SUBMITTAL REQUIREMENTS
CONSTRUCTION PERMIT APPLICATION
PER ORDINANCE NO. 4345
Planning Division | Development Engineering Section
1055 S Grady Way – Renton, WA 98057
Phone: (425) 430-7200 | www.rentonwa.gov
1.Fill out Construction Permit Application form and Construction Permit Cost Breakdown form.
It is required that you provide your best estimate on the cost of proposed improvements to
water (if the project has City of Renton water service), wastewater (if the project has City of
Renton wastewater service), stormwater, and transportation facilities, both on-site and off-
site.
2.Pay the inspection/approval fee, as determined on the attached Construction Permit Cost
Breakdown form, at the 6th floor Customer Service Counter of Renton City Hall. You may call
(425) 430-7266 beforehand to verify the fee. You will be given a receipt for the payment.
3.Deliver a copy of the inspection/approval fee receipt to the 6th floor Customer Service
Counter of Renton City Hall along with your sets of utility plans.
4.At permit issuance, a 3% Technology Surcharge Fee will be added to all permit fees. This fee
will NOT be collected at the time of plan submittal.
H:\CED\Data\Forms-Templates\Self-Help Handouts\Public Works\Construction Permit Application.docx 08/2015
1
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
CONSTRUCTION PERMIT APPLICATION
Planning Division | Development Engineering Section
Phone: (425) 430-7200 | www.rentonwa.gov
☐ New Building ☐ Addition to Existing ☐ Tenant Improvement
Project Address:
Work Description:
King County Tax Assessor Number:
Legal Description:
Square Footage of Entire site Impervious Area
Property Owner:
Address:
City/State/Zip: Phone/Fax:
Applicant:
Address:
City/State/Zip: Phone/Fax:
When applying for redevelopment, credit
Water meter size: Account No:
Information provided by Utility Billing (425) 430-6852
This application does not constitute a permit to work.
Work is not to commence until a construction permit is issued.
I certify that the information on this application is accurate to the best of my knowledge and I will be
responsible for any additional fees resulting from a different valuation.
Print Name Signature Date
H:\CED\Data\Forms-Templates\Self-Help Handouts\Public Works\Construction Permit Application.docx 08/2015
2
735 Hardie Avenue SW
Construction of a fast-food restaurant with drive-through and parking over an
existing paved parking lot. Work will include removal of existing asphalt and curb, grading, paving,
curbs, installation of stormwater pipes and treatment facility, sewer/water services, landscaping.
1923059104
A portion of Lot 3 City of Redmond LLA No. LUA 15-000237
31,487 sf 22,128 sf
Olympic Cascade Drive Ins, LLC
19689 7th Avenue NE, Suite 183 PMB 326
Poulsbo, WA 98370 (206) 372-8732
Richard Ramsey, Olympic Cascade Drive Ins, LLC
19689 7th Avenue NE, Suite 182 PMB 326
Poulsbo, WA 98370 (206) 372-8732
None
4
Print Form Reset Form Save Form
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
DEVELOPMENT ENGINEERING CONSTRUCTION PERMIT INSPECTION/APPROVAL
FEE CALCULATION WORKSHEET
50% INSPECTION/APPROVAL FEES PER ORDINANCE NO. 4345
PROJECT NAME:
1.Estimate the total cost of offsite and onsite improvements for water lines (for City of Renton water
service), sewer lines (for City of Renton sewer service), stormwater facilities, and roadway improvements
for your project. Enter estimated costs in items (A) through (D) below.
(A) Water $
(B) Sewer $
(C) Stormwater $
(Includes On-Site Pavement)
(D) Roadway $
(Street, sidewalks, street lighting, etc.)
(E) Total Improvements $
(A) + (B) + (C) + (D) = (E)
2.Calculate 50% inspection/approval fee for total improvements, as follows:
(F) 3% of First $150,000 of (E) $
(G) 2.5% of over $150,000 but $
less than $300,000 of (E)
(H) 2% of over $300,000 of (E) $
(I) Total 50% Inspection/Approval $
Fee: (F) + (G) + (H) = (I)
3.Breakdown of 50% Inspection/Approval Fees is performed as follows:
(J) 50% Water Fee $
((A) ÷ (E)) x (I) = (J)
(K) 50% Sewer Fee $
((B) ÷ (E)) x (I) = (K)
(L) 50% Stormwater Fee $
((C) ÷ (E)) x (I) = (L)
(M) 50% Roadway Fee: $
((D) ÷ (E)) x (I) = (M)
4.Check: Make sure (J) + (K) + (L) + (M) = (I)
H:\CED\Data\Forms-Templates\Self-Help Handouts\Public Works\Construction Permit Application.docx 08/2015
3
Renton Sonic
5,860.00
27,786.00
274,778.00
16,840.00
325,264.00
4,500.00
3,750.00
505.28
8,755.28
157.74
747.93
7,396.33
453.28
$ 8,755.28
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
SAMPLE CALCULATION
DEVELOPMENT ENGINEERING CONSTRUCTION PERMIT INSPECTION/APPROVAL
FEE CALCULATION WORKSHEET
50% INSPECTION/APPROVAL FEES PER ORDINANCE NO. 4345
PROJECT NAME: XYZ Apartments
1.Estimate the total cost of offsite and onsite improvements for water lines, sewer lines, stormwater
facilities, and roadway improvements for your project. Enter estimated costs in items (A) through (D)
below.
(A) Water $ 45,000
(B) Sewer $ 20,000
(C) Stormwater $ 108,000
(Includes On-Site Pavement)
(D) Roadway $ 62,000
(Street, sidewalks, street lighting, etc.)
(E) Total Improvements $ 235,000
45,000 + 20,000 + 108,000 + 62,000 = 235,000
2.Calculate 50% inspection/approval fee for total improvements, as follows:
(F) 3% of First $150,000 of (E) $ 4,500
.03 x 150,000 = 4,500
(G) 2.5% of over $150,000 but $ 2,125
less than $300,000 of (E)
.025 x 85,000 = 2,125
(H) 2% of over $300,000 of (E) $ 0
(I) Total 50% Inspection/Approval $ 6,625
Fee: 4,500 + 2,125+ 0 = 6,625
3.Breakdown of 50% Inspection/Approval Fees is performed as follows:
(J) 50% Water Fee $ 1,268
(45,000 ÷ 235,000) x 6,625 = 1,268
(K) 50% Sewer Fee $ 564
(20,000 ÷ 235,000) x 6,625 = 564
(L) 50% Stormwater Fee $ 3,045
(108,000 ÷ 235,000) x 6,625 = 3,045
(M) 50% Roadway Fee: $ 1,748
(62,000 ÷ 235,000) x 6,625 = 1,748
4.Check: Make sure 1,268 + 564 + 3,045 + 1,748 = 6,625 $ 6,625