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
Technical Information Report 4-6 LDC Job No. 16-137
C, Pasture, Flat .23
Pervious Total 0.23
Impervious Land Use acre
ROADS FLAT 0.03
SIDEWALKS FLAT 0.04
Impervious Total 0.07
Basin Total 0.3
___________________________________________________________________
ANALYSIS RESULTS
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.3
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.23
Total Impervious Area:0.07
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.0075
5 year 0.0115
10 year 0.0136
25 year 0.0157
50 year 0.0170
100 year 0.0180
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 Year 0.0249
5 Year 0.0311
10 Year 0.0353
25 Year 0.0406
50 Year 0.0446
100 Year 0.0486
__________________________________________________________________
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.008 0.004
1950 0.012 0.005
1951 0.019 0.007
1952 0.006 0.003
1953 0.005 0.004
1954 0.007 0.004
1955 0.012 0.005
1956 0.009 0.005
Technical Information Report 4-7 LDC Job No. 16-137
1957 0.007 0.004
1958 0.008 0.005
1959 0.007 0.004
1960 0.012 0.006
1961 0.007 0.004
1962 0.004 0.003
1963 0.006 0.004
1964 0.007 0.004
1965 0.005 0.004
1966 0.005 0.004
1967 0.011 0.005
1968 0.007 0.004
1969 0.007 0.004
1970 0.005 0.004
1971 0.005 0.004
1972 0.014 0.006
1973 0.006 0.004
1974 0.007 0.005
1975 0.009 0.004
1976 0.006 0.004
1977 0.001 0.002
1978 0.005 0.004
1979 0.003 0.003
1980 0.009 0.006
1981 0.005 0.004
1982 0.008 0.005
1983 0.009 0.005
1984 0.005 0.003
1985 0.003 0.003
1986 0.015 0.005
1987 0.012 0.005
1988 0.005 0.003
1989 0.003 0.003
1990 0.017 0.006
1991 0.017 0.006
1992 0.006 0.005
1993 0.006 0.004
1994 0.002 0.003
1995 0.009 0.005
1996 0.018 0.007
1997 0.016 0.007
1998 0.003 0.003
___________________________________________________________________
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0190 0.0073
2 0.0176 0.0069
3 0.0173 0.0067
4 0.0169 0.0062
5 0.0164 0.0061
6 0.0147 0.0060
7 0.0136 0.0060
8 0.0123 0.0059
9 0.0123 0.0055
10 0.0117 0.0054
11 0.0117 0.0053
Technical Information Report 4-8 LDC Job No. 16-137
12 0.0105 0.0051
13 0.0094 0.0051
14 0.0094 0.0049
15 0.0094 0.0047
16 0.0089 0.0046
17 0.0086 0.0046
18 0.0084 0.0046
19 0.0083 0.0046
20 0.0079 0.0045
21 0.0072 0.0045
22 0.0071 0.0045
23 0.0071 0.0044
24 0.0070 0.0044
25 0.0069 0.0043
26 0.0068 0.0043
27 0.0068 0.0043
28 0.0067 0.0043
29 0.0065 0.0042
30 0.0064 0.0042
31 0.0063 0.0040
32 0.0059 0.0039
33 0.0055 0.0039
34 0.0055 0.0039
35 0.0055 0.0038
36 0.0053 0.0038
37 0.0053 0.0038
38 0.0052 0.0037
39 0.0052 0.0037
40 0.0050 0.0036
41 0.0050 0.0035
42 0.0047 0.0034
43 0.0046 0.0034
44 0.0041 0.0032
45 0.0034 0.0030
46 0.0033 0.0029
47 0.0031 0.0028
48 0.0030 0.0026
49 0.0019 0.0025
50 0.0007 0.0024
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind.
The entire risk regarding the performance and results of this program is assumed by End User.
Clear Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties,
either expressed or implied, including but not limited to implied warranties of program and
accompanying documentation. In no event shall Clear Creek Solutions Inc. be liable for any
damages whatsoever (including without limitation to damages for loss of business profits, loss of
business information, business interruption, and the like) arising out of the use of, or
inability to use this program even if Clear Creek Solutions Inc. or their authorized
representatives have been advised of the possibility of such damages. Software Copyright © by :
Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
Technical Information Report 4-9 LDC Job No. 16-137
4.2 Water Quality Treatment
Per the 2017 City of Renton SWDM section 1.2.8.1 A, the required treatment for the
proposed commercial project is Enhanced Basic Treatment. The treatment
performance goal for Enhanced Basic WQ menu is 50% reduction of total zinc and 80%
removal of total suspended solids (TSS) for a typical rainfall year, assuming typical
pollutant concentrations in urban runoff.
The proposed enhanced treatment facility is a Filterra Bioretention Systems as
approved by the City of Renton Public Works Department. The Washington State
Department of Ecology has approved the Filterra Bioretention Systems for General Use
Level Designation for Total Suspended Solids, oil and grease, and enhanced dissolved
metals treatment.
The proposed enhanced treatment facility is a Filterra Bioretention Systems an
approved method by 2017 RSWDM section 14-A. The Filterra unit has been sized for
enhanced-basic treatment using a filter hydraulic conductivity of 24.82 inches/hour
using the sand filter module in the latest version of WWHM or other Ecology-approved
continuous runoff model. The model proves that the Filterra unit chosen is capable of
filtering 91 percent of the influent runoff file. Further analysis and design calculations
are included in the following pages.
Water Quality Tributary Basin (see Figure 4.3):
C, Lawn, Flat 0.14 Acres
Roads/Flat 0.42 Acres
Sidewalks/Flat 0.10 Acres
Total 0.66 Acres
Peak Flow Rates (701)
100-year = 0.54 cfs (Filterra 6” max=0.6cfs)
410
390400390
4 0 0
400410410410
4.3FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F4.2
DRAWING BY: D.WESTLEYDATE: 9-06-2017SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: D.WESTLEY
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137DevelopedHydrologyMap.mxd | MOD: 9/06/2017 | TPAVICINITY MAP
RENTON SPECIAL CARE COMMUNITY, LLCRENTON SPECIAL CARE COMMUNITYDEVELOPED WATER QUALITY BASIN MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893q
Scale in Feet
0 40 80
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Parcel Boundary PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT
Watercourse 108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYDEVELOPED WQ BASIN0.66 AC
DEVELOPED BASIN AREAS
DEVELOPED BASIN A TOTAL
TOTAL =0.66 ACPERVIOUS (lawn)0.14 ACROADS0.42 AC
WATER QUALITY BYPASS BASIN TOTAL = 0.30 AC WATER QUALITY MITIGATION TRADE*
NON-TARGET EXISTING PAVEMENT TO WATER QUALITYFACILITY=3,500 SF
ROW PAVEMENT WATER QUALITYBYPASS =200 SF
PRIVATE DRIVE WATER QUALITY BYPASS =1,800 SF
WATER QUALITY BYPASS
TOTAL =0.30 ACPERVIOUS0.23 ACIMPERVIOUS0.07 AC
NON-TARGET IMPERVIOUS SURFACEEXISTING PAVEMENT 3,500 SF
TARGET SURFACE AREA BYPASS
TOTAL =3,500 SFPRIVATE DRIVE PAVEMENT 1,800 SF
ROW PAVEMENT 200 SF
MITIGATION TRADE NET
TOTAL =0 SFTARGET (BYPASS)- 3,500 SFNON-TARGET (TO WQ)3,500 SF
* ALL AREAS NOTED ARE PGIS.CALCULATIONS REFLECT PGIS TRADE CALCULATIONS.
WATER QUALITY BYPASS = 1,500 SF
ROW PAVEMENT 1,500 SFGRIND AND OVERLAY
SIDEWALKS 0.10 AC
Technical Information Report 4-11 LDC Job No. 16-137
4.3 Flow Control BMPs – Low Impact Development
Flow Control BMPs, also known as Low Impact Development (LID) techniques, must be
applied to the site design in accordance with the requirements specified in the 2017
City of Renton SWDM section C.1.3.2 Large Lot BMP Requirements. Evaluation for the
feasibility and applicability of prescribed flow control BMPs is provided below:
1. Full Dispersion: Not applicable. The proposed commercial development does
not provide sufficient native vegetation to meet the minimum flow path
requirements for full dispersion.
2. Full Infiltration of Roof Runoff: Not feasible. Full infiltration is infeasible and
not required as the minimum design requirements (below) cannot be met:
“Existing soils must be coarse sands or cobbles or medium sands” -
onsite glacial till soils do not exhibit infiltration characteristics that will
allow full infiltration BMPs to “fully and reliably” infiltrate runoff into
the ground.
3. Flow Control BMP Feasibility List: The following BMPs have been fully
evaluated for feasibility and applied to the site where determined feasible as
required.
Full Infiltration: Not feasible. Full infiltration is infeasible and not
required as the minimum design requirements (below) cannot be met:
Existing site soils must be coarse sands or cobbles or medium
sands - onsite glacial till soils do not exhibit infiltration
characteristics that will allow full infiltration BMPs to “fully and
reliably” infiltrate runoff into the ground.
Limited Infiltration: Not feasible. Limited infiltration is infeasible as the
following minimum design requirements cannot be met:
Existing site soils may be fine sands, loamy sands, sandy loams, or
loams – present onsite glacial till soils are not suitable for limited
infiltration systems.
Bioretention: Not feasible. Bioretention is infeasible as the following
criteria can be cited as reasons for a finding of infeasibility without
further justification:
Technical Information Report 4-12 LDC Job No. 16-137
21.) Where the field testing indicates potential bio retention sites
have a measured native soil saturated hydraulic conductivity less
than 0.30 inches per hour – According to Infiltration Testing
Letter Report, performed by Michael Place, PE dated January 6th,
2017, native till soils contain a measured native soil saturated
hydraulic conductivity of 0.10 to 0.20 inches per hour.
Permeable Pavement: Feasible. Permeable pavement is feasible with
the use of underdrains in location of minimal infiltration only as
specified in section C.2.7.1 and C.2.47 see page DT-01 for detail.
Permeable pavement is proposed in all parking stall locations totaling
4,556 square feet. 2,400 square feet of pollution generating impervious
run-on is contributing to the permeable pavement area. Permeable
pavement is not extended to sidewalks due to insufficient infiltration
rates across the southern portion of the site. See Figure 4.4 or the
Geotech report by Intertek PSI dated January 6th, 2017. The test pit
location 1-3 show infiltration rates at 0.05in/hr to 0.03in/hr where a
system of underdrains would still provide a passing model. Test pit 4
however, only 0.02in/hr was recorded which is even lower than the
current infiltration rates to the north. Currently the permeable
pavement is being utilized to meet the LID requirements but no
modeling credits are being utilized. See email attached from Michael
Place, PE the geotechnical Engineer from Intertek-PSI as he describes
the onsite conditions and the infeasibility of infiltration and permeable
pavement onsite.
Summary: The total targeted impervious cover applied to permeable
pavement BMP is 6,706 square feet.
4. Basic Dispersion: Not feasible. The proposed architectural site plan does not
provide sufficient vegetated pervious surfaces to meet the minimum design
requirements for basic dispersion concerning the minimum vegetated flowpath
lengths.
410
390400390
4 0 0
400410410410
4.4FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F4.2
DRAWING BY: D.WESTLEYDATE: 9-06-2017SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: D.WESTLEY
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137DevelopedHydrologyMap.mxd | MOD: 9/06/2017 | TPAVICINITY MAP
RENTON SPECIAL CARE COMMUNITY, LLCRENTON SPECIAL CARE COMMUNITYINFILTRATION MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893q
Scale in Feet
0 40 80
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Parcel Boundary PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT
Watercourse 108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYTEST PIT-1 0.05 IN/HR
TEST PIT-2 0.03 IN/HR
TEST PIT-30.05 IN/HR
TEST PIT-40.02 IN/HR
1
Amanda Lauck
From:Michael Place <michael.place@psiusa.com>
Sent:Wednesday, February 07, 2018 9:24 AM
To:Amanda Lauck
Cc:Mark Villwock; Tom Abbott Sr.
Subject:RE: Renton Memory Care PSI Report #07121316
Amanda,
Based on the results in our geotechnical investigations and infiltration testing the field measured permeability of the
onsite till soils ranged from 0.10 to 0.22 inches per hour (in/hr). This is below the City of Renton specified required
minimum for measured infiltration rate of 0.3 in/hr. Calculated design rates for the site ranged from 0.02 to 0.05
in/hr. When water intersects these till soils it will have a tenancy to migrate laterally rather than permit any significant
infiltration. Such lateral migration will simply force water entering the soils to migrate towards foundation and wall
drains within the courtyard area, yielding no significant infiltration. As a result, in PSI’s opinion, the use of permeable
pavements in the proposed courtyard area will provide no increased benefit to the management of stormwater on the
site.
Regards,
Michael S. Place, PE
Regional Engineer/Principal Consultant
Geotechnical Engineering
Intertek‐PSI
Licensed in WA, OR, ID, UT & NV
Direct (425) 409‐2505
Mobile (253) 255‐7805
Office (425) 409‐2504
Email michael.place@psiusa.com
www.intertek.com/building
Intertek‐PSI, 20508 56th Avenue West, Suite A, Lynnwood, WA 98036
Regards,
From: Amanda Lauck [mailto:alauck@ldccorp.com]
Sent: Wednesday, February 7, 2018 7:09 AM
To: Michael Place <michael.place@psiusa.com>
Cc: Mark Villwock <mvillwock@ldccorp.com>; Tom Abbott Sr. <tabbottsr@ldccorp.com>
Subject: RE: Renton Memory Care PSI Report #07121316
Hello Michael,
Technical Information Report 4-13 LDC Job No. 16-137
5. BMP Application Rate: For projects that will result in an impervious surface
coverage greater than 65% on the buildable portion of the site/lot, on-site
BMPs must be applied to 20% of the target impervious surfaces or to an
impervious area equal to at least 10% of the site/lot, whichever is less.
10% of Lot = 0.1 x 65,715 = 6,571 SF
20% of Target Impervious Surface = 0.2 x 47,720 = 9,544 SF
Summary: On-site BMPs must be applied to at least 6,571 SF of Target
Impervious Surfaces
Technical Information Report 4-14 LDC Job No. 16-137
Permeable Pavement Design:
The proposed permeable pavement flow control BMP has been designed in accordance
with the 2017 City of Renton SWDM section C.2.7.1 and C.2.47 see page DT-01 for
detail. The design is based on soils information presented in Infiltration Testing Letter
Report prepared by PSI on January 6th, 2017. Underdrains will be used to discharge all
runoff that will not infiltrate into the native soils. Permeable pavement is not
extended to sidewalks due to concerns regarding insufficient infiltration rates across
the southern portion of the site. The test pit location 1-3 show infiltration rates at
0.05in/hr to 0.03in/hr where a system of underdrains would still provide a passing
model. Test pit 4 however, only 0.02in/hr was recorded which is even lower than the
current infiltration rates to the north. Currently the permeable pavement is being
utilized to meet the LID requirements but no modeling credits are being utilized.
Preliminary TIR 5-1 LDC Job No. 16-137
5.0 CONVEYANCE SYSTEM ANALYSIS AND DESIGN
The conveyance system onsite consists of a series of catch basins, area drains,
and detention pipe that conveys stormwater across the site. Backwater
conveyance analysis and design was conducted per section 3.3.3 of the 2017
City of Renton Surface Water Design Manual. Per section 3.3.3 (1 and 2) a
conveyance basin map was created that breaks down impervious and pervious
area within the basins, see Figure 5.1. Peak flows for the 100-year storm were
evaluated using WWHM given the basin parameters using a 15-minuite time step
per section 3.3.3 (3). Stormshed 3G was then used to evaluate the system for
compliance, the HGL analysis is provided on the following pages. Based on the
Stormshed 3G analysis the system is adequately sized.
Appended on: Wednesday, February 14, 2018 1:57:58 PM
ROUTEHYD [] THRU [Renton Memory] USING [100 year] AND [] NOTZERO
RELATIVE Fixed Flow
Gravity Analysis using fixed flowrates
Reach
ID
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s) CFlow
pipe15 0.017 6.8845 0.0025 0.0367 12 in
Diam 1.8307 8.7656 0.017
P-001 0.017 2.4745 0.0069 0.0394 8 in Diam 2.0304 7.0903 0.00
pipe16 0.3108 3.575 0.0869 0.1992 12 in
Diam 2.795 4.5519 0.3108
pipe10 0.3108 3.5376 0.0879 0.2003 12 in
Diam 2.7735 4.5042 0.00
pipe11 0.3108 3.997 0.0778 0.1883 12 in
Diam 3.0306 5.0892 0.00
pipe12 0.3108 3.941 0.0789 0.1896 12 in
Diam 3.0014 5.0178 0.00
pipe17 0.3108 3.8958 0.0798 0.1906 12 in
Diam 2.977 4.9603 0.00
pipe18 0.3108 2.761 0.1126 0.1512 8 in Diam 5.2261 7.9113 0.00
Pipe2 0.3108 2.4745 0.1256 0.1595 8 in Diam 4.8461 7.0903 0.00
Pipe3 0.3108 2.9331 0.106 0.1461 8 in Diam 5.4897 8.4043 0.00
Pipe4 0.3278 2.4745 0.1325 0.1638 8 in Diam 4.9227 7.0903 0.00
pipe 21 0.3278 9.4387 0.0347 0.0849 8 in Diam 12.6686 27.0454 0.00
pipe 22 0.3278 4.096 0.08 0.1273 8 in Diam 7.05 11.7365 0.00
pipe 23 0.3278 4.2859 0.0765 0.1245 8 in Diam 7.2747 12.2807 0.00
HGL Analysis
From Node To Node HG El
(ft)
App
(ft)
Bend
(ft)
Junct
Loss (ft)
Adjusted HG
El (ft)
Max El
(ft)
398.48
CB-3 Detention
Pipe Inlet 398.5007 0.0137 0.0206 ------ 398.5076 400.5600
Modular
Wetland Out CB-3 398.5350 0.0137 0.0000 ------ 398.5214 400.1100
Modular
Wetland
Modular
Wetland Out 400.3847 ------ 0.0335 ------ 400.4182 402.5500
CB4 Modular
Wetland 400.7150 ------ 0.0561 0.0211 400.7922 403.0500
No approach losses at node CB9 because inverts and/or crowns are offset.
CB8 CB4 401.4218 ------ 0.0002 ------ 401.4220 410.1000
CB9 CB8 406.5716 ------ ------ ------ 406.5716 411.5100
No approach losses at node CB6 because inverts and/or crowns are offset.
CB5 CB4 403.4012 ------ 0.0164 ------ 403.4176 406.2500
No approach losses at node CB7 because inverts and/or crowns are offset.
CB6 CB5 403.4462 0.4241 0.0040 ------ 403.0261 408.0300
CB7 CB6 406.2023 ------ 0.0007 ------ 406.2030 409.8500
CB-14 CB7 406.4989 ------ 0.0172 ------ 406.5162 411.5800
CB13 CB-14 406.9188 ------ 0.1352 ------ 407.0540 412.5100
CB12 CB13 407.1909 0.1194 0.0053 ------ 407.0767 412.0000
CB10 CB12 407.5494 ------ 0.1441 ------ 407.6935 410.7000
CB11 CB10 407.8304 ------ ------ ------ 407.8304 410.5600
Conduit Notes
Reach HW Depth
(ft)
HW/D
ratio
Q
(cfs)
TW Depth
(ft) Dc (ft)Dn
(ft) Comment
pipe
23 3.6107 5.4165 0.33 3.5900 0.2657 0.1245 Outlet Control
pipe
22 2.9242 4.3868 0.33 2.8976 0.2657 0.1273 Outlet Control
pipe
21 0.2747 0.4121 0.33 1.3214 0.2657 0.0849
SuperCrit flow, Inlet end
controls
Pipe4 0.3650 0.5476 0.33 0.3082 0.2657 0.1638
SuperCrit flow, Inlet end
controls
P-001 0.0718 0.1077 0.02 0.4422 0.0584 0.0394
SuperCrit flow, Inlet end
controls
pipe15 0.0616 0.0616 0.02 0.0525 0.0525 0.0367
SuperCrit flow, Inlet end
controls
Pipe3 0.3512 0.5269 0.31 0.4422 0.2583 0.1461
SuperCrit flow, Inlet end
controls
Pipe2 1.1762 1.7645 0.31 1.1476 0.2583 0.1595 Outlet Control
pipe18 0.3523 0.5285 0.31 0.2583 0.2583 0.1512
SuperCrit flow, Inlet end
controls
pipe17 0.3089 0.3089 0.31 0.3530 0.2297 0.1906
SuperCrit flow, Inlet end
controls
pipe12 0.3088 0.3088 0.31 0.3262 0.2297 0.1896
SuperCrit flow, Inlet end
controls
pipe11 0.4009 0.4009 0.31 0.4440 0.2297 0.1883
Outlet Control M1
Backwater
pipe10 0.3094 0.3094 0.31 0.2867 0.2297 0.2003
SuperCrit flow, Inlet end
controls
pipe16 0.4704 0.4704 0.31 0.4535 0.2297 0.1992
Outlet Control M1
Backwater
Reach
ID
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s) CFlow
pipe 24 0.00 6.0398 0.00 0.00 12 in
Diam NaN 7.6901 0.00
Pipe19 8.61 11.668 0.7379 0.6396 12 in
Diam 16.2313 14.8562 8.61
pipe 30 8.61 7.3813 1.1665 1.00 12 in
Diam 10.9626 9.3982 0.00
HGL Analysis
From Node To
Node
HG El
(ft)
App
(ft)
Bend
(ft)
Junct
Loss (ft)
Adjusted HG
El (ft)
Max El
(ft)
389.0599
CB-1 CB-
A16 394.9177 1.8661 0.0107 ------ 393.0622 397.0000
Detention Pipe
Outfall CB-1 0.0000 ------ ------ ------ 0.0000 400.6500
CB-1A CB-1 400.8850 ------ ------ ------ 400.8850 401.6000
Conduit Notes
Reach HW Depth
(ft)
HW/D
ratio
Q
(cfs)
TW Depth
(ft) Dc (ft)Dn
(ft) Comment
pipe
30 6.8577 6.8577 8.61 1.0000 0.9885 >D Outlet Control
Pipe19 4.2850 4.2850 8.61 2.3421 0.9885 0.6396
SuperCrit flow, Inlet end
controls
Node and Reach invert report
Node and Reach invert report
Licensed to: Engenious Systems, Inc.
410
390
400
390
4 0 0
400410410410
5.1FIGURE:
PROJECTION: WASHINGTONSTATE PLANE, NORTH ZONE,NAD 83 HARN, FEET
JOB NUMBER: 16-137DRAWING NAME: 16-137F4.2
DRAWING BY: D.WESTLEYDATE: 1-10-2017SCALE: AS SHOWNJURISDICTION: RENTON
DESIGNER: D.WESTLEY
REVISION: SOURCE INFORMATIONDESCRIPTIONSOURCE AGENCY16-137DevelopedHydrologyMap.mxd | MOD: 1/10/2017 | DEWVICINITY MAP
RENTON SPECIAL CARE COMMUNITY, LLCRENTON SPECIAL CARE COMMUNITYCONVEYANCE BASIN MAPKING COUNTY GISCONTOURS GENERATED FROM BARE EARTH LiDAR (KING COUNTY).THIS DATA HAS A STATED VERTICAL ACCURACY OF APPROXIMATELY 1 FOOT.THE CIVIL ENGINEERING GROUPCommercialInfrastructureResidential14201 NE 200th St., #100Woodinville, WA 98072Ph. 425.806.1869www.LDCcorp.comFx. 425.482.2893q
Scale in Feet
0 40 80
10 Foot Contour
Contours (LiDAR)
2 Foot Contour
LEGEND
Subject Property
Parcel Boundary PARCEL BOUNDARYCITY OF RENTON GISSR-522MAPPED EXTENT
Watercourse 108th Ave SE108th Ave SESE 172nd St AERIALS EXPRESS, INC.AERIAL IMAGERYConveyance Basin A0.43AC
CONVEYANCE BASIN AREAS
BASIN A TOTAL
TOTAL =0.43 ACTILL GRASS 0.05 AC
IMPERVIOUS 0.38 AC
Conveyance Basin B0.22AC
BASIN B TOTAL
TOTAL =0.22 ACTILL GRASS 0.06 ACIMPERVIOUS0.16 AC
Technical Information Report 6-1 LDC Job No. 16-137
6.0 SPECIAL REPORTS AND STUDIES
Geotechnical Engineer Study prepared by Earth Solutions NW, LLC dated
11/11/15 (Project # ES-3613)
Site Investigation and Analysis of Previous Geotechnical Report, Renton
Special Care Community, 17033 – 108th Avenue SE, Renton, Washington
prepared by PSI, Inc. dated November 2nd, 2016
Infiltration Testing Letter Report prepared by PSI, Inc. dated January 6th,
2017
Technical Information Report 8-1 LDC Job No. 16-137
8.0 SWPPP ANALYSIS AND DESIGN
SWPPP analysis and design has been prepared and has been submitted as a
separate document.
Technical Information Report 9-1 LDC Job No. 16-137
9.0 BOND QUANTITIES & FACILITY SUMMARIES
Bond Quantities have been prepared and are attached in the following pages.
Technical Information Report 10-1 LDC Job No. 16-137
10.0 OPERATIONS AND MAINTENANCE MANUAL
The proposed storm system consists of catch basins, manholes, a detention
tank facility and a Filterra water quality facility. These facilities will require
periodic maintenance and inspection based on the procedures below. The
procedures are based on Appendix A of the 2017 City of Renton Surface Water
Design Manual.
Technical Information Report 9-1 LDC Job No. 16-137
9.0 BOND QUANTITIES & FACILITY SUMMARIES
Bond Quantities have been prepared and are attached in the following pages.
CED Permit #:C17002683UnitReference # Price Unit Quantity CostBackfill & compaction‐embankmentESC‐16.50$ CYCheck dams, 4" minus rockESC‐2SWDM 5.4.6.380.00$ Each 9720.00Catch Basin ProtectionESC‐335.50$ Each 10355.00Crushed surfacing 1 1/4" minusESC‐4WSDOT 9‐03.9(3)95.00$ CYDitchingESC‐59.00$ CYExcavation‐bulkESC‐62.00$ CYFence, siltESC‐7SWDM 5.4.3.11.50$ LF 470705.00Fence, Temporary (NGPE)ESC‐81.50$ LFGeotextile FabricESC‐92.50$ SYHay Bale Silt TrapESC‐100.50$ EachHydroseedingESC‐11SWDM 5.4.2.40.80$ SYInterceptor Swale / DikeESC‐121.00$ LF 710710.00Jute MeshESC‐13SWDM 5.4.2.23.50$ SYLevel SpreaderESC‐141.75$ LFMulch, by hand, straw, 3" deepESC‐15SWDM 5.4.2.12.50$ SYMulch, by machine, straw, 2" deepESC‐16SWDM 5.4.2.12.00$ SYPiping, temporary, CPP, 6"ESC‐1712.00$ LFPiping, temporary, CPP, 8"ESC‐1814.00$ LFPiping, temporary, CPP, 12"ESC‐1918.00$ LF 1402,520.00Plastic covering, 6mm thick, sandbaggedESC‐20SWDM 5.4.2.34.00$ SYRip Rap, machine placed; slopesESC‐21WSDOT 9‐13.1(2)45.00$ CYRock Construction Entrance, 50'x15'x1'ESC‐22SWDM 5.4.4.11,800.00$ EachRock Construction Entrance, 100'x15'x1'ESC‐23SWDM 5.4.4.13,200.00$ Each 13,200.00Sediment pond riser assemblyESC‐24SWDM 5.4.5.22,200.00$ Each 12,200.00Sediment trap, 5' high berm ESC‐25SWDM 5.4.5.119.00$ LFSed. trap, 5' high, riprapped spillway berm section ESC‐26SWDM 5.4.5.170.00$ LFSeeding, by handESC‐27SWDM 5.4.2.41.00$ SY 170170.00Sodding, 1" deep, level groundESC‐28SWDM 5.4.2.58.00$ SYSodding, 1" deep, sloped groundESC‐29SWDM 5.4.2.510.00$ SYTESC SupervisorESC‐30110.00$ HR 404,400.00Water truck, dust controlESC‐31SWDM 5.4.7140.00$ HR 202,800.00UnitReference # Price Unit Quantity CostEROSION/SEDIMENT SUBTOTAL: 17,780.00SALES TAX @ 9.5% 1,689.10EROSION/SEDIMENT TOTAL: 19,469.10(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)WRITE‐IN‐ITEMS Page 2 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostGENERAL ITEMS Backfill & Compaction‐ embankment GI‐16.00$ CYBackfill & Compaction‐ trench GI‐29.00$ CYClear/Remove Brush, by hand (SY) GI‐31.00$ SYBollards ‐ fixed GI‐4 240.74$ EachBollards ‐ removable GI‐5 452.34$ EachClearing/Grubbing/Tree Removal GI‐6 10,000.00$ AcreExcavation ‐ bulk GI‐72.00$ CYExcavation ‐ Trench GI‐85.00$ CYFencing, cedar, 6' high GI‐9 20.00$ LFFencing, chain link, 4' GI‐10 38.31$ LFFencing, chain link, vinyl coated, 6' high GI‐11 20.00$ LFFencing, chain link, gate, vinyl coated, 20' GI‐12 1,400.00$ EachFill & compact ‐ common barrow GI‐13 25.00$ CYFill & compact ‐ gravel base GI‐14 27.00$ CYFill & compact ‐ screened topsoil GI‐15 39.00$ CYGabion, 12" deep, stone filled mesh GI‐16 65.00$ SYGabion, 18" deep, stone filled mesh GI‐17 90.00$ SYGabion, 36" deep, stone filled mesh GI‐18 150.00$ SYGrading, fine, by hand GI‐19 2.50$ SYGrading, fine, with grader GI‐20 2.00$ SYMonuments, 3' Long GI‐21 250.00$ EachSensitive Areas Sign GI‐22 7.00$ EachSodding, 1" deep, sloped ground GI‐23 8.00$ SYSurveying, line & grade GI‐24 850.00$ DaySurveying, lot location/lines GI‐25 1,800.00$ AcreTopsoil Type A (imported) GI‐26 28.50$ CYTraffic control crew ( 2 flaggers )GI‐27 120.00$ HR 607,200.00Trail, 4" chipped wood GI‐28 8.00$ SYTrail, 4" crushed cinder GI‐29 9.00$ SYTrail, 4" top course GI‐30 12.00$ SYConduit, 2" GI‐31 5.00$ LFWall, retaining, concrete GI‐32 55.00$ SFWall, rockery GI‐33 15.00$ SF 1271,905.00SUBTOTAL THIS PAGE:7,200.00 1,905.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)Page 3 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000sy RI‐1 30.00$ SYAC Grinding, 4' wide machine 1000‐2000sy RI‐2 16.00$ SYAC Grinding, 4' wide machine > 2000sy RI‐3 10.00$ SY 109810,980.00AC Removal/Disposal RI‐4 35.00$ SY 1996,965.00Barricade, Type III ( Permanent )RI‐5 56.00$ LFGuard Rail RI‐6 30.00$ LFCurb & Gutter, rolled RI‐7 17.00$ LF 1422,414.00Curb & Gutter, vertical RI‐8 12.50$ LF 7058,812.50106013,250.00Curb and Gutter, demolition and disposal RI‐9 18.00$ LFCurb, extruded asphalt RI‐10 5.50$ LFCurb, extruded concrete RI‐11 7.00$ LFSawcut, asphalt, 3" depth RI‐12 1.85$ LF 6661,232.10Sawcut, concrete, per 1" depth RI‐13 3.00$ LFSealant, asphalt RI‐14 2.00$ LF 6661,332.00Shoulder, gravel, 4" thick RI‐15 15.00$ SYSidewalk, 4" thick RI‐16 38.00$ SY 69326,334.0081030,780.00Sidewalk, 4" thick, demolition and disposal RI‐17 32.00$ SYSidewalk, 5" thick RI‐18 41.00$ SYSidewalk, 5" thick, demolition and disposal RI‐19 40.00$ SYSign, Handicap RI‐20 85.00$ Each 2170.00Striping, per stall RI‐21 7.00$ Each 26182.00Striping, thermoplastic, ( for crosswalk )RI‐22 3.00$ SFStriping, 4" reflectorized line RI‐23 0.50$ LFAdditional 2.5" Crushed Surfacing RI‐24 3.60$ SYHMA 1/2" Overlay 1.5" RI‐25 14.00$ SYHMA 1/2" Overlay 2" RI‐26 18.00$ SY 109819,764.00HMA Road, 2", 4" rock, First 2500 SY RI‐27 28.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SY RI‐28 21.00$ SYHMA Road, 4", 6" rock, First 2500 SY RI‐29 45.00$ SY 1998,955.00HMA Road, 4", 6" rock, Qty. over 2500 SY RI‐30 37.00$ SYHMA Road, 4", 4.5" ATB RI‐31 38.00$ SYGravel Road, 4" rock, First 2500 SY RI‐32 15.00$ SYGravel Road, 4" rock, Qty. over 2500 SY RI‐33 10.00$ SYThickened Edge RI‐34 8.60$ LFSUBTOTAL THIS PAGE:86,788.60 44,382.00(B)(C)(D)(E)Page 4 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B) (C)PARKING LOT SURFACING No.2" AC, 2" top course rock & 4" borrow PL‐1 21.00$ SY 125026,250.002" AC, 1.5" top course & 2.5" base course PL‐2 28.00$ SY4" select borrow PL‐35.00$ SY1.5" top course rock & 2.5" base course PL‐4 14.00$ SYSUBTOTAL PARKING LOT SURFACING:26,250.00(B)(C)(D)(E)LANDSCAPING & VEGETATION No.Street Trees LA‐1 500.00$ EA 73,500.00Median Landscaping LA‐2‐$ SFRight‐of‐Way Landscaping LA‐3 3,417.00$ SF 517,085.00Wetland Landscaping LA‐4‐$ SFSUBTOTAL LANDSCAPING & VEGETATION:20,585.00(B)(C)(D)(E)TRAFFIC & LIGHTING No.Signs TR‐1Street Light System ( # of Poles) TR‐2 8,000.00$ EA 540,000.00Traffic Signal TR‐3Traffic Signal Modification TR‐4SUBTOTAL TRAFFIC & LIGHTING:40,000.00(B)(C)(D)(E)WRITE‐IN‐ITEMSSUBTOTAL WRITE‐IN ITEMS:STREET AND SITE IMPROVEMENTS SUBTOTAL: 154,573.60 46,287.00SALES TAX @ 9.5% 14,684.49 4,397.27STREET AND SITE IMPROVEMENTS TOTAL: 169,258.09 50,684.27(B)(C)(D)(E)Page 5 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D‐1 26.00$ SY* (CBs include frame and lid)Beehive D‐2 90.00$ EachThrough‐curb Inlet Framework D‐3 400.00$ EachCB Type ID‐4 1,500.00$ Each 23,000.0069,000.00CB Type IL D‐5 1,750.00$ EachCB Type II, 48" diameter D‐6 2,300.00$ Each 24,600.0012,300.00 for additional depth over 4' D‐7 480.00$ FTCB Type II, 54" diameter D‐8 2,500.00$ Each 12,500.00 for additional depth over 4' D‐9 495.00$ FTCB Type II, 60" diameter D‐10 2,800.00$ Each for additional depth over 4' D‐11 600.00$ FTCB Type II, 72" diameter D‐12 6,000.00$ Each for additional depth over 4' D‐13 850.00$ FTCB Type II, 96" diameter D‐14 14,000.00$ Each for additional depth over 4' D‐15 925.00$ FTTrash Rack, 12" D‐16 350.00$ EachTrash Rack, 15" D‐17 410.00$ EachTrash Rack, 18" D‐18 480.00$ EachTrash Rack, 21" D‐19 550.00$ EachCleanout, PVC, 4" D‐20 150.00$ EachCleanout, PVC, 6" D‐21 170.00$ Each 132,210.00Cleanout, PVC, 8" D‐22 200.00$ EachCulvert, PVC, 4" D‐23 10.00$ LFCulvert, PVC, 6" D‐24 13.00$ LF 6007,800.00Culvert, PVC, 8" D‐25 15.00$ LF 3104,650.00Culvert, PVC, 12" D‐26 23.00$ LF 2876,601.002626,026.00Culvert, PVC, 15" D‐27 35.00$ LFCulvert, PVC, 18" D‐28 41.00$ LFCulvert, PVC, 24" D‐29 56.00$ LFCulvert, PVC, 30" D‐30 78.00$ LFCulvert, PVC, 36" D‐31 130.00$ LFCulvert, CMP, 8" D‐32 19.00$ LFCulvert, CMP, 12" D‐33 29.00$ LFSUBTOTAL THIS PAGE:14,201.00 34,486.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)Page 6 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)DRAINAGE (Continued)Culvert, CMP, 15" D‐34 35.00$ LFCulvert, CMP, 18" D‐35 41.00$ LFCulvert, CMP, 24" D‐36 56.00$ LFCulvert, CMP, 30" D‐37 78.00$ LFCulvert, CMP, 36" D‐38 130.00$ LFCulvert, CMP, 48" D‐39 190.00$ LFCulvert, CMP, 60" D‐40 270.00$ LFCulvert, CMP, 72" D‐41 350.00$ LFCulvert, Concrete, 8" D‐42 42.00$ LFCulvert, Concrete, 12" D‐43 48.00$ LFCulvert, Concrete, 15" D‐44 78.00$ LFCulvert, Concrete, 18" D‐45 48.00$ LFCulvert, Concrete, 24" D‐46 78.00$ LFCulvert, Concrete, 30" D‐47 125.00$ LFCulvert, Concrete, 36" D‐48 150.00$ LFCulvert, Concrete, 42" D‐49 175.00$ LFCulvert, Concrete, 48" D‐50 205.00$ LFCulvert, CPE Triple Wall, 6" D‐51 14.00$ LFCulvert, CPE Triple Wall, 8" D‐52 16.00$ LFCulvert, CPE Triple Wall, 12" D‐53 24.00$ LFCulvert, CPE Triple Wall, 15" D‐54 35.00$ LFCulvert, CPE Triple Wall, 18" D‐55 41.00$ LFCulvert, CPE Triple Wall, 24" D‐56 56.00$ LFCulvert, CPE Triple Wall, 30" D‐57 78.00$ LFCulvert, CPE Triple Wall, 36" D‐58 130.00$ LFCulvert, LCPE, 6" D‐59 60.00$ LFCulvert, LCPE, 8" D‐60 72.00$ LFCulvert, LCPE, 12" D‐61 84.00$ LFCulvert, LCPE, 15" D‐62 96.00$ LFCulvert, LCPE, 18" D‐63 108.00$ LFCulvert, LCPE, 24" D‐64 120.00$ LFCulvert, LCPE, 30" D‐65 132.00$ LFCulvert, LCPE, 36" D‐66 144.00$ LFCulvert, LCPE, 48" D‐67 156.00$ LFCulvert, LCPE, 54" D‐68 168.00$ LFSUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 7 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)DRAINAGE (Continued)Culvert, LCPE, 60" D‐69 180.00$ LFCulvert, LCPE, 72" D‐70 192.00$ LFCulvert, HDPE, 6" D‐71 42.00$ LFCulvert, HDPE, 8" D‐72 42.00$ LFCulvert, HDPE, 12" D‐73 74.00$ LFCulvert, HDPE, 15" D‐74 106.00$ LFCulvert, HDPE, 18" D‐75 138.00$ LFCulvert, HDPE, 24" D‐76 221.00$ LFCulvert, HDPE, 30" D‐77 276.00$ LFCulvert, HDPE, 36" D‐78 331.00$ LFCulvert, HDPE, 48" D‐79 386.00$ LFCulvert, HDPE, 54" D‐80 441.00$ LFCulvert, HDPE, 60" D‐81 496.00$ LFCulvert, HDPE, 72" D‐82 551.00$ LFPipe, Polypropylene, 6" D‐83 84.00$ LFPipe, Polypropylene, 8" D‐84 89.00$ LFPipe, Polypropylene, 12" D‐85 95.00$ LFPipe, Polypropylene, 15" D‐86 100.00$ LFPipe, Polypropylene, 18" D‐87 106.00$ LFPipe, Polypropylene, 24" D‐88 111.00$ LFPipe, Polypropylene, 30" D‐89 119.00$ LFPipe, Polypropylene, 36" D‐90 154.00$ LFPipe, Polypropylene, 48" D‐91 226.00$ LFPipe, Polypropylene, 54" D‐92 332.00$ LFPipe, Polypropylene, 60" D‐93 439.00$ LFPipe, Polypropylene, 72" D‐94 545.00$ LFCulvert, DI, 6" D‐95 61.00$ LFCulvert, DI, 8" D‐96 84.00$ LFCulvert, DI, 12" D‐97 106.00$ LFCulvert, DI, 15" D‐98 129.00$ LFCulvert, DI, 18" D‐99 152.00$ LFCulvert, DI, 24" D‐100 175.00$ LFCulvert, DI, 30" D‐101 198.00$ LFCulvert, DI, 36" D‐102 220.00$ LFCulvert, DI, 48" D‐103 243.00$ LFCulvert, DI, 54" D‐104 266.00$ LFCulvert, DI, 60" D‐105 289.00$ LFCulvert, DI, 72" D‐106 311.00$ LFPage 8 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)SUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 9 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)Specialty Drainage ItemsDitching SD‐19.50$ CYFlow Dispersal Trench (1,436 base+) SD‐3 28.00$ LF French Drain (3' depth) SD‐4 26.00$ LFGeotextile, laid in trench, polypropylene SD‐53.00$ SYMid‐tank Access Riser, 48" dia, 6' deep SD‐6 2,000.00$ EachPond Overflow Spillway SD‐7 16.00$ SYRestrictor/Oil Separator, 12" SD‐8 1,150.00$ EachRestrictor/Oil Separator, 15" SD‐9 1,350.00$ EachRestrictor/Oil Separator, 18" SD‐10 1,700.00$ EachRiprap, placed SD‐11 42.00$ CYTank End Reducer (36" diameter) SD‐12 1,200.00$ EachInfiltration pond testing SD‐13 125.00$ HRPermeable Pavement SD‐14Permeable Concrete Sidewalk SD‐15Culvert, Box __ ft x __ ft SD‐16SUBTOTAL SPECIALTY DRAINAGE ITEMS:(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention Pond SF‐1Each Detention Tank SF‐2 76,833.00$ Each 176,833.00Detention Vault SF‐3Each Infiltration Pond SF‐4Each Infiltration Tank SF‐5Each Infiltration Vault SF‐6Each Infiltration Trenches SF‐7Each Basic Biofiltration Swale SF‐8Each Wet Biofiltration Swale SF‐9Each Wetpond SF‐10 Each Wetvault SF‐11 Each Sand Filter SF‐12 Each Sand Filter Vault SF‐13 Each Linear Sand Filter SF‐14 Each Proprietary Facility SF‐15 Each Bioretention Facility SF‐16 Each SUBTOTAL STORMWATER FACILITIES:76,833.00(B)(C)(D)(E)Page 10 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B) (C)WRITE‐IN‐ITEMS (INCLUDE ON‐SITE BMPs)Filterra Vault WI‐1 27,700.00$ EA 127,700.00WI‐2WI‐3WI‐4WI‐5WI‐6WI‐7WI‐8WI‐9WI‐10WI‐11WI‐12WI‐13WI‐14WI‐15SUBTOTAL WRITE‐IN ITEMS:27,700.00DRAINAGE AND STORMWATER FACILITIES SUBTOTAL: 14,201.00 139,019.00SALES TAX @ 9.5% 1,349.10 13,206.81DRAINAGE AND STORMWATER FACILITIES TOTAL: 15,550.10 152,225.81(B) (C) (D) (E)Page 11 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostConnection to Existing Watermain W‐1 2,000.00$ EachDuctile Iron Watermain, CL 52, 4 Inch Diameter W‐2 50.00$ LFDuctile Iron Watermain, CL 52, 6 Inch Diameter W‐3 56.00$ LFDuctile Iron Watermain, CL 52, 8 Inch Diameter W‐4 60.00$ LFDuctile Iron Watermain, CL 52, 10 Inch Diameter W‐5 70.00$ LFDuctile Iron Watermain, CL 52, 12 Inch Diameter W‐6 80.00$ LFGate Valve, 4 inch Diameter W‐7 500.00$ EachGate Valve, 6 inch Diameter W‐8 700.00$ EachGate Valve, 8 Inch Diameter W‐9 800.00$ EachGate Valve, 10 Inch Diameter W‐10 1,000.00$ EachGate Valve, 12 Inch Diameter W‐11 1,200.00$ EachFire Hydrant Assembly W‐12 4,000.00$ EachPermanent Blow‐Off Assembly W‐13 1,800.00$ EachAir‐Vac Assembly, 2‐Inch Diameter W‐14 2,000.00$ EachAir‐Vac Assembly, 1‐Inch Diameter W‐15 1,500.00$ EachCompound Meter Assembly 3‐inch Diameter W‐16 8,000.00$ EachCompound Meter Assembly 4‐inch Diameter W‐17 9,000.00$ EachCompound Meter Assembly 6‐inch Diameter W‐18 10,000.00$ EachPressure Reducing Valve Station 8‐inch to 10‐inch W‐19 20,000.00$ EachWATER SUBTOTAL:SALES TAX @ 9.5%WATER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B) (C)Page 12 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
CED Permit #:C17002683Existing Future Public PrivateRight‐of‐Way Improvements Improvements(D)(E)Description No. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostClean Outs SS‐1 1,000.00$ EachGrease Interceptor, 500 gallon SS‐2 8,000.00$ EachGrease Interceptor, 1000 gallon SS‐3 10,000.00$ EachGrease Interceptor, 1500 gallon SS‐4 15,000.00$ EachSide Sewer Pipe, PVC. 4 Inch Diameter SS‐5 80.00$ LFSide Sewer Pipe, PVC. 6 Inch Diameter SS‐6 95.00$ LFSewer Pipe, PVC, 8 inch Diameter SS‐7 105.00$ LFSewer Pipe, PVC, 12 Inch Diameter SS‐8 120.00$ LFSewer Pipe, DI, 8 inch Diameter SS‐9 115.00$ LFSewer Pipe, DI, 12 Inch Diameter SS‐10 130.00$ LFManhole, 48 Inch Diameter SS‐11 6,000.00$ EachManhole, 54 Inch Diameter SS‐13 6,500.00$ EachManhole, 60 Inch Diameter SS‐15 7,500.00$ EachManhole, 72 Inch Diameter SS‐17 8,500.00$ EachManhole, 96 Inch Diameter SS‐19 14,000.00$ EachPipe, C‐900, 12 Inch Diameter SS‐21 180.00$ LFOutside Drop SS‐24 1,500.00$ LSInside Drop SS‐25 1,000.00$ LSSewer Pipe, PVC, ____ Inch Diameter SS‐26Lift Station (Entire System) SS‐27 LSSANITARY SEWER SUBTOTAL:SALES TAX @ 9.5%SANITARY SEWER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B) (C)Page 13 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right‐of‐Way Improvements Subtotal (b) (b)169,258.09$ Future Public Improvements Subtotal(c)‐$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d) (d)167,775.90$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond67,406.80$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only ‐ May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. (425) 806‐1869mvillwock@LDCcorp.comRenton Special Care CommunityA17‐00002317033 108th Ave. SE Rentoon, WA 0087000293 & 0087000285FOR APPROVALC1700268320210 142nd Avenue NE441,132.14$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS6/14/2017Mark E. Villwock40908LDC, Inc.R((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right‐of‐Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R ‐ S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)EST1((b) + (c) + (d)) x 20%‐$ MAINTENANCE BOND */**(after final acceptance of construction)19,469.10$ 169,258.09$ 421,663.04$ 19,469.10$ ‐$ 167,775.90$ ‐$ Page 14 of 14Ref 8‐H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 03/14/2017Printed 9/14/2017