Sunset Court Apartments
1124 -1158 Harrington Ave NE, Renton, WA
Technical Information Report
Submitted: July 13, 2017
Prepared by:
LPD Engineering, PLLC
1932 1st Avenue
Suite 201
Seattle, WA 98101
Contact: Laurie J. Pfarr, P.E.
(206) 725-1211
Prepared for:
Schemata Workshop, Inc.
1720 12th Avenue
Seattle, WA 98122
Contact: Grace Kim, AIA
(206) 285-1589
FINAL
IN COMPIANCE WITH CITY OF RENTON STANDARDS
R-3944
U-16006459
PR-16000472
LUA-16000068
DEVELOPMENT ENGINEERING
Ann Fowler 07/13/2017
SURFACE WATER UTILITY
rstraka 07/14/2017
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
SUNSET COURT APARTMENTS
TABLE OF CONTENTS
Section 1 – Project Overview ......................................................................................................................................... 1
Section 2 – Conditions and Requirements Summary .............................................................................................. 3
Section 3 – Offsite Analysis .............................................................................................................................................. 6
Section 4 – Flow Control and Water Quality Facility Analysis and Design ..................................................... 8
Section 5 – Conveyance Systems Analysis and Design ......................................................................................... 14
Section 6 – Special Reports and Studies ..................................................................................................................... 15
Section 7 – Other Permits .............................................................................................................................................. 15
Section 8 – CSWPPP Analysis and Design ................................................................................................................ 15
Section 9 – Bond Quantities, Facility Summaries, and Declaration of Covenant ......................................... 15
Section 10 – Operations and Maintenance Manual ................................................................................................ 16
FIGURES
Figure 1: TIR Worksheet
Figure 2: Vicinity Map
Figure 3: Soils Map
Figure 4: Existing Conditions
Figure 5: Proposed Conditions
Figure 6: Downstream Drainage Course
Figure 7: Proposed Conditions Sub-Basins
APPENDICES
Appendix A – Not Used
Appendix B - Design Calculations
Appendix C - Stormwater Pollution Prevention and Spill Plan Report
Appendix D – Operations and Maintenance Manual
Appendix E – Bond Quantities, Facilities Summary and Declaration of Covenant
Page 1
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
SECTION 1 – PROJECT OVERVIEW
This Technical Information Report (TIR) is for the Renton Housing Authority’s Sunset Court
Apartments project, an approximately 50-unit multi-family residential development. Refer to Figure 1:
TIR Worksheet for basic site information. The project is located in the City of Renton at 1124-1158
Harrington Ave NE (refer to Figure 2: Vicinity Map). The 2.00 acre property is bounded by Glenwood
Ave. NE to the north, a multi-family residential complex to the south, Harrington Place NE to the east,
and Harrington Avenue NE to the west. This TIR addresses the eight core and six special requirements
of the City of Renton 2009 Surface Water Design Manual Amendment (RSWDMA) to the 2009 King
County Surface Water Design Manual (KCSWDM). A Level 1 downstream analysis for the project
has been completed and is included in Section 3 of this Report.
The proposed improvements for the project impact the entire property, and include construction of four
new buildings including two townhome buildings and two apartment buildings. A covered bike storage
facility will also be included. The overall footprint of all proposed buildings is 25,533.5 square feet.
Additional improvements will include a 16,719 square foot parking area, two trash enclosures, bike
parking enclosure, pedestrian walkways, patios, and landscape areas.
According to Figure 1.1.2.A of the RSWDMA, Flow Chart for Determining Type of Drainage Review
Required, the project requires Full Drainage Review. According to the USDA Natural Resources
Conservation Service, the site soils in the project area are mapped as Arents, Alderwood (AmC) (refer
to Figure 3: Soils Map and Legend).
Existing Site
The total existing project area is 2.00 acres. The project area includes Sunset Court Park in the
southeast corner of the property and two existing duplex units along the western boundary. The
northeast corner of the property is currently vacant. Table 1 below summarizes existing ground cover
in the areas that are affected by this project:
Table 1-Project Site Existing Conditions
Within Project Area
sf acres
Impervious Area 17,621 0.41
Pervious Area 69,438 1.59
Total Site Area 87,059 2.00
The site gently slopes down from northeast to southwest with a slope of approximately 0.5 to 1
percent.
There are no existing drainage facilities on the property and the majority of the stormwater runoff from
the project site likely sheet flows west/southwest towards existing drainage facilities in Harrington Ave
NE, or ponds in localized low points and infiltrates or evaporates on-site (refer to Figure 4: Existing
Conditions).
For a complete description of the downstream system please refer to Section 3 – Offsite Analysis.
Page 2
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
There are no wetlands or streams located onsite. The site is not located within an erosion or landslide
hazard area.
According to the USDA Natural Resources Conservation Service, the site soils in the project area are
mapped as Arents, Alderwood material (AmC). Geotech Consultants, Inc. prepared a geotechnical
engineering report for the project, dated October 15, 2015. The subsurface soils encountered during
their site visits in August 2015 included a loose to medium-dense sand with a gravel layer extending to
depths of 2 to 6 feet underlain by a layer of medium-dense to dense silty sand with gravel interpreted as
glacial till. For the stormwater analysis, the site soils are classified as till material. A copy of the
Geotechnical Report is provided under separate cover.
Proposed Site Improvements
The proposed improvements include the construction of a multi-family residential complex consisting
of four buildings and associated parking. There will be open space and concrete walkways throughout
the site to provide pedestrian access to and from each of the buildings. (refer to Figure 5: Proposed
Conditions).
Proposed Stormwater Management Improvements
Projects in this area of the City of Renton are subject to the Peak Rate Flow Control Standard per the
Flow Control Application Map, Reference 15-A. The Western Washington Hydrology Model
(WWHM) has been used to model the proposed and existing conditions within the project site area.
The proposed improvements will result in more than a 0.1 cfs increase in the peak 100-year flow;
therefore; the project is required to provide flow control per Section 1.2.3 of the KCSWDM. Table 2
below summarizes proposed ground cover in the areas that are affected by this project:
Page 3
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
Table 2-Project Site Proposed Conditions
* Pervious pavement and Geoblock is modeled as 50% concrete sidewalk, 50% landscape in the effective
impervious summary.
The WWHM output for the peak flow rates for the developed project area is included in Table 3, and in
Appendix B of this report.
The majority of the internal walkways on the site will be pervious concrete. Portions of the roof area
for building 4 will be routed to one of two bioretention areas prior to being conveyed to one of two
proposed underground detention facilities. The remaining roof runoff will be collected and conveyed
via underground pipe to one of two underground detention facilities. Stormwater runoff from the
asphalt parking lot will sheet flow to one of five proprietary cartridge treatment structures for quality
treatment. The proprietary cartridge treatment structures will discharge to the proposed underground
detention facility located within the parking lot. The detention facilities will discharge via associated
flow control structures to the existing municipal storm system in Harrington Ave NE. See Section 4 of
this report for details of the bioretention facilities, detention design, and Flow Control BMPs.
As noted above, water quality treatment will be provided for the asphalt pavement parking area as the
new pollution generating pervious surface will be greater than 5,000 SF, as required by section 1.2.8 of
the RSWDMA.
SECTION 2 – CONDITIONS AND REQUIREMENTS SUMMARY
This section addresses the requirements set forth by the 2009 City of Renton Amendments to
KCSWDM, Core Requirements listed in Chapter 1.2.
Core Requirement 1 - Discharge at the Natural Location (1.2.1): All stormwater runoff from this
project site will remain in the natural drainage patterns within a quarter mile downstream of the project.
The site does not have an existing discharge location; however, the site slopes generally to the
southwest and any stormwater runoff that does not infiltrate onsite likely sheet flows towards the
municipal stormwater system in Harrington Ave NE. In the proposed conditions, the project site
Proposed
Project Areas
Proposed Project Areas Including
Flow Control BMP Sizing Credits
(used to model peak flow rates)
Sf acres sf acres
Impervious Areas:
Concrete Sidewalk 1,074 0.025 7,097 0.163
Pervious Concrete Sidewalk* 10,984 0.252 0 0
Asphalt Pavement 16,719 0.384 16,719 0.384
Geoblock* 580 0.013 0 0
Roof Area 25,533.5 0.586 25,533.5 0.586
Total Impervious Area 54890 1.262 49,349.5 1.133
Pervious Areas
Lawn/Landscape
32,169
0.738
37,709.5
0.866
Total Site Area 87,059 2.00 87,059 2.00
Page 4
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
stormwater runoff will be collected and detained onsite with the detention system discharging into the
existing drainage system within Harrington Ave NE matching peak flows from the existing conditions.
Core Requirement 2 - Off-site Analysis (1.2.2): A Level 1 off site investigation has been completed
for this project and is included in Section 3 of this TIR.
Core Requirement 3 – Flow Control (1.2.3): The project site is located within a Peak Rate Flow
Control Standard area, per the City of Renton Flow Control Application Map, Reference 11-A in the
RSWDMA. The site stormwater management systems have been sized to match the existing
conditions peak discharge rates for the 2- year, 10-year, and 100- year return periods assuming the
existing site conditions as the predeveloped site condition. Based on the KCSWDM definitions, the
‘existing site conditions’ are those that existed at the site prior to May 1979 as determined from aerial
photographs and, if necessary, on knowledge of individuals familiar with the area, unless a drainage
plan for land cover changes has been approved by the city since May 1979 as a part of a city permit or
approval. There have been no permitted land cover changes by the City since 1979 per the City of
Renton GIS map. Based on available historical aerials from Google Maps, and a 1965 King County
aerial of the area, the existing site improvements were present prior to 1979 and have been used as the
existing site conditions for the stormwater analysis. A copy of the referenced aerial images has been
included in Appendix B.
Core Requirement 4 - Conveyance System (1.2.4): All proposed conveyance systems will be
designed to convey at a minimum the 25-year peak flow with a minimum of 6-inches of freeboard
within each catch basin. The system is allowed to overtop during the 100-year peak flow provided that
it does not create, or aggravate a severe flooding problem.
Core Requirement 5 - Erosion and Sedimentation Control (1.2.5): A Temporary Erosion and
Sediment Control (TESC) plan for the project is included with this submittal. The TESC plan will be
considered the minimum for anticipated site conditions. The Contractor will be responsible for
implementing all TESC measures and upgrading as necessary. The TESC facilities will be in place
prior to clearing, grubbing, or construction of proposed improvements.
Core Requirement 6 - Maintenance and Operations (1.2.6): The maintenance and operations
manual is included with this Technical Information Report as Appendix D.
Core Requirement 7 – Financial Guarantees and Liability (1.2.7): All required bonds will be paid
by the Owner prior to permit approval, per Section 1.2.7 of the RSWDMA. A bond quantities
worksheet has been prepared and is included in Appendix E of this TIR.
Core Requirement 8 – Water Quality (1.2.8): As a multi-family residential development the project
would typically be subject to Enhanced Basic Water Quality per section 1.2.8.1.A of the RSWDMA.
The project drains to via a piped system to Johns Creek, downstream of Interstate-405’s of right-of-
way, and is listed as a “major receiving water” in Table 1.2.3B of the RSWDMA. Per section
1.2.8.1A, “…major receiving waters listed on page 1-33 [Table 1.2.3B] are excused for the increased
treatment and may revert to the Basic WQ menu…” However, as John’s Creek is listed on the State’s
303D list the project would need to provide Enhanced Basic Water Quality. In lieu of providing
Enhanced Basic Water Quality the Owner has signed a Declaration of Covenant prohibiting the use of
leachable metals on the property and Basic Water Quality will be provided. The Declaration of
Covenant is included in Appendix E and has been submitted to the City Clerk’s office for final
recording.
Page 5
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
Basic WQ Treatment of the pollution generating impervious surfaces will be provided with proprietary
cartridge treatment systems. Treatment of pollution generating pervious surfaces will not be explicitly
provided; a Landscape Management Plan that controls solids, pesticides, and fertilizers leaving the site
will be created for the project, The Landscape Management Plan will be provided under separate cover
and prepared by the Landscape Architect.
Special Requirements
Special Requirement 1 – Other Adopted Area-Specific Requirements (1.3.1): The RSWDMA is
one of several adopted regulations in the City of Renton that apply requirements for controlling
drainage on an area-specific basis. Other adopted area-specific regulations may include requirements
that may have a direct bearing on the drainage design of a proposed project. These regulations include
the following:
Master Drainage Plans (MDPs) – The proposed project does not create more than 50
acres of new impervious surface and is not subject to Large Project Drainage Review.
The project is within the Sunset Area Surface Mater plan Area and is subject to those
requirements.
Basin Plans (BPs) – The project is located in the East Lake Washington drainage basin.
There are no special drainage requirements in this basin.
Salmon Conservation Plans (SCPs) – The applicable SCP is the Water Resource
Inventory Area (WRIA) 8 for the Lake Washington/Cedar/Sammamish Watershed.
Within the large watershed, our project is in the Lake Washington/Cedar River. The SCP
does not appear to have stormwater management requirements more stringent than the
City of Renton stormwater code.
Stormwater Compliance Plans (SWCPs) – The project is not anticipated to impact, and is
not within an area governed by a SWCP.
Flood Hazard Reduction Plans (FHRPs) –The project site is not within a designated flood
hazard area.
Shared Facility Drainage Plan (SFDPs) – The proposed project is not within an area with
a SFDP.
Special Requirement 2 – Flood Hazard Area Delineation (1.3.2): The project site is not located
within or adjacent to a designated flood hazard area
Special Requirement 3 – Flood Protection Facilities (1.3.3): The project does not have existing
flood protection facilities, nor does it propose new flood protection facilities.
Special Requirement 4 – Source Control (1.3.4): The project does not require a commercial
building, or commercial site development permit; therefore, source controls are not applicable for the
project.
Special Requirement 5 – Oil Control (1.3.5): The project will not have high-use site characteristics,
nor is it an existing high-use site.
Special Requirement 6 – Aquifer Protection Area (1.3.6): The project will not have high-use site
characteristics, nor is it an existing high-use site. Per the city of Renton Aquifer Protection Area (APA)
map, the project site is within Zone 2, which may require open flow control and water quality treatment
Page 6
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
facilities as well as open conveyance systems to be constructed with a liner. The proposed project
includes four bioretention facilities which will capture portions of the proposed roof area. These
facilities are not being used for water quality and therefore do not need to be constructed with a liner.
Section 3 – Offsite Analysis
The following is Level 1 downstream analysis for the project site. Refer to Figure 6: Downstream
Drainage Course for a layout of the proposed discharge from the developed conditions, and the
connection to the downstream drainage path from the project site. Refer to Figure 6 for a description
of the downstream system. The downstream drainage course generally flows southwest within an
existing conveyance system. The end of the downstream analysis, approximately 1/4 mile downstream
from the site, is located just west of the intersection of Harrington Ave NE and NE Park Dr. (SR 900).
A field investigation was performed on August 25, 2016 on a clear and sunny day with a temperature
of approximately 75 degrees Fahrenheit. The onsite conditions were investigated and the downstream
drainage course was determined.
Task 1 – Study Area Definition and Maps
The study area consists of the existing park and the two single-family properties. All onsite areas
associated with the project are included in the study area. The boundaries of the project area is shown
on Figure 6.
Task 2 – Resource Review
The following resources have been reviewed for the project site.
Basin Summary
King County’s Watershed Map locates the project site in the East Lake Washington – Renton drainage
basin.
Floodway Map
A FEMA flood insurance rate map (53033C0668F) is included in Appendix B, illustrating the FEMA
flood zone designations for the site. The site is located within zone X, which are areas outside the
0.2% annual chance floodplain.
Sensitive Areas
The sensitive areas within one-mile upstream and downstream of the subject property were examined
using the King County iMAP application. According to iMAP, the following are the sensitive area
designations for the project site and within one mile downstream of the site:
SAO Erosion Hazard – The project site is not located within an erosion hazard area. There
is an erosion hazard area identified on iMAP approximately 2,200 LF west of the site along
the downstream path.
SAO Seismic Hazard – The project site is not located within a seismic hazard area. There
are no areas within one mile downstream of the site that are located within a seismic hazard
area.
Page 7
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
SAO Landslide Hazard – The project site is not located within a landslide hazard area.
There are no areas within one mile downstream of the site that are located within a landslide
hazard area.
SAO Coal Mine – The project site is not located within a coal mine area. There are no areas
within one mile downstream of the site that are located within a coal mine area.
SAO Stream – There are no sensitive streams located within the project site or within a mile
downstream of the project site.
SAO Wetland – There are no wetlands located within the project site or within one mile
downstream of the project site.
Groundwater Contamination – The project area is not located within an area designated as
being susceptible to groundwater contamination.
Sole Source Aquifer – The project area is not within a sole source aquifer area.
Channel Migration Hazard – There are no channel migration hazards for the site.
Topographic Map
The topographic information for the existing project area is shown on Figure 6: Downstream Drainage
Course. Proposed grading for the project is shown in the design drawings associated with this report.
Drainage Complaints
There are no drainage complaints within the project site or located within one mile downstream of the
site.
King County Soils Survey
According to the USDA Natural Resources Conservation Service, the site soils in the area of proposed
work are mapped as Arents, Alderwood material (AmC). Geotech Consultants, Inc. performed a
geotechnical investigation of the project area and a copy of the report is included under separate cover.
Migrating River Studies
According to King County’s iMAP program, the project site is not located within a channel migration
hazard.
303d List of Polluted Waters
According to Washington State Department of Ecology’s Water Quality Assessment map, the project
site does not contain any polluted water. The southeast area of Lake Washington, the immediate
receiving water for the downstream system, is designated as a Category 5-303d water for bacteria
(Listing ID 12193). There are no Water Quality Improvement Projects identified as part of the 303d
listing.
Water Quality Problems
According to King County’s iMAP program, the project site is not within a designated King County
water quality problem area.
Task 3 – Field Inspection
The total existing project area is 2.00 acres. The project site includes the two existing single family
properties (the single-family residences and outbuildings have been demolished) and an existing park
with a wood chip play area, basketball play area, and lawn.
Page 8
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
The site is relatively flat with a slight slope of approximately 0.5 to 1 percent towards the west. There
are no existing drainage facilities onsite. Runoff from the site generally infiltrates onsite. Any water
that does not infiltrate sheet flows towards the southwest corner of the site where it will be collected by
the existing municipal storm drainage system in Harrington Ave NE.
There is no upstream area tributary to the project site. There are parking areas located to the south and
east of the site that contain drainage systems that collect any surface runoff. The properties to the north
of the site slope towards the north and do not contribute any runoff to the site. Harrington Ave NE is
located to the west of the site and does not contribute any runoff to the site.
Task 4 – Drainage System Description and Problem Descriptions
Runoff from the project site sheet flows southwest toward Harrington Ave NE where it enters the City
of Renton ROW and flows in the gutter line to an existing catch basin. Flows from the catch basin are
then conveyed south in an existing 12-inch conveyance pipe. In proposed conditions, the underground
infiltration/detention facilities in the project area will connect to the existing 12-inch public drainage
system in Harrington Ave NE. Also refer to Figure 6 for the continuation of the downstream flow
path. The remaining downstream course is as follows:
1. The flow continues south within the 12-inch system towards the intersection of Harrington
Ave NE and NE Sunset Blvd (SR 900).
2. At the intersection, the flow continues west in NE Sunset Blvd. (SR 900), which becomes NE
Park Dr. (SR 900), for approximately 5,100 feet.
3. The public drainage system then continues northwest through a series of stormwater facilities
located within Gene Coulon, per the City of Renton stormwater map.
4. The flow continues northwest in Johns Creek for approximately 800 feet before discharging
into Lake Washington.
During the investigation there were no signs of overtopping or flooding within a quarter mile along the
flow path of the downstream drainage course. The downstream system appears to have adequate
capacity to convey the flows from the project site in the proposed conditions.
SECTION 4 – FLOW CONTROL AND WATER QUALITY FACILITY ANALYSIS
AND DESIGN
For the stormwater threshold analysis, Western Washington Hydrology Model (WWHM) was used to
model the proposed and existing conditions within the project site area. Using the areas shown above
in Table 1 and 2, the proposed improvements will result in more than a 0.1 cfs increase in the peak
100-year flow; therefore, the project is required to provide flow control per Section 1.2.3 of the
KCSWDM. All onsite soils have been classified as Type A/B. Table 3 below shows the peak flow
rates for the entire project area.
Page 9
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
Table 3 – Net Peak Flow Rates for Discharge from Project Work Area
Peak Runoff Rates for Project Work Area
Storm Event Existing Conditions Proposed Conditions Delta
2-yr 0.1820 cfs 0.4324 cfs 0.2504 cfs
10-yr 0.3094cfs 0.6416 cfs 0.3322 cfs
100-yr 0.5341 cfs 0.9404 cfs 0.4063 cfs
Existing Site Hydrology
The existing project area in the stormwater model consists of the natural lawn and limited
improvements including the single-family residences, paved asphalt court and gravel driveway.
Developed Site Hydrology
The proposed site stormwater management for the site includes two bioretention areas at the north end
of the property, which will provide stormwater mitigation for portions of Building 4, the northern most
building. Discharges from the bioretention areas will be conveyed to the detention facility located
beneath the central lawn area. The detention facility will consist of large underground arch chambers
with gravel bedding and backfill. Roof runoff from Buildings 1, 2, 4 and half of Building 3 will be
conveyed directly to the infiltration/detention facility within the central lawn area.
Runoff from the parking areas will sheet flow to the eastern and southern edges of the parking lot
where it is collected for water quality treatment in proprietary cartridge systems. Discharges from the
water quality treatment systems will discharge to a second detention facility located along the eastern
and southern edges of the parking lot. This infiltration/detention facility will consist of large 42”
diameter detention pipe. Roof runoff from the eastern half of Building 3 will be conveyed directly to
the detention facility in the parking lot.
A flow control structure will be designed for each detention facility. Discharges and overflows from
both detention facilities will be conveyed to the existing 12-inch public storm main in Harrington Ave
NE.
Performance Standards
The following is a brief description of the design standards for the proposed project site.
Flow Control Facility Standard
Page 10
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
According to the City of Renton Flow Control Application Map, the project site is located within a
Peak Rate Flow Control Standard (Existing Conditions) area. Peak Rate Flow Control Standard
requires matching the proposed peak flow rates with the existing peak flow rates for the 2-year, 10-year
and 100-year storm event, per Section 1.2.3.1.A of the RSWDMA.
Flow Control BMP Requirements
The project will incorporate bioretention areas as part of the stormwater management system. Portions
of the proposed roof area will be directed to bioretention areas prior to entering the detention facilities.
Additionally, the majority of the proposed concrete walkways and pathways will be pervious concrete
or pervious pavers.
For evaluation of the Flow Control BMP requirements per Section 5.2.1 of the KCSWDM, the entire
parcel has to be reviewed. According to King County records, the site actually occupies four parcels
totaling approximately 87,059 sf. The site is characterized as Large Lot High Impervious because the
lot area is more than 22,000 sf and the lot will have greater than 45% impervious coverage—for this
calculation all existing and proposed hard surfaces (roofs, pavement, walkways, etc.) are considered
impervious, regardless of the actual material (such as pervious pavement) that may be proposed in the
site design, as noted in Table 3.2.2.C of the KCSWDM. The total impervious surfacing throughout the
entire lot used in this calculation is approximately 53,190 sf, which is about 61% of the total lot area.
Flow Control BMPs have been applied in accordance with Section 5.2.1.3 of the KCSWDM.
Flow Control BMP requirements note that full dispersion must be evaluated for all target impervious
surfaces; full dispersion is not an option on this project due to the lack of native vegetated surfaces
onsite. Since full dispersion is not an option for this site, one or more Flow Control BMPs must be
applied to an impervious surface equal to at least 20% of the site/lot area (0.2*87,059 sf = 17,412 sf),
or 40% of the target impervious surface (0.4*53,190 sf = 22,149 sf), whichever is less. Thus, for this
project, Flow Control BMPs will attempt to be applied to an impervious area equal to at least 20% of
the site lot area.
Full Infiltration: Full infiltration was evaluated for the site and was determined to be
infeasible based on the recommendations of the geotechnical report.
Limited Infiltration: Limited infiltration was evaluated and was determined to be infeasible
based on the recommendations of the geotechnical report. The geotechnical consultant
recommends that infiltration of concentrated flow and excavated infiltration systems
(Drywells/trenches) be avoided.
Basic Dispersion: Basic dispersion was evaluated for the site and was determined to be
feasible for one downspout at the bike parking enclosure. Basic Dispersion was evaluated for
other imperious areas at the site; however, adequate space for the required vegetated flow
paths was not available. The total area proposed for Basic Dispersion is 243 SF.
Rain Garden: Four bioretention (rain garden) areas, totaling 163 square feet of bottom area
are proposed for the project to mitigate portions of the roof area for Buildings 1, 3, and 4. The
tributary roof area to the four bioretention areas is 3,202 square feet total. Refer to Figure 7 –
Proposed Conditions Sub-basin for a delineation of tributary are to each bioretention area.
Permeable Pavement: Permeable pavement, permeable pavers, and Geoblock are proposed
for the project. All pedestrian sidewalks, walkways, and community patios within the site are
proposed to be permeable pavement or permeable pavers. Permeable asphalt pavement has
been proposed for the parking stalls along the eastern and northern boundaries of the parking
area. To address water quality treatment for these stalls a 12-inch sand layer will be installed
below the pervious asphalt section. A small area of grass-filled Geoblock is proposed at the
Page 11
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
north end of the parking lot. The grass-filled Geoblock area will be gated off from the main
parking lot and will only be accessible to emergency vehicle traffic. The total permeable
pavement and paver area proposed for the project is 13,615square feet, and the total grass-
filled Geoblock area is 580 square feet.
Rainwater Harvesting: Rainwater harvesting is not proposed at the proposed site buildings.
Vegetated Roof: Vegetated roof areas are not proposed at the proposed site buildings.
Reduced Impervious Surface Credit: There are no reduced impervious credits proposed for
the project.
Native Growth Retention Credit: The project is not proposing any Native Growth Retention
Credits.
Flow Control BMP requirements for this project are met using basic dispersion, bioretention areas and
pervious pavement, pervious pavers, and Geoblock. The project was able to apply Flow Control BMPs
to approximately 17,640 square feet, which is approximately 20.2% of the total lot area. Flow Control
BMPs were evaluated for each of the target impervious areas were applied when feasible.
A geotechnical investigation was completed in 2015 by Geotech Consulting, Inc where infiltration
rates were testing in two test pits at a depth of 2.5 feet. According to the geotechnical report,
infiltration rates for the two test pits were 96 inches per hour and 60 inches per hour. The high
permeability of the surface soils demonstrates that stormwater infiltration is feasible. Bioretention
areas will therefore be used throughout the site. Refer to Figure 7 – Proposed Conditions Sub-basin for
a delineation of tributary are to each bioretention area.
A design infiltration rate of 2 inches per hour will be used for the pervious pavement calculations. In
addition, as required by Section 5.2.1.3(3), all roof downspouts are connected to the site drainage
system via a perforated pipe connection.
Conveyance System Capacity Standards
Refer to Section 5 of this report for explanation of the conveyance analysis.
Water Quality Treatment Standards
The project will provide water quality treatment for the proposed parking lot since the parking lot will
result in greater than 5,000 sf of pollution generating impervious surface (PGIS). Water quality
treatment will be provided by four separate StormFilter Cartridge treatment systems. As previously
stated pollution generating pervious surfaces will be mitigated with a landscape management plan. The
landscape management plan will be provided under separate cover.
Stormwater Discharge Control System
As mentioned previously, the project is required to provide flow control as the proposed improvements
will result in greater than 10,000 SF of new and replaced impervious surfaces. The project is located
within the Peak Rate Flow Control Standard area, per the City of Renton Flow Control Application
Map. Therefore, the project must meet the Peak Rate Flow Control Standard, which requires that the
developed discharge rates match the existing conditions peak discharge rates for the 2-year, 10-year,
and 100-year return periods, assuming the existing site conditions as the predeveloped site condition.
The site will be separated into two basins with a detention system and flow control structure provided
for each basin. Tables 4a and 4b below detail the tributary area and the existing/proposed coverage for
each basin.
Page 12
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
Table 4a –Tributary to West Detention System - Areas
Existing Conditions Proposed Conditions
sf acres sf acres
Impervious Area 11,935 0.274 31,030 0.712
Pervious Area 34,205 0.785 15,110 0.347
Total Basin Area 46,140 1.059 46,140 1.059
Table 4b –Tributary to East Detention System- Areas
Existing Conditions Proposed Conditions
sf acres sf acres
Impervious Area 5,538 0.127 19,097 0.439
Pervious Area 20,019 0.460 6,460 0.148
Total Basin Area 25,557 0.587 25,557 0.587
Due to the existing grades within the adjacent ROW and properties we were unable to capture and
detain approximately 15,362 square feet of the site area. The majority of this area is either landscaped
or pervious pavement, with approximately 1,422 square feet being asphalt paving. Per the KCSWM
Section 1.2.3.2.E, an area may bypass the onsite flow control facility if; the area converges less than 1
quarter-mile downstream of the facility’s project site, and the increase in existing site conditions 100-
year peak discharge from the area of bypassed target surfaces does not exceed 0.4 cfs. The area that
was not captured and detained will converge less than 1-quarter mile downstream. Additionally, model
analysis showed the predeveloped 100-year flow rate for the area that was not captured is 0.063 cfs,
and the mitigated 100-year flow rate is 0.097 cfs. The increase is 0.034 cfs over the existing 100-year
flow rate, this is less than the threshold. Additionally flow control BMPs have been applied to new
imperious surfaces within the bypass area where feasible. The proposed sidewalk areas within the
bypass area will be permeable concrete. It was not feasible to apply flow control BMPs to the western
most portion of the proposed asphalt driveway as discussed previously in Section 4. Therefore the
detention facility in the Eastern Basin has been sized to provide compensatory storage for the 1,422 SF
(0.033 ac) of asphalt area. This results in the Eastern Basin detention facility being sized for a 0.62 ac
basin. Due to the small amount of area that is PGIS, it does not trigger water quality treatment and
does not require compensatory are to be mitigated. Refer to Appendix B for the WWHM summary
report of the bypass area.
The detention systems and flow control structures for the West and East Basins were determined using
WWHM. Refer to the Appendix B for WWHM summary reports and design calculations, including all
background information.
The proposed discharge control structures were designed by comparing the estimated peak runoff rate
of the existing conditions to the theoretical unmitigated peak runoff rate of the proposed field with a
crushed rock base. In the WWHM model, the proposed field surfaces were modeled as pervious
(grass), while the existing conditions were modeled as grass and impervious surface.
The results of the WWHM Stormwater modeling indicate that a flow control riser with a bottom orifice
provide discharge control that releases stormwater at peak rates closely resembling the existing peak
Page 13
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
flow rates for the 2-yr, 10-yr, and 100-yr, 24-hr storm from the respective basins. The orifice diameter
and other design information for the two discharge control structures are provided as part of the Design
Documents associated with this report. Table 5a and 5b, below, show the mitigated peak runoff rates
released from the flow control structures for each basin. Per the results of the stormwater model, the
required storage volume for the West Basin is 1,495 CF. A StormTech Chamber system will provide
detention for the West Basin providing 1,565 CF of storage. According to the Stormwater model, the
required storage volume for the East Basin is 1,873 CF. A 3-ft diameter, 265 LF detention pipe will
provide detention for the East Basin with 1,873 CF of storage. WWHM summary reports for each
basin are included in Appendix B.
Table 5a –West Detention System - Mitigated Peak Runoff Rates
Mitigated Peak Runoff Rates (cubic feet/sec)
Storm Event Existing Conditions Proposed Conditions Delta
2-yr, 24-hr storm 0.108 cfs 0.106 cfs -0.002 cfs
10-yr, 24-hr storm 0.179cfs 0.164 cfs -0.015 cfs
100-yr, 24-hour storm 0.300 cfs 0.260 cfs -0.040 cfs
Table 5b –East Detention System - Mitigated Peak Runoff Rates
Mitigated Peak Runoff Rates (cubic feet/sec)
Storm Event Existing Conditions Proposed Conditions Delta
2-yr, 24-hr storm 0.0519cfs 0.0517 cfs -0.002 cfs
10-yr, 24-hr storm 0.090 cfs 0.087 cfs -0.003 cfs
100-yr, 24-hour storm 0.159 cfs 0.150cfs -0.009 cfs
Water Quality System
As discussed previously a Declaration of Covenant the use of leachable metals on the property has
been signed by the owner. This Declaration of Covenant was completed in lieu of providing Enhanced
Basic Treatment. Basic water quality treatment will be provided for the 16,765 SF proposed parking
lot. The parking lot will be separated into 4 basins for water quality treatment. Each of the basins will
sheet flow to one of four StormFilter Cartridge Treatment systems. The StormFilter Cartridges will
have 18-inch cartridges which are approved for 7.5 gpm/cartridge or 0.0167 CFS/cartridge. Three of
the systems will discharge to the proposed detention pipe within the parking lot, while the fourth
system will collect un-detained flow that will then tie into to the site discharge pipe.
Per Section 6.5.5.1 of the KCSWDM manual, the Stormfilter sizing is based on water quality design
flow and a mass loading method. The water quality design flow is based on 35% of the developed two-
year peak flow rate, modeled with 15-minute time steps when the facility is preceding the detention or
there is no detention. Table 6, below, summarizes the tributary area to each StormFilter Cartridge
Treatment system, the on-line water quality flow rates, and the minimum number of cartridges
required. The water quality flow rate was determined using WWHM and a summary report for each
basin is included in Appendix B. Refer to Figure 7 – Proposed Conditions Sub-basins for a delineation
of each water quality sub-basin.
Page 14
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
Table 6 –Water Quality Basins - Mitigated Peak Runoff Rates
Mitigated Peak Runoff Rates (cubic feet/sec)
Basin Impervious
Area (acres)
Pervious Area
(acres) WQ Flow Rate # of Cartridges
required
WQ Basin A 0.098 0.012 (0.04507)*35%=0.0158 cfs 1
WQ Basin B 0.129 0.075 0.060956*35%=0.0213cfs 2
WQ Basin C 0.124 0.055 0.058017*35%= 0.0203cfs 2
WQ Basin D 0.038 0.022 0.017953*35%=0.00628 cfs 1
SECTION 5 – CONVEYANCE SYSTEMS ANALYSIS AND DESIGN
The proposed conveyance system will be designed to convey the 25-year peak flow rate of the
developed site. The system is allowed to overtop during the 100-year peak flow provided that it does
not create or aggravate a severe flooding problem.
The East Basin tributary to the detention pipe is separated into four sub-basins for water quality
treatment by the StormFilter Cartridge systems. Discharges from each cartridge system to the detention
pipe will be via an 8-inch pipe at a minimum slope of 0.5%. The capacity of an 8-inch pipe at 0.5%
slope is 0.93 cfs. The maximum 25-year peak flow rate from any of the four water quality sub-basins is
0.11 cfs; therefore, there is adequate capacity within the East Basin to convey the 25-year storm event.
The West Basin tributary to the StormTech Chamber system could be divided into two sub-basins for
this conveyance evaluation. The eastern sub-basin of the western basin would include the roof area of
Building 3, and the western sub-basin of the west basin would include the remaining areas. Discharges
from the eastern sub-basin enter the StormTech chambers via an 8-inch pipe at a slope of 0.5% on the
east side of the chambers. Discharges from the western sub-basin enter the StormTech chambers via an
8-inch pipe at a slope of 0.5 % at the northwest corner of the chambers. Again, the capacity of an 8-
inch pipe at 0.5% slope is 0.93 cfs.
The eastern sub-basin results in an estimated 25-year peak flow rate of 0.15 cfs. This is less than the
capacity of the 8-inch pipe, thus, we infer that the specified 8-inch pipe at a minimum slope of 0.5%
will be sufficient to convey the 25-year storm.
The western sub-basin results in an estimated 25-year peak flow rate of 0.12 cfs. The capacity of an 8-
inch pipe at 0.5% is adequate for the sub-basin runoff prior to discharging into the StormTech
Chamber system. In all locations upstream of the final 8-inch pipe, the conveyance system consists of
8-inch pipes at a minimum slope of 0.5%. As the tributary area for these pipes are smaller, we infer that
the system upstream has sufficient capacity to convey the 25-year storm.
The bypass area will be conveyed stormwater downstream through 8-inch pipes. The low 100-year
flow rate of the bypass area is not anticipated to cause a capacity concern for the stormdrains. The
combined flows off both basins and the bypass area will result in 0.51 cfs for the 25-year flow rate and
0.58 cfs for the 100-year flow rate. Stormwater from the entire site will be routed to a public 12-inch
storm pipe located in Harrington Ave NE, which has a total capacity of 2.97 cfs. Per the conveyance
Page 15
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
analysis completed for the Harrington Ave NE Stormwater Retrofit Project, which included installation
of the 12-inch pipe which the project is discharging to, the existing contributing flow to the pipe is 1.92
cfs. Therefore combined 25-year flow rate is 2.43 cfs. Since Capacity is 2.97 cfs flow in the pipe will
be at 82% of capacity so it is not anticipated to be an issue. This conveyance pipe begins at the
intersection of Glenwood Ave NE and Harrington Ave NE, just north of project area.
SECTION 6 – SPECIAL REPORTS AND STUDIES
A geotechnical investigation was performed by Geotech Consultants, Inc. The report is dated October
15, 2015. Field investigation, which included 10 test pits and 3 test holes onsite, was completed in late
August and early September of 2015. A copy of the report is included under separate cover.
SECTION 7 – OTHER PERMITS
An NPDES permit from the Washington State Department of Ecology will be required for the project
because it disturbs over one acre of land area. There are no additional permits required from other
agencies for this project.
SECTION 8 – CSWPPP ANALYSIS AND DESIGN
The Construction Stormwater Pollution Prevention Plan (CSWPPP) consists of the TESC plan in the
drawing set and a Stormwater Pollution Prevention and Spill (SWPPS) plan per the RSWDMA. A
TESC plan and SWPPS report is included with this submittal. The TESC plan includes temporary
sediment trap to comply with City of Renton stormwater regulations. Stormwater runoff from the
project work area will be intercepted with silt fence, and then will be collected at the temporary
sediment trap. The temporary sediment trap will discharge to the new site stormwater connection,
which will be installed prior to the contractor initiating any land disturbing activities. TESC elements
in the project include the following:
Temporary Stabilized Construction Entrance, per COR Std Plan 215.10
Catch Basin Filters, per COR Std Plan 216.30
Silt Fence, per COR Std Plan 214.00
Temporary Sediment Trap, per COR Std Plan 211.00
The TESC elements shown are intended to be the minimum allowable. The NPDES permit will require
periodic inspection of the TESC elements to confirm they are holding up and continuing to function as
intended. During construction, the contractor is responsible for upgrading these facilities as necessary.
The implementation of the TESC plan and construction maintenance, replacement and upgrading of
the TESC facilities are the responsibility of the contractor per the contract documents. The TESC
facilities will be constructed prior to, and in conjunction with all clearing and grading activity
furthermore in a manner in which sediment or sediment laden water does not leave the project site,
enter the drainage system, or violate applicable water quality standards.
SECTION 9 – BOND QUANTITIES, FACILITY SUMMARIES, AND DECLARATION
OF COVENANT
The Bond Quantities Worksheet has been prepared and is included in Appendix E of this TIR.
Page 16
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
A Facility Summary and sketch will be required for each of the detention and water quality facilities
proposed for the project. Per the RSWDMA these are to be provided following approval of the plans.
Based on previous conversations with City of Renton officials, it appears the following Declarations of
Covenant will be required, and will be provided prior to final permit approval:
Reference 8-J, Drainage Facility Covenant
Reference 8-M, Flow Control BMP Covenant
Reference 8-Q, Leachable Material Covenant
Surety Agreement – provided at preconstruction meeting
SECTION 10 – OPERATIONS AND MAINTENANCE MANUAL
The applicable Operations and Maintenance recommendations from Appendix A of the KCSWDM are
included in Appendix D of this TIR.
Sunset Court Apartments
Technical Information Report
Submitted: November 30, 2016, Re-submitted: May 4, 2017 and June 29, 2017
FIGURES
Figure 1: TIR Worksheet
Figure 2: Vicinity Map
Figure 3: Soils Map
Figure 4: Existing Conditions
Figure 5: Proposed Conditions
Figure 6: Downstream Drainage Course
Figure 7: Proposed Conditions Sub-Basins
engineering pllc
1932 First Ave,
Suite 201,
Seattle, WA 98101
p. 206.725.1211
f. 206.973.5344
www.lpdengineering.com
2015 LPD Engineering PLLC©
SUNSET COURT APARTMENTS
2VICINTY MAP
engineering pllc
7936 Seward Park Ave S,
Seattle, WA 98118
p. 206.725.1211
f. 206.973.5344
www.lpdengineering.com
Sunset Court Apartments
3Soils Map and Legend
HARRINGTON AVE NE
HA
R
R
I
N
G
T
O
N
P
L
N
E
-
V
A
C
A
T
E
D
11TH AVE NGLENNWOOD AVE NEHa
r
r
i
n
g
t
o
n
P
l
N
E
7936 Seward Park Ave S,Seattle, WA 98118p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllc2011 LPD Engineering PLLC©SUNSET COURT4Existing Conditions
15346.08CP109348.73CP110349.05CP112347.46CP121349.60RC122348.60RC138346.22RC 142348.95RC147349.49RC1165349.32CP7936 Seward Park Ave S,Seattle, WA 98118p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllc2016 LPD Engineering PLLC©Sunset Court Apartments5Proposed Conditions
121349.60RC122348.60RC138346.22RC 142348.95RC147349.49RC50ToSet51ToSet52ToSet53ToSet54ToSet55ToSet56ToSet57ToSet58ToSet60Search-Set61Search-Set62Search-Set63Search-Set64Search-Set66Search-Set67Search-Set74Search-SetHARRINGTON AVE NE
HA
R
R
I
N
G
T
O
N
P
L
N
E
-
V
A
C
A
T
E
D GLENNWOOD AVE NEHa
r
r
i
n
g
t
o
n
P
l
N
E
7936 Seward Park Ave S,Seattle, WA 98118p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllc2016 LPD Engineering PLLC©Sunset Court Apartments7Proposed Conditions Sub-Basins
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
APPENDIX A
Not Used
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSI ONNOTG
STATATWFOENIHS EREDREGISLAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSSHEET INDEXVICINITY MAP
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcP ROEER ALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R R CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
11NOT USED10MOVEABLE SUMP AND PUMP4INTERCEPTOR SWALE1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS9CITY OF RENTON STD 211.00 - SEDIMENT TRAP6CITY OF RENTON STD 214.00 - SILT FENCE8CONSTRUCTION FENCING7SILT DIKE3TREE PROTECTION FENCING2CITY OF RENTON STD 215.10 - STABILIZED CONSTRUCTION ENTRANCE1CITY OF RENTON STD 216.30- CATCH BASIN FILTER5CITY OF RENTON STD 213.30 - PLASTIC COVERING
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcP ROEER ALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R R CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcP ROEER ALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R R CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
2'-412"2'-212"5'-3"2'-312"1'-1012"3"6'-0"4'-0"3'-4"8"1'-034"2 1/2"314"212"111-CARTRIDGE CATCHBASIN - PLAN VIEWC2B21134"1A1-CARTRIDGE CATCHBASIN - SECTION VIEW2B1-CARTRIDGE CATCHBASIN - SECTION VIEW2C1-CARTRIDGE CATCHBASIN - SECTION VIEW311-CARTRIDGE CATCHBASIN - TOP VIEW33" TO 35"(2.75' TO 2.9')6'-0"3'-0"1'-6"1'-8"1'-5"1A1'-634"CONFIGURATIONSTRUCTURE IDWATER QUALITY FLOW RATE (cfs)PEAK FLOW RATE (<1 cfs) RETURN PERIOD OF PEAK FLOW (yrs)CARTRIDGE FLOW RATE (15 OR 7.5 gpm)MEDIA TYPE (CSF, PERLITE, ZPG)RIM ELEVATIONPIPE DATA: I.E. MATERIAL DIAMETERINLETOUTLETOPTIONS (AVAILABLE AT EXTRA COST):1CARTRIDGE CONCRETECATCH BASIN STORMFILTER DATAOUTLETINLETHOLE FOR OUTLET STUB OTHER THAN 12"CLEAN-OUT IN WEIR OTHER THAN 4"CORED HOLE FOR INLET PIPEDEEP OUTLET CORINGOTHER:SD #310.01550.07611007.5ZPG348.91'348.91' - -346.60' PVC 8"XXXOUTLET PIPE1/2" PVC WEIR1/2" PVC BAFFLE4"Ø CLEAN OUTWITH PLUG1/2" PVC BAFFLE4"Ø CLEAN OUT WITH PLUG1/2" PVC WEIRCONFIGURATIONSTRUCTURE IDWATER QUALITY FLOW RATE (cfs)PEAK FLOW RATE (<1 cfs) RETURN PERIOD OF PEAK FLOW (yrs)CARTRIDGE FLOW RATE (15 OR 7.5 gpm)MEDIA TYPE (CSF, PERLITE, ZPG)RIM ELEVATIONPIPE DATA: I.E. MATERIAL DIAMETERINLETOUTLETOPTIONS (AVAILABLE AT EXTRA COST):1CARTRIDGE CONCRETECATCH BASIN STORMFILTER DATAOUTLETINLETHOLE FOR OUTLET STUB OTHER THAN 12"CLEAN-OUT IN WEIR OTHER THAN 4"CORED HOLE FOR INLET PIPEDEEP OUTLET CORINGOTHER:SD #20.00730.03941007.5ZPG347.00'347.00' - -344.70' PVC 8"XXX2'-4"INSIDE RIMFLOWA514"2'-0"INSIDE2'-012"OUTSIDEB2'-0"2'-8"6'-9"5"5"7'-1"OUTSIDE RIM2'-4"INSIDE RIM2'-4"INSIDE RIM2'-4"INSIDE RIM2'-0"BBH6"AAINLET STUB(OPTIONAL)OUTLET STUBOUTLET PIPEFROM FLOWKITFILTRATIONBAY INLETPERMANENT POOL LEVELACCESS COVERCONCRETE COLLARAND REBAR TO MEETHS20 IF APPLICABLE BYCONTRACTOROPTIONAL SLOPED LIDCORNER ELEVATIONSTO BE SPECIFIED BYENGINEERSTORMFILTERCARTRIDGE TYP.FLOWKIT TYP.CLEANOUTACCESS PLUGON WEIR WALLPERMANENTPOOL ELEVATIONCARTRIDGESUPPORT TYP.CATCHBASIN FOOT(TYP. OF 4)FINISHED GRADEWEIR WALLFLOATABLES BAFFLELIFTING EYE(TYP. OF 4)VANED INLET GRATE(SOLID COVEROPTIONAL)1'-0"COLLARPLAN VIEWSECTION A-ASECTION B-BCATCHBASIN FOOT(TYP. OF 4)FILTRATIONBAY INLET TYP.OUTLETINLETCONFIGURATIONSSTRUCTURE IDWATER QUALITY FLOW RATE (cfs)PEAK FLOW RATE (<1.8 cfs) RETURN PERIOD OF PEAK FLOW (yrs)CARTRIDGE FLOW RATE (gpm)MEDIA TYPE (CSF, PERLITE, ZPG, GAC, PHS)RIM ELEVATIONPIPE DATA: I.E. DIAMETERINLET STUBOUTLET STUBNOTES/SPECIAL REQUIREMENTS:2-CARTRIDGE DEEP CATCHBASINSTORMFILTER DATASLOPED LIDSOLID COVEROUTLETINLETOUTLETINLETINLETINLETSD #290.02490.13381007.5ZPG348.20'348.20' -346.30' 8"NONOCARTRIDGE HEIGHTSPECIFIC FLOW RATE (gpm/sf)CARTRIDGE FLOW RATE (gpm)MINIMUM HYDRAULIC DROP (H)27"18"18" DEEP3.05'2.3'3.3'2 gpm/ft²22.51 gpm/ft²2 gpm/ft²1 gpm/ft²2 gpm/ft²1 gpm/ft²11.25157.5157.5STORMFILTER TREATMENT CAPACITY IS A FUNCTION OF THE CARTRIDGE SELECTION AND THE NUMBER OF CARTRIDGES. 2 CARTRIDGE CATCHBASIN HAS A MAXIMUMOF TWO CARTRIDGES. SYSTEM IS SHOWN WITH A 27" CARTRIDGE, AND IS ALSO AVAILABLE WITH AN 18" CARTRIDGE. STORMFILTER CATCHBASIN CONFIGURATIONSARE AVAILABLE WITH A DRY INLET BAY FOR VECTOR CONTROL.PEAK HYDRAULIC CAPACITY PER TABLE BELOW. IF THE SITE CONDITIONS EXCEED PEAK HYDRAULIC CAPACITY, AN UPSTREAM BYPASS STRUCTURE IS REQUIRED.CARTRIDGE SELECTIONINLET PERMANENT POOL LEVEL (A)1'-0" 1'-0" 2'-0"PEAK HYDRAULIC CAPACITY 1.0 1.0 1.8OVERALL STRUCTURE HEIGHT (B)4'-9" 3'-9" 4'-9"OUTLETINLETCONFIGURATIONSSTRUCTURE IDWATER QUALITY FLOW RATE (cfs)PEAK FLOW RATE (<1.8 cfs) RETURN PERIOD OF PEAK FLOW (yrs)CARTRIDGE FLOW RATE (gpm)MEDIA TYPE (CSF, PERLITE, ZPG, GAC, PHS)RIM ELEVATIONPIPE DATA: I.E. DIAMETERINLET STUBOUTLET STUBNOTES/SPECIAL REQUIREMENTS:2-CARTRIDGE DEEP CATCHBASINSTORMFILTER DATASLOPED LIDSOLID COVEROUTLETINLETOUTLETINLETINLETINLETSD #260.02390.12491007.5ZPG347.22'347.22' -344.90' 8"NONO1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS1SECTION A-A: DETENTION PIPETHIS PRODUCT MAY BE PROTECTED BY ONE OR MORE OF THE FOLLOWINGU.S. PATENTS: 5,322,629; 5,524,576; 5,707,527; 5,985,157; 6,027,639; 6,649,048;RELATED FOREIGN PATENTS, OR OTHER PATENTS PENDING.www.ContechES.com800-338-1122 513-645-7000 513-645-7993 FAX9025 Centre Pointe Dr., Suite 400, West Chester, OH 450692CONCRETE CATCHBASIN STORMFILTER - 1 CARTRIDGE UNIT3CONCRETE CATCHBASIN STORMFILTER - 2 CARTRIDGE UNITTHIS PRODUCT MAY BE PROTECTED BY ONE OR MORE OF THE FOLLOWINGU.S. PATENTS: 5,322,629; 5,524,576; 5,707,527; 5,985,157; 6,027,639; 6,649,048;RELATED FOREIGN PATENTS, OR OTHER PATENTS PENDING.www.ContechES.com800-338-1122 513-645-7000 513-645-7993 FAX9025 Centre Pointe Dr., Suite 400, West Chester, OH 45069
3COR STD PLAN 202.00 - CB INSTALLATION2COR STD PLAN 201.00 - CB TYPE 21COR STD PLAN 200.00 - CB TYPE 11932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS724" BOLT-LOCKING MANHOLE RING & COVER6COR STD PLAN 204.40-RECTANGULAR GRATE5COR STD PLAN 204.00 - RECTANGULAR FRAME“”
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcP ROEER ALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFAR RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS1COR STD PLAN 204.60 - MISCELLANEOUS DRAINAGE DETAILS3FOOTING DRAIN2CLEAN-OUT TO GRADE7BIO-RETENTION AREA5FLOW CONTROL STRUCTURE (FCS) 14DETENTION TANK ACCESS DETAIL6COR STD PLAN 101.1 - CURB INSTALL AT CATCH BASINS
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS©2013 ADS, INC.PROJECT INFORMATIONADS SALES REP:ENGINEEREDPRODUCTMANAGER:PROJECT NO:ADVANCED DRAINAGE SYSTEMS, INC.SUNSET COURT LLLPRENTON, WASHINGTON169073JOE SHEEHY253-255-6302JOE.SHEEHY@ADS-PIPE.COMBRAD BARRON206-406-0141BRAD.BARRON@ADS-PIPE.COMSTORMWATER CHAMBER SPECIFICATIONS1. CHAMBERS SHALL BE STORMTECH SC-740, SC-310, OR APPROVED EQUAL.2. CHAMBERS SHALL BE MANUFACTURED FROM VIRGIN POLYPROPYLENE OR POLYETHYLENE RESINS.3. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORT PANELS THATWOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.4. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURETHAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1)LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATIONFOR IMPACT AND MULTIPLE VEHICLE PRESENCES.5. CHAMBERS SHALL MEET ASTM F2922 (POLYETHYLENE) OR ASTM F2418-16 (POLYPROPYLENE), "STANDARD SPECIFICATION FORTHERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".6. CHAMBERS SHALL BE DESIGNED AND ALLOWABLE LOADS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICEFOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".7. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. THE CHAMBER MANUFACTURER SHALLSUBMIT THE FOLLOWING UPON REQUEST TO THE SITE DESIGN ENGINEER FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THEPROJECT SITE:a. A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE SAFETYFACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTMF2787 AND BY AASHTO FOR THERMOPLASTIC PIPE.b. A STRUCTURAL EVALUATION SEALED BY A REGISTERED PROFESSIONAL ENGINEER THAT DEMONSTRATES THAT THE LOADFACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET. THE 50 YEAR CREEPMODULUS DATA SPECIFIED IN ASTM F2418 OR ASTM F2922 MUST BE USED AS PART OF THE AASHTO STRUCTURAL EVALUATIONTO VERIFY LONG-TERM PERFORMANCE.c. STRUCTURAL CROSS SECTION DETAIL ON WHICH THE STRUCTURAL EVALUATION IS BASED.8. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-310/SC-740 SYSTEM1. STORMTECH SC-310 & SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED APRE-CONSTRUCTION MEETING WITH THE INSTALLERS.2. STORMTECH SC-310 & SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/SC-780 CONSTRUCTIONGUIDE".3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.STORMTECH RECOMMENDS 3 BACKFILL METHODS:xSTONESHOOTER LOCATED OFF THE CHAMBER BED.xBACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.xBACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS.7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm).8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGNENGINEER.9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACESTORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.NOTES FOR CONSTRUCTION EQUIPMENT1. STORMTECH SC-310 & SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTIONGUIDE".2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-310 & SC-740 CHAMBERS IS LIMITED:xNO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.xNO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCEWITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".xWEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT ANACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECHSTANDARD WARRANTY.CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT.
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPROEERALENGINFESSIO NNOTG
STATATWFOENIHSEREDREGISLAURIEJ.PFAR R CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS3ADA SIGN W/POST4CONCRETE STRIP AND WALKWAY1ASPHALT PAVEMENT2GRASS-FILLED GEOBLOCK PERVIOUS SURFACE8ASPHALT/CONCRETE TRANSITION7CONCRETE RAMP6PERVIOUS ASPHALT PAVEMENT5ADA STALL AND BLOCKOUT STRIPING
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS3PLASTIC WHEEL STOP1PERVIOUS CONCRETE SIDEWALK2CONCRETE VERTICAL CURB TYPICALCLCLCLCL6COR STD PLAN 101 - CEMENT CONCRETE CURBS5SPEED HUMP4FLUSH CONCRETE VERTICAL CURB7COR STD PLAN 103 - CURB AND GUTTER REPLACEMENT DETAILS8CURB TAPER
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcP ROEER ALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFAR RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSI ONNOTG
STATATWFOENIHS EREDREGISLAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS1SEWER LINE PROFILE2WATER LINE PROFILE
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS3COR STD PLAN 310.1 - FIRE HYDRANT ASSEMBLY2COR STD PLAN 300.3 - CUT IN1COR STD PLAN 300.0 - WATER PLAN GENERAL NOTES4OR STD PLAN 360.5 - CHECK VALVE ASSEMBLY72" BLOW-OFF PERMANENT ASSEMBLY6COR STD PLAN 330.2 - CONCRETE THRUST BLOCKING5COR STD PLAN 310.3 - HYDRANT MARKER LAYOUT
1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS2COR STD PLAN 400.1 - STANDARD SANITARY MANHOLE1TRENCH DRAIN4WSDOT STD PLN B-30.70-03 CIRCULAR FRAME (RING) AND COVER7COR STD PLAN 401 - MANHOLE FRAME AND COVER6COR STD PLAN 403.1 - 8" OR 6" SSCO5COR STD PLAN 406.1 - STANDARD SIDE SEWER INSTALLATION8CDF TRENCH BACKFILL
HARRINGTON AVE NEHARRINGTON PL NE - VACATED11TH AVE NGLENNWOOD AVE NEHarrington Pl NE 1932 First AveSuite 201Seattle, WA 98101p. 206.725.1211f. 206.973.5344www.lpdengineering.comengineering pllcPRO EERALENGINFESSIONNOTGSTATATWFOENIHSEREDREGIS
LAURIEJ.PFA R RCITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDS
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
APPENDIX B
Design Calculations
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Sunset Court Peak Flow Rates
Site Name: Renton Housing Authority
Site Address: Sunset Court
City : Renton
Report Date: 6/19/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Sunset Court
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat 1.59
Pervious Total 1.59
Impervious Land Use acre
ROADS FLAT 0.26
ROOF TOPS FLAT 0.15
Impervious Total 0.41
Basin Total 2
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : East Basin
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .878
Pervious Total 0.878
Impervious Land Use acre
ROOF TOPS FLAT 0.587
SIDEWALKS FLAT 0.153
PARKING FLAT 0.382
Impervious Total 1.122
Basin Total 2
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.59
Total Impervious Area:0.41
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.878
Total Impervious Area:1.122
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.182027
5 year 0.253632
10 year 0.309425
25 year 0.390247
50 year 0.458499
100 year 0.534128
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.432467
5 year 0.555343
10 year 0.641639
25 year 0.756544
50 year 0.846547
100 year 0.94044
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.229 0.558
1950 0.321 0.599
1951 0.185 0.372
1952 0.125 0.309
1953 0.133 0.332
1954 0.157 0.358
1955 0.158 0.394
1956 0.158 0.388
1957 0.177 0.441
1958 0.143 0.355
1959 0.145 0.362
1960 0.163 0.357
1961 0.151 0.376
1962 0.131 0.328
1963 0.155 0.369
1964 0.146 0.357
1965 0.194 0.460
1966 0.123 0.304
1967 0.299 0.527
1968 0.239 0.594
1969 0.166 0.413
1970 0.160 0.399
1971 0.191 0.475
1972 0.295 0.546
1973 0.119 0.297
1974 0.174 0.434
1975 0.200 0.500
1976 0.138 0.338
1977 0.146 0.364
1978 0.179 0.445
1979 0.244 0.609
1980 0.219 0.547
1981 0.179 0.447
1982 0.253 0.630
1983 0.206 0.513
1984 0.131 0.324
1985 0.179 0.446
1986 0.155 0.387
1987 0.239 0.596
1988 0.146 0.363
1989 0.182 0.453
1990 0.618 0.939
1991 0.326 0.655
1992 0.129 0.321
1993 0.111 0.278
1994 0.122 0.303
1995 0.159 0.396
1996 0.283 0.467
1997 0.201 0.431
1998 0.167 0.415
1999 0.393 0.850
2000 0.172 0.424
2001 0.186 0.465
2002 0.217 0.542
2003 0.178 0.426
2004 0.319 0.795
2005 0.147 0.364
2006 0.164 0.341
2007 0.644 0.885
2008 0.331 0.629
2009 0.222 0.553
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.6441 0.9393
2 0.6183 0.8852
3 0.3927 0.8496
4 0.3313 0.7950
5 0.3261 0.6553
6 0.3212 0.6304
7 0.3192 0.6285
8 0.2993 0.6092
9 0.2952 0.5987
10 0.2827 0.5965
11 0.2529 0.5943
12 0.2443 0.5581
13 0.2392 0.5529
14 0.2385 0.5466
15 0.2294 0.5464
16 0.2218 0.5420
17 0.2194 0.5273
18 0.2174 0.5131
19 0.2058 0.4995
20 0.2015 0.4753
21 0.2004 0.4668
22 0.1938 0.4646
23 0.1907 0.4603
24 0.1864 0.4526
25 0.1848 0.4471
26 0.1816 0.4460
27 0.1793 0.4450
28 0.1789 0.4405
29 0.1785 0.4336
30 0.1782 0.4307
31 0.1770 0.4264
32 0.1740 0.4241
33 0.1718 0.4152
34 0.1666 0.4131
35 0.1657 0.3987
36 0.1636 0.3964
37 0.1635 0.3945
38 0.1601 0.3883
39 0.1590 0.3866
40 0.1582 0.3763
41 0.1575 0.3721
42 0.1567 0.3690
43 0.1551 0.3638
44 0.1547 0.3638
45 0.1511 0.3626
46 0.1467 0.3624
47 0.1464 0.3576
48 0.1459 0.3571
49 0.1457 0.3570
50 0.1453 0.3553
51 0.1425 0.3406
52 0.1382 0.3379
53 0.1334 0.3325
54 0.1315 0.3277
55 0.1311 0.3244
56 0.1286 0.3205
57 0.1246 0.3085
58 0.1230 0.3040
59 0.1221 0.3026
60 0.1192 0.2971
61 0.1113 0.2776
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0 acre-feet
On-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
l •
:>L(;;E -$ClU!oCI "0: G o-..AL -=>-' "5:».::F-.;-C ;; -__
~ 3..,. T~ ~a J -:: :;-, ..... .£-=' ~ _-s:;~ :.:l\a.___"'-._-,,l',:. ~-=G?~WME,..=•3r "'c.. :::uGE ~E .JREGON K-SN-65 FL 17 -29 FLOWN 7 -6 -65;SCALE 1"=400' SEC 9, T 23 N-R 5 E
PROJECT SITE
KING COUNTY ROAD SERVICE MAP - 1965
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Sunset Court West Basin
Site Name: Renton Housing Authority
Site Address: Sunset Court
City : Renton
Report Date: 6/28/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin West
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .789
Pervious Total 0.789
Impervious Land Use acre
ROOF TOPS FLAT 0.1
SIDEWALKS FLAT 0.17
Impervious Total 0.27
Basin Total 1.059
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin West
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .373
Pervious Total 0.373
Impervious Land Use acre
ROOF TOPS FLAT 0.512
SIDEWALKS FLAT 0.0638
Impervious Total 0.5758
Basin Total 0.9488
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : Basin Roof 3
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .013
Pervious Total 0.013
Impervious Land Use acre
ROOF TOPS FLAT 0.024
SIDEWALKS FLAT 0.003
Impervious Total 0.027
Basin Total 0.04
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 3 Surface retention 3
___________________________________________________________________
Name : Basin Roof 2
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .015
Pervious Total 0.015
Impervious Land Use acre
ROOF TOPS FLAT 0.024
SIDEWALKS FLAT 0.005
Impervious Total 0.029
Basin Total 0.044
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 2 Surface retention 2
___________________________________________________________________
Name : Bioretention 3
Bottom Length: 17.50 ft.
Bottom Width: 3.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: GRAVEL
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Wetted surface area On
Total Volume Infiltrated (ac-ft.): 4.487
Total Volume Through Riser (ac-ft.): 0
Total Volume Through Facility (ac-ft.): 4.487
Percent Infiltrated: 100
Total Precip Applied to Facility: 0.346
Total Evap From Facility: 0.107
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 3 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
348.50 0.0073 0.0000 0.0000 0.0000
348.53 0.0072 0.0000 0.0000 0.0000
348.55 0.0071 0.0000 0.0001 0.0001
348.58 0.0069 0.0000 0.0003 0.0003
348.61 0.0068 0.0001 0.0007 0.0007
348.64 0.0066 0.0001 0.0012 0.0012
348.66 0.0065 0.0001 0.0019 0.0019
348.69 0.0064 0.0001 0.0028 0.0028
348.72 0.0062 0.0002 0.0038 0.0038
348.75 0.0061 0.0002 0.0039 0.0039
348.77 0.0060 0.0002 0.0041 0.0041
348.80 0.0058 0.0002 0.0043 0.0043
348.83 0.0057 0.0003 0.0045 0.0045
348.86 0.0056 0.0003 0.0047 0.0047
348.88 0.0054 0.0003 0.0049 0.0049
348.91 0.0053 0.0003 0.0051 0.0051
348.94 0.0052 0.0004 0.0053 0.0053
348.97 0.0051 0.0004 0.0055 0.0055
348.99 0.0049 0.0004 0.0057 0.0057
349.02 0.0048 0.0005 0.0059 0.0059
349.05 0.0047 0.0005 0.0061 0.0061
349.08 0.0046 0.0006 0.0063 0.0063
349.10 0.0044 0.0006 0.0065 0.0065
349.13 0.0043 0.0006 0.0067 0.0067
349.16 0.0042 0.0007 0.0069 0.0069
349.19 0.0041 0.0007 0.0071 0.0071
349.21 0.0040 0.0008 0.0073 0.0073
349.24 0.0039 0.0008 0.0076 0.0076
349.27 0.0038 0.0009 0.0078 0.0078
349.30 0.0036 0.0009 0.0080 0.0080
349.32 0.0035 0.0010 0.0083 0.0083
349.35 0.0034 0.0010 0.0085 0.0085
349.38 0.0033 0.0011 0.0087 0.0087
349.41 0.0032 0.0011 0.0090 0.0090
349.43 0.0031 0.0012 0.0092 0.0092
349.46 0.0030 0.0012 0.0094 0.0094
349.49 0.0029 0.0013 0.0097 0.0097
349.52 0.0028 0.0014 0.0099 0.0099
349.54 0.0027 0.0014 0.0102 0.0102
349.57 0.0026 0.0015 0.0104 0.0104
349.60 0.0025 0.0016 0.0107 0.0107
349.63 0.0024 0.0016 0.0110 0.0110
349.65 0.0023 0.0017 0.0112 0.0112
349.68 0.0022 0.0018 0.0115 0.0115
349.71 0.0021 0.0018 0.0117 0.0117
349.74 0.0020 0.0019 0.0120 0.0120
349.76 0.0020 0.0020 0.0123 0.0123
349.79 0.0019 0.0021 0.0126 0.0126
349.82 0.0018 0.0021 0.0128 0.0128
349.85 0.0017 0.0022 0.0131 0.0131
349.87 0.0016 0.0023 0.0134 0.0134
349.90 0.0015 0.0024 0.0137 0.0137
349.93 0.0014 0.0025 0.0140 0.0140
349.96 0.0014 0.0026 0.0143 0.0143
349.98 0.0013 0.0026 0.0145 0.0145
350.00 0.0012 0.0027 0.0147 0.0147
Surface retention 3 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0073 0.0027 0.0000 0.0149 0.0003
1.5275 0.0074 0.0029 0.0000 0.0149 0.0006
1.5549 0.0076 0.0031 0.0000 0.0151 0.0009
1.5824 0.0077 0.0033 0.0000 0.0154 0.0012
1.6099 0.0079 0.0035 0.0000 0.0157 0.0015
1.6374 0.0080 0.0038 0.0000 0.0159 0.0018
1.6648 0.0082 0.0040 0.0000 0.0162 0.0021
1.6923 0.0084 0.0042 0.0000 0.0165 0.0024
1.7198 0.0085 0.0044 0.0000 0.0167 0.0027
1.7473 0.0087 0.0047 0.0000 0.0170 0.0031
1.7747 0.0088 0.0049 0.0000 0.0173 0.0034
1.8022 0.0090 0.0052 0.0000 0.0175 0.0037
1.8297 0.0091 0.0054 0.0000 0.0178 0.0040
1.8571 0.0093 0.0057 0.0000 0.0181 0.0044
1.8846 0.0095 0.0059 0.0000 0.0183 0.0047
1.9121 0.0096 0.0062 0.0000 0.0186 0.0050
1.9396 0.0098 0.0064 0.0000 0.0189 0.0054
1.9670 0.0100 0.0067 0.0000 0.0191 0.0057
1.9945 0.0101 0.0070 0.0000 0.0194 0.0060
2.0220 0.0103 0.0073 0.0000 0.0197 0.0064
2.0495 0.0105 0.0076 0.0000 0.0199 0.0067
2.0769 0.0106 0.0079 0.0000 0.0202 0.0071
2.1044 0.0108 0.0081 0.0000 0.0205 0.0074
2.1319 0.0110 0.0084 0.0000 0.0207 0.0078
2.1593 0.0112 0.0087 0.0000 0.0210 0.0081
2.1868 0.0113 0.0091 0.0000 0.0213 0.0085
2.2143 0.0115 0.0094 0.0000 0.0215 0.0088
2.2418 0.0117 0.0097 0.0000 0.0218 0.0092
2.2692 0.0119 0.0100 0.0000 0.0221 0.0096
2.2967 0.0120 0.0103 0.0000 0.0223 0.0099
2.3242 0.0122 0.0107 0.0000 0.0226 0.0103
2.3516 0.0124 0.0110 0.0000 0.0229 0.0107
2.3791 0.0126 0.0114 0.0000 0.0231 0.0111
2.4066 0.0128 0.0117 0.0000 0.0234 0.0114
2.4341 0.0130 0.0121 0.0000 0.0237 0.0118
2.4615 0.0132 0.0124 0.0000 0.0239 0.0122
2.4890 0.0134 0.0128 0.0000 0.0242 0.0124
2.5000 0.0134 0.0129 0.0000 0.0243 0.0000
___________________________________________________________________
Name : Surface retention 3
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 3
___________________________________________________________________
Name : Bioretention 2
Bottom Length: 16.80 ft.
Bottom Width: 3.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Wetted surface area On
Total Volume Infiltrated (ac-ft.): 4.759
Total Volume Through Riser (ac-ft.): 0
Total Volume Through Facility (ac-ft.): 4.759
Percent Infiltrated: 100
Total Precip Applied to Facility: 0.354
Total Evap From Facility: 0.16
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 2 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
349.00 0.0071 0.0000 0.0000 0.0000
349.03 0.0070 0.0000 0.0000 0.0000
349.05 0.0069 0.0000 0.0000 0.0000
349.08 0.0067 0.0000 0.0000 0.0000
349.11 0.0066 0.0001 0.0000 0.0000
349.14 0.0065 0.0001 0.0001 0.0001
349.16 0.0063 0.0001 0.0001 0.0001
349.19 0.0062 0.0001 0.0001 0.0001
349.22 0.0061 0.0001 0.0002 0.0002
349.25 0.0059 0.0002 0.0003 0.0003
349.27 0.0058 0.0002 0.0004 0.0004
349.30 0.0057 0.0002 0.0005 0.0005
349.33 0.0055 0.0002 0.0006 0.0006
349.36 0.0054 0.0003 0.0008 0.0008
349.38 0.0053 0.0003 0.0010 0.0010
349.41 0.0052 0.0003 0.0012 0.0012
349.44 0.0050 0.0004 0.0014 0.0014
349.47 0.0049 0.0004 0.0017 0.0017
349.49 0.0048 0.0004 0.0021 0.0021
349.52 0.0047 0.0005 0.0025 0.0025
349.55 0.0045 0.0005 0.0029 0.0029
349.58 0.0044 0.0005 0.0034 0.0034
349.60 0.0043 0.0006 0.0039 0.0039
349.63 0.0042 0.0006 0.0045 0.0045
349.66 0.0041 0.0007 0.0052 0.0052
349.69 0.0040 0.0007 0.0059 0.0059
349.71 0.0039 0.0007 0.0067 0.0067
349.74 0.0037 0.0008 0.0073 0.0073
349.77 0.0036 0.0008 0.0076 0.0076
349.80 0.0035 0.0009 0.0078 0.0078
349.82 0.0034 0.0009 0.0080 0.0080
349.85 0.0033 0.0010 0.0082 0.0082
349.88 0.0032 0.0010 0.0085 0.0085
349.91 0.0031 0.0011 0.0087 0.0087
349.93 0.0030 0.0011 0.0089 0.0089
349.96 0.0029 0.0012 0.0092 0.0092
349.99 0.0028 0.0013 0.0094 0.0094
350.02 0.0027 0.0013 0.0096 0.0096
350.04 0.0026 0.0014 0.0099 0.0099
350.07 0.0025 0.0014 0.0101 0.0101
350.10 0.0024 0.0015 0.0104 0.0104
350.13 0.0023 0.0016 0.0106 0.0106
350.15 0.0022 0.0016 0.0109 0.0109
350.18 0.0021 0.0017 0.0112 0.0112
350.21 0.0021 0.0018 0.0114 0.0114
350.24 0.0020 0.0018 0.0117 0.0117
350.26 0.0019 0.0019 0.0119 0.0119
350.29 0.0018 0.0020 0.0122 0.0122
350.32 0.0017 0.0021 0.0125 0.0125
350.35 0.0016 0.0021 0.0128 0.0128
350.37 0.0015 0.0022 0.0130 0.0130
350.40 0.0015 0.0023 0.0133 0.0133
350.43 0.0014 0.0024 0.0136 0.0136
350.46 0.0013 0.0025 0.0139 0.0139
350.48 0.0012 0.0026 0.0142 0.0142
350.50 0.0012 0.0026 0.0143 0.0143
Surface retention 2 Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0071 0.0026 0.0000 0.0143 0.0003
1.5275 0.0073 0.0028 0.0000 0.0143 0.0006
1.5549 0.0074 0.0030 0.0000 0.0145 0.0009
1.5824 0.0075 0.0032 0.0000 0.0148 0.0012
1.6099 0.0077 0.0034 0.0000 0.0150 0.0015
1.6374 0.0078 0.0036 0.0000 0.0153 0.0018
1.6648 0.0080 0.0039 0.0000 0.0155 0.0021
1.6923 0.0081 0.0041 0.0000 0.0158 0.0024
1.7198 0.0083 0.0043 0.0000 0.0161 0.0027
1.7473 0.0084 0.0045 0.0000 0.0163 0.0030
1.7747 0.0086 0.0048 0.0000 0.0166 0.0033
1.8022 0.0088 0.0050 0.0000 0.0168 0.0036
1.8297 0.0089 0.0053 0.0000 0.0171 0.0040
1.8571 0.0091 0.0055 0.0000 0.0173 0.0043
1.8846 0.0092 0.0058 0.0000 0.0176 0.0046
1.9121 0.0094 0.0060 0.0000 0.0178 0.0049
1.9396 0.0096 0.0063 0.0000 0.0181 0.0053
1.9670 0.0097 0.0065 0.0000 0.0184 0.0056
1.9945 0.0099 0.0068 0.0000 0.0186 0.0059
2.0220 0.0101 0.0071 0.0000 0.0189 0.0063
2.0495 0.0102 0.0074 0.0000 0.0191 0.0066
2.0769 0.0104 0.0076 0.0000 0.0194 0.0070
2.1044 0.0106 0.0079 0.0000 0.0196 0.0073
2.1319 0.0107 0.0082 0.0000 0.0199 0.0076
2.1593 0.0109 0.0085 0.0000 0.0202 0.0080
2.1868 0.0111 0.0088 0.0000 0.0204 0.0084
2.2143 0.0112 0.0091 0.0000 0.0207 0.0087
2.2418 0.0114 0.0094 0.0000 0.0209 0.0091
2.2692 0.0116 0.0098 0.0000 0.0212 0.0094
2.2967 0.0118 0.0101 0.0000 0.0214 0.0098
2.3242 0.0120 0.0104 0.0000 0.0217 0.0102
2.3516 0.0121 0.0107 0.0000 0.0219 0.0105
2.3791 0.0123 0.0111 0.0000 0.0222 0.0109
2.4066 0.0125 0.0114 0.0000 0.0225 0.0113
2.4341 0.0127 0.0118 0.0000 0.0227 0.0116
2.4615 0.0129 0.0121 0.0000 0.0230 0.0120
2.4890 0.0131 0.0125 0.0000 0.0232 0.0122
2.5000 0.0131 0.0126 0.0000 0.0233 0.0000
___________________________________________________________________
Name : Surface retention 2
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 2
___________________________________________________________________
Name : Vault 1
Width :20.5 ft.
Length :39.2 ft.
Depth:1.86 ft.
Discharge Structure
Riser Height: 1.36 ft.
Riser Diameter: 8 in.
Orifice 1 Diameter: 2.125 in. Elevation: 0 ft.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Vault Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.018 0.000 0.000 0.000
0.0207 0.018 0.000 0.017 0.000
0.0413 0.018 0.000 0.024 0.000
0.0620 0.018 0.001 0.030 0.000
0.0827 0.018 0.001 0.035 0.000
0.1033 0.018 0.001 0.039 0.000
0.1240 0.018 0.002 0.043 0.000
0.1447 0.018 0.002 0.046 0.000
0.1653 0.018 0.003 0.049 0.000
0.1860 0.018 0.003 0.052 0.000
0.2067 0.018 0.003 0.055 0.000
0.2273 0.018 0.004 0.058 0.000
0.2480 0.018 0.004 0.061 0.000
0.2687 0.018 0.005 0.063 0.000
0.2893 0.018 0.005 0.065 0.000
0.3100 0.018 0.005 0.068 0.000
0.3307 0.018 0.006 0.070 0.000
0.3513 0.018 0.006 0.072 0.000
0.3720 0.018 0.006 0.074 0.000
0.3927 0.018 0.007 0.076 0.000
0.4133 0.018 0.007 0.078 0.000
0.4340 0.018 0.008 0.080 0.000
0.4547 0.018 0.008 0.082 0.000
The vault depth and riser height
have been adjusted to account for
the 40% void ration of the StormTech
Chamber backfill and foundation
stone.
0.4753 0.018 0.008 0.084 0.000
0.4960 0.018 0.009 0.086 0.000
0.5167 0.018 0.009 0.088 0.000
0.5373 0.018 0.009 0.089 0.000
0.5580 0.018 0.010 0.091 0.000
0.5787 0.018 0.010 0.093 0.000
0.5993 0.018 0.011 0.094 0.000
0.6200 0.018 0.011 0.096 0.000
0.6407 0.018 0.011 0.098 0.000
0.6613 0.018 0.012 0.099 0.000
0.6820 0.018 0.012 0.101 0.000
0.7027 0.018 0.013 0.102 0.000
0.7233 0.018 0.013 0.104 0.000
0.7440 0.018 0.013 0.105 0.000
0.7647 0.018 0.014 0.107 0.000
0.7853 0.018 0.014 0.108 0.000
0.8060 0.018 0.014 0.110 0.000
0.8267 0.018 0.015 0.111 0.000
0.8473 0.018 0.015 0.112 0.000
0.8680 0.018 0.016 0.114 0.000
0.8887 0.018 0.016 0.115 0.000
0.9093 0.018 0.016 0.116 0.000
0.9300 0.018 0.017 0.118 0.000
0.9507 0.018 0.017 0.119 0.000
0.9713 0.018 0.017 0.120 0.000
0.9920 0.018 0.018 0.122 0.000
1.0127 0.018 0.018 0.123 0.000
1.0333 0.018 0.019 0.124 0.000
1.0540 0.018 0.019 0.125 0.000
1.0747 0.018 0.019 0.127 0.000
1.0953 0.018 0.020 0.128 0.000
1.1160 0.018 0.020 0.129 0.000
1.1367 0.018 0.021 0.130 0.000
1.1573 0.018 0.021 0.131 0.000
1.1780 0.018 0.021 0.133 0.000
1.1987 0.018 0.022 0.134 0.000
1.2193 0.018 0.022 0.135 0.000
1.2400 0.018 0.022 0.136 0.000
1.2607 0.018 0.023 0.137 0.000
1.2813 0.018 0.023 0.138 0.000
1.3020 0.018 0.024 0.139 0.000
1.3227 0.018 0.024 0.140 0.000
1.3433 0.018 0.024 0.142 0.000
1.3640 0.018 0.025 0.144 0.000
1.3847 0.018 0.025 0.171 0.000
1.4053 0.018 0.025 0.213 0.000
1.4260 0.018 0.026 0.265 0.000
1.4467 0.018 0.026 0.325 0.000
1.4673 0.018 0.027 0.391 0.000
1.4880 0.018 0.027 0.460 0.000
1.5087 0.018 0.027 0.531 0.000
1.5293 0.018 0.028 0.602 0.000
1.5500 0.018 0.028 0.669 0.000
1.5707 0.018 0.029 0.732 0.000
1.5913 0.018 0.029 0.789 0.000
1.6120 0.018 0.029 0.837 0.000
1.6327 0.018 0.030 0.878 0.000
1.6533 0.018 0.030 0.911 0.000
1.6740 0.018 0.030 0.937 0.000
1.6947 0.018 0.031 0.969 0.000
1.7153 0.018 0.031 0.994 0.000
1.7360 0.018 0.032 1.019 0.000
1.7567 0.018 0.032 1.044 0.000
1.7773 0.018 0.032 1.067 0.000
1.7980 0.018 0.033 1.090 0.000
1.8187 0.018 0.033 1.113 0.000
1.8393 0.018 0.033 1.135 0.000
1.8600 0.018 0.034 1.157 0.000
1.8807 0.018 0.034 1.178 0.000
1.9013 0.000 0.000 1.198 0.000
___________________________________________________________________
Name : Basin Roof 1
Bypass: No
GroundWater: No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
ROOF TOPS FLAT 0.012
Impervious Total 0.012
Basin Total 0.012
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 1 Surface retention 1
___________________________________________________________________
Name : Bioretention 1
Bottom Length: 11.00 ft.
Bottom Width: 2.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Total Volume Infiltrated (ac-ft.): 2.026
Total Volume Through Riser (ac-ft.): 0.001
Total Volume Through Facility (ac-ft.): 2.027
Percent Infiltrated: 99.95
Total Precip Applied to Facility: 0.29
Total Evap From Facility: 0.129
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 1 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.0051 0.0000 0.0000 0.0000
0.0275 0.0050 0.0000 0.0000 0.0000
0.0549 0.0049 0.0000 0.0000 0.0000
0.0824 0.0047 0.0000 0.0000 0.0000
0.1099 0.0046 0.0000 0.0000 0.0000
0.1374 0.0045 0.0000 0.0000 0.0000
0.1648 0.0044 0.0000 0.0000 0.0000
0.1923 0.0043 0.0001 0.0000 0.0000
0.2198 0.0042 0.0001 0.0001 0.0001
0.2473 0.0041 0.0001 0.0001 0.0001
0.2747 0.0040 0.0001 0.0001 0.0001
0.3022 0.0039 0.0001 0.0001 0.0001
0.3297 0.0038 0.0001 0.0001 0.0001
0.3571 0.0037 0.0001 0.0002 0.0002
0.3846 0.0036 0.0002 0.0002 0.0002
0.4121 0.0035 0.0002 0.0002 0.0002
0.4396 0.0034 0.0002 0.0003 0.0003
0.4670 0.0033 0.0002 0.0003 0.0003
0.4945 0.0032 0.0002 0.0004 0.0004
0.5220 0.0031 0.0003 0.0004 0.0004
0.5495 0.0030 0.0003 0.0005 0.0005
0.5769 0.0029 0.0003 0.0006 0.0006
0.6044 0.0028 0.0003 0.0006 0.0006
0.6319 0.0027 0.0003 0.0007 0.0007
0.6593 0.0026 0.0004 0.0008 0.0008
0.6868 0.0025 0.0004 0.0009 0.0009
0.7143 0.0025 0.0004 0.0010 0.0010
0.7418 0.0024 0.0004 0.0010 0.0010
0.7692 0.0023 0.0005 0.0010 0.0010
0.7967 0.0022 0.0005 0.0010 0.0010
0.8242 0.0021 0.0005 0.0010 0.0010
0.8516 0.0020 0.0006 0.0010 0.0010
0.8791 0.0020 0.0006 0.0010 0.0010
0.9066 0.0019 0.0006 0.0010 0.0010
0.9341 0.0018 0.0007 0.0010 0.0010
0.9615 0.0017 0.0007 0.0010 0.0010
0.9890 0.0017 0.0008 0.0010 0.0010
1.0165 0.0016 0.0008 0.0010 0.0010
1.0440 0.0015 0.0008 0.0010 0.0010
1.0714 0.0015 0.0009 0.0010 0.0010
1.0989 0.0014 0.0009 0.0010 0.0010
1.1264 0.0013 0.0010 0.0010 0.0010
1.1538 0.0012 0.0010 0.0010 0.0010
1.1813 0.0012 0.0011 0.0010 0.0010
1.2088 0.0011 0.0011 0.0010 0.0010
1.2363 0.0011 0.0011 0.0010 0.0010
1.2637 0.0010 0.0012 0.0010 0.0010
1.2912 0.0009 0.0013 0.0010 0.0010
1.3187 0.0009 0.0013 0.0010 0.0010
1.3462 0.0008 0.0014 0.0010 0.0010
1.3736 0.0008 0.0014 0.0010 0.0010
1.4011 0.0007 0.0015 0.0010 0.0010
1.4286 0.0007 0.0015 0.0010 0.0010
1.4560 0.0006 0.0016 0.0010 0.0010
1.4835 0.0006 0.0017 0.0010 0.0010
1.5000 0.0005 0.0017 0.0010 0.0010
Surface retention 1 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0051 0.0017 0.0000 0.0062 0.0000
1.5275 0.0052 0.0018 0.0000 0.0062 0.0000
1.5549 0.0053 0.0020 0.0000 0.0063 0.0000
1.5824 0.0054 0.0021 0.0000 0.0064 0.0000
1.6099 0.0055 0.0023 0.0000 0.0066 0.0000
1.6374 0.0057 0.0024 0.0000 0.0067 0.0000
1.6648 0.0058 0.0026 0.0000 0.0068 0.0000
1.6923 0.0059 0.0027 0.0000 0.0069 0.0000
1.7198 0.0060 0.0029 0.0000 0.0070 0.0000
1.7473 0.0062 0.0031 0.0000 0.0071 0.0000
1.7747 0.0063 0.0032 0.0000 0.0072 0.0000
1.8022 0.0064 0.0034 0.0000 0.0073 0.0000
1.8297 0.0065 0.0036 0.0000 0.0075 0.0000
1.8571 0.0067 0.0038 0.0000 0.0076 0.0000
1.8846 0.0068 0.0040 0.0000 0.0077 0.0000
1.9121 0.0070 0.0042 0.0000 0.0078 0.0000
1.9396 0.0071 0.0043 0.0000 0.0079 0.0000
1.9670 0.0072 0.0045 0.0000 0.0080 0.0000
1.9945 0.0074 0.0047 0.0000 0.0081 0.0000
2.0220 0.0075 0.0050 0.0000 0.0082 0.0000
2.0495 0.0076 0.0052 0.0000 0.0083 0.0000
2.0769 0.0078 0.0054 0.0000 0.0085 0.0000
2.1044 0.0079 0.0056 0.0000 0.0086 0.0000
2.1319 0.0081 0.0058 0.0000 0.0087 0.0000
2.1593 0.0082 0.0060 0.0000 0.0088 0.0000
2.1868 0.0084 0.0063 0.0000 0.0089 0.0000
2.2143 0.0085 0.0065 0.0000 0.0090 0.0000
2.2418 0.0087 0.0067 0.0000 0.0091 0.0000
2.2692 0.0088 0.0070 0.0000 0.0092 0.0000
2.2967 0.0090 0.0072 0.0000 0.0094 0.0000
2.3242 0.0091 0.0075 0.0000 0.0095 0.0000
2.3516 0.0093 0.0077 0.0000 0.0096 0.0000
2.3791 0.0094 0.0080 0.0000 0.0097 0.0000
2.4066 0.0096 0.0082 0.0000 0.0098 0.0000
2.4341 0.0098 0.0085 0.0000 0.0099 0.0000
2.4615 0.0099 0.0088 0.0000 0.0100 0.0000
2.4890 0.0101 0.0090 0.0000 0.0101 0.0000
2.5000 0.0101 0.0092 0.0000 0.0102 0.0000
___________________________________________________________________
Name : Surface retention 1
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 1
___________________________________________________________________
Name : Basin Roof 4
Bypass: No
GroundWater: No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
ROOF TOPS FLAT 0.014
Impervious Total 0.014
Basin Total 0.014
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface oretention 4 Surface oretention 4
___________________________________________________________________
Name : Bioretention 4
Bottom Length: 15.00 ft.
Bottom Width: 2.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Total Volume Infiltrated (ac-ft.): 2.346
Total Volume Through Riser (ac-ft.): 0.001
Total Volume Through Facility (ac-ft.): 2.347
Percent Infiltrated: 99.96
Total Precip Applied to Facility: 0.329
Total Evap From Facility: 0.161
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 4 Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.0061 0.0000 0.0000 0.0000
0.0275 0.0060 0.0000 0.0000 0.0000
0.0549 0.0059 0.0000 0.0000 0.0000
0.0824 0.0057 0.0000 0.0000 0.0000
0.1099 0.0056 0.0000 0.0000 0.0000
0.1374 0.0055 0.0001 0.0000 0.0000
0.1648 0.0053 0.0001 0.0000 0.0000
0.1923 0.0052 0.0001 0.0001 0.0001
0.2198 0.0051 0.0001 0.0001 0.0001
0.2473 0.0050 0.0001 0.0001 0.0001
0.2747 0.0048 0.0001 0.0001 0.0001
0.3022 0.0047 0.0001 0.0002 0.0002
0.3297 0.0046 0.0002 0.0002 0.0002
0.3571 0.0045 0.0002 0.0002 0.0002
0.3846 0.0044 0.0002 0.0003 0.0003
0.4121 0.0043 0.0002 0.0003 0.0003
0.4396 0.0041 0.0003 0.0004 0.0004
0.4670 0.0040 0.0003 0.0005 0.0005
0.4945 0.0039 0.0003 0.0005 0.0005
0.5220 0.0038 0.0003 0.0006 0.0006
0.5495 0.0037 0.0004 0.0007 0.0007
0.5769 0.0036 0.0004 0.0008 0.0008
0.6044 0.0035 0.0004 0.0009 0.0009
0.6319 0.0034 0.0004 0.0010 0.0010
0.6593 0.0033 0.0005 0.0011 0.0011
0.6868 0.0032 0.0005 0.0012 0.0012
0.7143 0.0031 0.0005 0.0013 0.0013
0.7418 0.0030 0.0006 0.0014 0.0014
0.7692 0.0029 0.0006 0.0014 0.0014
0.7967 0.0028 0.0007 0.0014 0.0014
0.8242 0.0027 0.0007 0.0014 0.0014
0.8516 0.0026 0.0007 0.0014 0.0014
0.8791 0.0025 0.0008 0.0014 0.0014
0.9066 0.0024 0.0008 0.0014 0.0014
0.9341 0.0023 0.0009 0.0014 0.0014
0.9615 0.0022 0.0009 0.0014 0.0014
0.9890 0.0021 0.0010 0.0014 0.0014
1.0165 0.0020 0.0010 0.0014 0.0014
1.0440 0.0020 0.0011 0.0014 0.0014
1.0714 0.0019 0.0011 0.0014 0.0014
1.0989 0.0018 0.0012 0.0014 0.0014
1.1264 0.0017 0.0012 0.0014 0.0014
1.1538 0.0016 0.0013 0.0014 0.0014
1.1813 0.0016 0.0013 0.0014 0.0014
1.2088 0.0015 0.0014 0.0014 0.0014
1.2363 0.0014 0.0014 0.0014 0.0014
1.2637 0.0013 0.0015 0.0014 0.0014
1.2912 0.0012 0.0016 0.0014 0.0014
1.3187 0.0012 0.0016 0.0014 0.0014
1.3462 0.0011 0.0017 0.0014 0.0014
1.3736 0.0010 0.0018 0.0014 0.0014
1.4011 0.0010 0.0018 0.0014 0.0014
1.4286 0.0009 0.0019 0.0014 0.0014
1.4560 0.0008 0.0020 0.0014 0.0014
1.4835 0.0008 0.0021 0.0014 0.0014
1.5000 0.0007 0.0021 0.0014 0.0014
Surface oretention 4 Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0061 0.0021 0.0000 0.0085 0.0000
1.5275 0.0062 0.0023 0.0000 0.0085 0.0000
1.5549 0.0063 0.0024 0.0000 0.0086 0.0000
1.5824 0.0065 0.0026 0.0000 0.0088 0.0000
1.6099 0.0066 0.0028 0.0000 0.0089 0.0000
1.6374 0.0067 0.0030 0.0000 0.0091 0.0000
1.6648 0.0069 0.0032 0.0000 0.0092 0.0000
1.6923 0.0070 0.0034 0.0000 0.0094 0.0000
1.7198 0.0072 0.0036 0.0000 0.0096 0.0000
1.7473 0.0073 0.0038 0.0000 0.0097 0.0000
1.7747 0.0074 0.0040 0.0000 0.0099 0.0000
1.8022 0.0076 0.0042 0.0000 0.0100 0.0000
1.8297 0.0077 0.0044 0.0000 0.0102 0.0000
1.8571 0.0079 0.0046 0.0000 0.0103 0.0000
1.8846 0.0080 0.0048 0.0000 0.0105 0.0000
1.9121 0.0082 0.0050 0.0000 0.0106 0.0000
1.9396 0.0083 0.0053 0.0000 0.0108 0.0000
1.9670 0.0085 0.0055 0.0000 0.0109 0.0000
1.9945 0.0086 0.0057 0.0000 0.0111 0.0000
2.0220 0.0088 0.0060 0.0000 0.0112 0.0000
2.0495 0.0090 0.0062 0.0000 0.0114 0.0000
2.0769 0.0091 0.0065 0.0000 0.0115 0.0000
2.1044 0.0093 0.0067 0.0000 0.0117 0.0000
2.1319 0.0094 0.0070 0.0000 0.0118 0.0000
2.1593 0.0096 0.0072 0.0000 0.0120 0.0000
2.1868 0.0098 0.0075 0.0000 0.0121 0.0000
2.2143 0.0099 0.0078 0.0000 0.0123 0.0000
2.2418 0.0101 0.0080 0.0000 0.0125 0.0000
2.2692 0.0103 0.0083 0.0000 0.0126 0.0000
2.2967 0.0104 0.0086 0.0000 0.0128 0.0000
2.3242 0.0106 0.0089 0.0000 0.0129 0.0000
2.3516 0.0108 0.0092 0.0000 0.0131 0.0000
2.3791 0.0109 0.0095 0.0000 0.0132 0.0000
2.4066 0.0111 0.0098 0.0000 0.0134 0.0000
2.4341 0.0113 0.0101 0.0000 0.0135 0.0000
2.4615 0.0115 0.0104 0.0000 0.0137 0.0000
2.4890 0.0116 0.0107 0.0000 0.0138 0.0000
2.5000 0.0117 0.0108 0.0000 0.0139 0.0000
___________________________________________________________________
Name : Surface oretention 4
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 4
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.789
Total Impervious Area:0.27
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.401
Total Impervious Area:0.6578
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.108015
5 year 0.148097
10 year 0.178936
25 year 0.223141
50 year 0.26012
100 year 0.300785
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.106661
5 year 0.140781
10 year 0.166769
25 year 0.20367
50 year 0.234271
100 year 0.267684
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.137 0.119
1950 0.180 0.120
1951 0.107 0.113
1952 0.075 0.097
1953 0.080 0.096
1954 0.092 0.093
1955 0.095 0.112
1956 0.094 0.104
1957 0.106 0.119
1958 0.086 0.090
1959 0.087 0.087
1960 0.095 0.114
1961 0.091 0.097
1962 0.079 0.084
1963 0.092 0.087
1964 0.087 0.105
1965 0.115 0.095
1966 0.074 0.091
1967 0.169 0.111
1968 0.143 0.111
1969 0.099 0.098
1970 0.096 0.096
1971 0.114 0.097
1972 0.168 0.129
1973 0.072 0.089
1974 0.104 0.088
1975 0.120 0.110
1976 0.083 0.088
1977 0.088 0.093
1978 0.107 0.124
1979 0.147 0.103
1980 0.132 0.113
1981 0.108 0.110
1982 0.152 0.140
1983 0.123 0.124
1984 0.079 0.083
1985 0.107 0.106
1986 0.093 0.125
1987 0.144 0.121
1988 0.088 0.091
1989 0.109 0.085
1990 0.343 0.321
1991 0.188 0.190
1992 0.077 0.099
1993 0.067 0.074
1994 0.073 0.080
1995 0.095 0.095
1996 0.158 0.122
1997 0.117 0.110
1998 0.100 0.089
1999 0.219 0.142
2000 0.103 0.115
2001 0.112 0.092
2002 0.130 0.122
2003 0.106 0.088
2004 0.191 0.296
2005 0.088 0.117
2006 0.095 0.089
2007 0.352 0.247
2008 0.189 0.295
2009 0.133 0.124
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3524 0.3212
2 0.3425 0.2964
3 0.2190 0.2953
4 0.1915 0.2466
5 0.1895 0.1903
6 0.1882 0.1421
7 0.1803 0.1395
8 0.1692 0.1289
9 0.1681 0.1247
10 0.1576 0.1243
11 0.1517 0.1241
12 0.1466 0.1238
13 0.1435 0.1224
14 0.1431 0.1224
15 0.1370 0.1211
16 0.1331 0.1197
17 0.1316 0.1191
18 0.1304 0.1188
19 0.1235 0.1170
20 0.1202 0.1151
21 0.1175 0.1136
22 0.1152 0.1129
23 0.1144 0.1125
24 0.1118 0.1125
25 0.1089 0.1115
26 0.1076 0.1114
27 0.1073 0.1105
28 0.1071 0.1103
29 0.1067 0.1102
30 0.1062 0.1063
31 0.1061 0.1048
32 0.1044 0.1044
33 0.1029 0.1029
34 0.0999 0.0988
35 0.0994 0.0976
36 0.0961 0.0974
37 0.0954 0.0968
38 0.0950 0.0967
39 0.0949 0.0960
40 0.0946 0.0955
41 0.0936 0.0951
42 0.0930 0.0950
43 0.0925 0.0928
44 0.0920 0.0926
45 0.0906 0.0924
46 0.0879 0.0914
47 0.0877 0.0906
48 0.0875 0.0905
49 0.0872 0.0895
50 0.0868 0.0888
51 0.0855 0.0887
52 0.0826 0.0882
53 0.0800 0.0882
54 0.0789 0.0878
55 0.0785 0.0868
56 0.0771 0.0867
57 0.0747 0.0852
58 0.0737 0.0840
59 0.0732 0.0825
60 0.0715 0.0799
61 0.0668 0.0741
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0 acre-feet
On-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Sunset Court East Basin
Site Name: Renton Housing Authority
Site Address: Sunset Court
City : Renton
Report Date: 7/5/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin B
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .493
Pervious Total 0.493
Impervious Land Use acre
SIDEWALKS FLAT 0.127
Impervious Total 0.127
Basin Total 0.62
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : East Basin
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .222
Pervious Total 0.222
Impervious Land Use acre
DRIVEWAYS FLAT 0.033
SIDEWALKS FLAT 0.044
PARKING FLAT 0.321
Impervious Total 0.398
Basin Total 0.62
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Tank 1 Tank 1
___________________________________________________________________
Name : Tank 1
Tank Name: Tank 1
Dimensions
Depth: 3 ft.
Tank Type : Circular
Diameter : 3 ft.
Length : 265 ft.
Discharge Structure
Riser Height: 2.5 ft.
Riser Diameter: 8 in.
Orifice 1 Diameter: 1.2968 in. Elevation: 0 ft.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Tank Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
342.50 0.000 0.000 0.000 0.000
342.53 0.003 0.000 0.008 0.000
342.57 0.005 0.000 0.011 0.000
342.60 0.006 0.000 0.014 0.000
342.63 0.007 0.000 0.016 0.000
342.67 0.008 0.000 0.018 0.000
342.70 0.009 0.001 0.020 0.000
342.73 0.009 0.001 0.022 0.000
342.77 0.010 0.001 0.023 0.000
342.80 0.011 0.002 0.025 0.000
342.83 0.011 0.002 0.026 0.000
342.87 0.012 0.003 0.027 0.000
342.90 0.012 0.003 0.028 0.000
342.93 0.012 0.003 0.030 0.000
342.97 0.013 0.004 0.031 0.000
343.00 0.013 0.004 0.032 0.000
343.03 0.014 0.005 0.033 0.000
343.07 0.014 0.005 0.034 0.000
343.10 0.014 0.006 0.035 0.000
343.13 0.014 0.006 0.036 0.000
343.17 0.015 0.007 0.037 0.000
343.20 0.015 0.007 0.038 0.000
343.23 0.015 0.008 0.039 0.000
343.27 0.015 0.008 0.040 0.000
343.30 0.016 0.009 0.040 0.000
343.33 0.016 0.009 0.041 0.000
343.37 0.016 0.010 0.042 0.000
343.40 0.016 0.010 0.043 0.000
343.43 0.016 0.011 0.044 0.000
343.47 0.017 0.012 0.044 0.000
343.50 0.017 0.012 0.045 0.000
343.53 0.017 0.013 0.046 0.000
343.57 0.017 0.013 0.047 0.000
343.60 0.017 0.014 0.047 0.000
343.63 0.017 0.014 0.048 0.000
343.67 0.017 0.015 0.049 0.000
343.70 0.017 0.016 0.050 0.000
343.73 0.018 0.016 0.050 0.000
343.77 0.018 0.017 0.051 0.000
343.80 0.018 0.017 0.052 0.000
343.83 0.018 0.018 0.052 0.000
343.87 0.018 0.019 0.053 0.000
343.90 0.018 0.019 0.054 0.000
343.93 0.018 0.020 0.054 0.000
343.97 0.018 0.020 0.055 0.000
344.00 0.018 0.021 0.055 0.000
344.03 0.018 0.022 0.056 0.000
344.07 0.018 0.022 0.057 0.000
344.10 0.018 0.023 0.057 0.000
344.13 0.018 0.023 0.058 0.000
344.17 0.018 0.024 0.058 0.000
344.20 0.018 0.025 0.059 0.000
344.23 0.018 0.025 0.060 0.000
344.27 0.018 0.026 0.060 0.000
344.30 0.017 0.026 0.061 0.000
344.33 0.017 0.027 0.061 0.000
344.37 0.017 0.028 0.062 0.000
344.40 0.017 0.028 0.062 0.000
344.43 0.017 0.029 0.063 0.000
344.47 0.017 0.029 0.064 0.000
344.50 0.017 0.030 0.064 0.000
344.53 0.017 0.031 0.065 0.000
344.57 0.016 0.031 0.065 0.000
344.60 0.016 0.032 0.066 0.000
344.63 0.016 0.032 0.066 0.000
344.67 0.016 0.033 0.067 0.000
344.70 0.016 0.033 0.067 0.000
344.73 0.015 0.034 0.068 0.000
344.77 0.015 0.034 0.068 0.000
344.80 0.015 0.035 0.069 0.000
344.83 0.015 0.035 0.069 0.000
344.87 0.014 0.036 0.070 0.000
344.90 0.014 0.036 0.070 0.000
344.93 0.014 0.037 0.071 0.000
344.97 0.014 0.037 0.071 0.000
345.00 0.013 0.038 0.072 0.000
345.03 0.013 0.038 0.115 0.000
345.07 0.012 0.039 0.194 0.000
345.10 0.012 0.039 0.293 0.000
345.13 0.012 0.040 0.403 0.000
345.17 0.011 0.040 0.516 0.000
345.20 0.011 0.040 0.622 0.000
345.23 0.010 0.041 0.714 0.000
345.27 0.009 0.041 0.787 0.000
345.30 0.009 0.041 0.839 0.000
345.33 0.008 0.042 0.876 0.000
345.37 0.007 0.042 0.924 0.000
345.40 0.006 0.042 0.963 0.000
345.43 0.005 0.042 0.999 0.000
345.47 0.003 0.042 1.034 0.000
345.50 0.000 0.043 1.068 0.000
345.53 0.000 0.000 1.101 0.000
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.493
Total Impervious Area:0.127
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.222
Total Impervious Area:0.398
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.051879
5 year 0.073204
10 year 0.089986
25 year 0.114497
50 year 0.135349
100 year 0.158593
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.051673
5 year 0.071359
10 year 0.086897
25 year 0.109638
50 year 0.129019
100 year 0.150659
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.065 0.054
1950 0.096 0.052
1951 0.054 0.057
1952 0.035 0.044
1953 0.038 0.045
1954 0.045 0.044
1955 0.045 0.059
1956 0.047 0.049
1957 0.050 0.057
1958 0.040 0.050
1959 0.041 0.045
1960 0.048 0.056
1961 0.044 0.044
1962 0.037 0.041
1963 0.044 0.040
1964 0.041 0.047
1965 0.055 0.044
1966 0.035 0.044
1967 0.089 0.056
1968 0.067 0.048
1969 0.047 0.049
1970 0.045 0.047
1971 0.054 0.046
1972 0.087 0.060
1973 0.034 0.046
1974 0.049 0.041
1975 0.057 0.057
1976 0.039 0.044
1977 0.041 0.043
1978 0.050 0.055
1979 0.069 0.045
1980 0.062 0.052
1981 0.051 0.049
1982 0.071 0.063
1983 0.058 0.054
1984 0.037 0.044
1985 0.050 0.050
1986 0.044 0.063
1987 0.068 0.062
1988 0.041 0.043
1989 0.051 0.040
1990 0.186 0.190
1991 0.095 0.070
1992 0.036 0.048
1993 0.031 0.040
1994 0.035 0.039
1995 0.045 0.048
1996 0.085 0.061
1997 0.058 0.065
1998 0.047 0.045
1999 0.117 0.057
2000 0.049 0.053
2001 0.053 0.044
2002 0.061 0.062
2003 0.051 0.044
2004 0.090 0.191
2005 0.041 0.058
2006 0.047 0.047
2007 0.195 0.150
2008 0.097 0.198
2009 0.063 0.058
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1952 0.1979
2 0.1857 0.1911
3 0.1174 0.1897
4 0.0972 0.1505
5 0.0955 0.0696
6 0.0950 0.0652
7 0.0901 0.0630
8 0.0885 0.0627
9 0.0868 0.0620
10 0.0845 0.0616
11 0.0714 0.0612
12 0.0690 0.0599
13 0.0675 0.0590
14 0.0673 0.0584
15 0.0650 0.0584
16 0.0626 0.0573
17 0.0619 0.0573
18 0.0614 0.0572
19 0.0582 0.0565
20 0.0581 0.0564
21 0.0565 0.0557
22 0.0551 0.0546
23 0.0538 0.0543
24 0.0538 0.0540
25 0.0526 0.0528
26 0.0512 0.0521
27 0.0506 0.0518
28 0.0506 0.0498
29 0.0505 0.0497
30 0.0504 0.0494
31 0.0500 0.0491
32 0.0491 0.0491
33 0.0486 0.0482
34 0.0475 0.0480
35 0.0474 0.0479
36 0.0470 0.0474
37 0.0468 0.0470
38 0.0467 0.0466
39 0.0452 0.0460
40 0.0449 0.0459
41 0.0448 0.0451
42 0.0447 0.0449
43 0.0440 0.0449
44 0.0438 0.0448
45 0.0435 0.0443
46 0.0414 0.0442
47 0.0414 0.0441
48 0.0414 0.0440
49 0.0412 0.0438
50 0.0410 0.0436
51 0.0402 0.0436
52 0.0391 0.0435
53 0.0376 0.0435
54 0.0371 0.0432
55 0.0370 0.0431
56 0.0363 0.0414
57 0.0352 0.0408
58 0.0348 0.0400
59 0.0345 0.0398
60 0.0336 0.0396
61 0.0314 0.0385
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0 acre-feet
On-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
___________________________________________________________________
LID Report
LID Technique Used for Total Volumn Volumn Infiltration Cumulative
Percent Water Quality Percent Comment
Treatment? Needs Through Volumn Volumn
Volumn Water Quality
Treatment Facility (ac-ft.) Infiltration
Infiltrated Treated
(ac-ft) (ac-ft) Credit
Tank 1 POC N 57.02 N
0.00
Total Volume Infiltrated 57.02 0.00 0.00 0.00
0.00 0% No Treat. Credit
Compliance with LID Standard 8
Duration Analysis Result = Failed
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: WQ A Sunset Court
Site Name: Sunset Court
Site Address:
City : Renton
Report Date: 6/27/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .11
Pervious Total 0.11
Impervious Land Use acre
Impervious Total 0
Basin Total 0.11
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Mod .012
Pervious Total 0.012
Impervious Land Use acre
PARKING FLAT 0.098
Impervious Total 0.098
Basin Total 0.11
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.11
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.012
Total Impervious Area:0.098
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.003837
5 year 0.011067
10 year 0.017409
25 year 0.026276
50 year 0.033152
100 year 0.039901
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.04507
5 year 0.056934
10 year 0.064996
25 year 0.075454
50 year 0.083458
100 year 0.091658
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.007 0.059
1950 0.020 0.062
1951 0.009 0.037
1952 0.002 0.031
1953 0.001 0.035
1954 0.006 0.037
1955 0.003 0.042
1956 0.007 0.040
1957 0.002 0.046
1958 0.003 0.037
1959 0.003 0.039
1960 0.006 0.038
1961 0.005 0.039
1962 0.000 0.034
1963 0.005 0.039
1964 0.005 0.038
1965 0.009 0.048
1966 0.002 0.031
1967 0.017 0.054
1968 0.006 0.063
1969 0.003 0.043
1970 0.001 0.042
1971 0.003 0.050
1972 0.016 0.053
1973 0.001 0.032
1974 0.004 0.046
1975 0.004 0.052
1976 0.004 0.036
1977 0.000 0.038
1978 0.001 0.049
1979 0.000 0.064
1980 0.004 0.057
1981 0.002 0.046
1982 0.010 0.065
1983 0.002 0.053
1984 0.003 0.033
1985 0.000 0.046
1986 0.004 0.040
1987 0.004 0.062
1988 0.000 0.037
1989 0.001 0.051
1990 0.039 0.083
1991 0.020 0.066
1992 0.002 0.033
1993 0.001 0.032
1994 0.000 0.033
1995 0.005 0.041
1996 0.015 0.046
1997 0.007 0.043
1998 0.002 0.043
1999 0.024 0.089
2000 0.005 0.044
2001 0.000 0.049
2002 0.004 0.056
2003 0.007 0.046
2004 0.013 0.083
2005 0.004 0.038
2006 0.006 0.034
2007 0.040 0.078
2008 0.020 0.064
2009 0.008 0.058
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0401 0.0890
2 0.0394 0.0834
3 0.0242 0.0831
4 0.0200 0.0781
5 0.0198 0.0660
6 0.0195 0.0651
7 0.0168 0.0643
8 0.0161 0.0642
9 0.0147 0.0631
10 0.0125 0.0622
11 0.0103 0.0617
12 0.0090 0.0587
13 0.0087 0.0578
14 0.0080 0.0572
15 0.0075 0.0555
16 0.0075 0.0542
17 0.0074 0.0532
18 0.0067 0.0525
19 0.0061 0.0518
20 0.0057 0.0509
21 0.0056 0.0497
22 0.0055 0.0492
23 0.0053 0.0485
24 0.0050 0.0478
25 0.0050 0.0463
26 0.0049 0.0462
27 0.0048 0.0461
28 0.0045 0.0461
29 0.0043 0.0457
30 0.0043 0.0455
31 0.0042 0.0445
32 0.0040 0.0433
33 0.0039 0.0433
34 0.0037 0.0426
35 0.0036 0.0417
36 0.0034 0.0417
37 0.0032 0.0411
38 0.0031 0.0400
39 0.0028 0.0399
40 0.0027 0.0390
41 0.0025 0.0385
42 0.0023 0.0385
43 0.0023 0.0381
44 0.0023 0.0378
45 0.0022 0.0377
46 0.0021 0.0377
47 0.0019 0.0375
48 0.0016 0.0371
49 0.0015 0.0370
50 0.0010 0.0369
51 0.0009 0.0359
52 0.0008 0.0347
53 0.0007 0.0341
54 0.0007 0.0340
55 0.0003 0.0333
56 0.0002 0.0331
57 0.0002 0.0325
58 0.0001 0.0320
59 0.0001 0.0317
60 0.0001 0.0315
61 0.0001 0.0313
___________________________________________________________________
_____________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0139 acre-feet
On-line facility target flow: 0.0187 cfs.
Adjusted for 15 min: 0.0187 cfs.
Off-line facility target flow: 0.0106 cfs.
Adjusted for 15 min: 0.0106 cfs.
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: WQ B Sunset Court
Site Name: Sunset Court
Site Address:
City : Renton
Report Date: 11/29/2016
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version : 2015/07/21
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .204
Pervious Total 0.204
Impervious Land Use Acres
Impervious Total 0
Basin Total 0.204
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Mod .075
Pervious Total 0.075
Impervious Land Use Acres
PARKING FLAT 0.129
Impervious Total 0.129
Basin Total 0.204
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.204
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.075
Total Impervious Area:0.129
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.007116
5 year 0.020525
10 year 0.032286
25 year 0.048729
50 year 0.061482
100 year 0.073998
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.060956
5 year 0.078518
10 year 0.090882
25 year 0.107376
50 year 0.120318
100 year 0.133837
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.014 0.082
1950 0.037 0.082
1951 0.017 0.055
1952 0.004 0.041
1953 0.001 0.046
1954 0.010 0.052
1955 0.006 0.055
1956 0.014 0.053
1957 0.004 0.061
1958 0.005 0.049
1959 0.006 0.051
1960 0.010 0.052
1961 0.009 0.051
1962 0.000 0.045
1963 0.009 0.055
1964 0.010 0.050
1965 0.016 0.069
1966 0.004 0.042
1967 0.031 0.076
1968 0.010 0.083
1969 0.006 0.056
1970 0.002 0.056
1971 0.005 0.065
1972 0.030 0.079
1973 0.002 0.042
1974 0.007 0.062
1975 0.008 0.068
1976 0.007 0.050
1977 0.000 0.050
1978 0.003 0.064
1979 0.001 0.085
1980 0.008 0.078
1981 0.004 0.061
1982 0.019 0.090
1983 0.004 0.070
1984 0.005 0.044
1985 0.000 0.060
1986 0.007 0.053
1987 0.008 0.081
1988 0.000 0.049
1989 0.002 0.067
1990 0.073 0.133
1991 0.037 0.100
1992 0.003 0.044
1993 0.001 0.042
1994 0.000 0.043
1995 0.009 0.054
1996 0.027 0.069
1997 0.014 0.062
1998 0.004 0.057
1999 0.045 0.117
2000 0.009 0.062
2001 0.000 0.065
2002 0.008 0.073
2003 0.012 0.066
2004 0.023 0.110
2005 0.007 0.052
2006 0.011 0.049
2007 0.074 0.122
2008 0.036 0.097
2009 0.015 0.076
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0744 0.1329
2 0.0730 0.1221
3 0.0449 0.1172
4 0.0370 0.1099
5 0.0368 0.0999
6 0.0362 0.0970
7 0.0311 0.0899
8 0.0299 0.0847
9 0.0273 0.0830
10 0.0232 0.0821
11 0.0191 0.0819
12 0.0166 0.0813
13 0.0161 0.0789
14 0.0148 0.0784
15 0.0138 0.0761
16 0.0138 0.0757
17 0.0137 0.0731
18 0.0125 0.0701
19 0.0114 0.0689
20 0.0105 0.0685
21 0.0103 0.0682
22 0.0103 0.0670
23 0.0098 0.0658
24 0.0093 0.0654
25 0.0092 0.0647
26 0.0090 0.0639
27 0.0089 0.0623
28 0.0083 0.0621
29 0.0079 0.0617
30 0.0079 0.0608
31 0.0077 0.0608
32 0.0074 0.0602
33 0.0073 0.0570
34 0.0069 0.0561
35 0.0068 0.0555
36 0.0063 0.0550
37 0.0060 0.0549
38 0.0058 0.0548
39 0.0052 0.0541
40 0.0051 0.0532
41 0.0047 0.0525
42 0.0043 0.0521
43 0.0043 0.0520
44 0.0042 0.0519
45 0.0041 0.0510
46 0.0039 0.0507
47 0.0036 0.0503
48 0.0029 0.0501
49 0.0027 0.0499
50 0.0018 0.0493
51 0.0017 0.0490
52 0.0015 0.0488
53 0.0013 0.0457
54 0.0013 0.0447
55 0.0005 0.0443
56 0.0004 0.0436
57 0.0003 0.0428
58 0.0003 0.0421
59 0.0002 0.0420
60 0.0002 0.0417
61 0.0002 0.0414
___________________________________________________________________
_____________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0184 acre-feet
On-line facility target flow: 0.0249 cfs.
Adjusted for 15 min: 0.0249 cfs.
Off-line facility target flow: 0.0141 cfs.
Adjusted for 15 min: 0.0141 cfs.
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2016; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: WQ C Sunset Court
Site Name: Sunset Court
Site Address:
City : Renton
Report Date: 6/21/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .179
Pervious Total 0.179
Impervious Land Use acre
Impervious Total 0
Basin Total 0.179
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Mod .055
Pervious Total 0.055
Impervious Land Use acre
PARKING FLAT 0.124
Impervious Total 0.124
Basin Total 0.179
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.179
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.055
Total Impervious Area:0.124
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.006244
5 year 0.01801
10 year 0.02833
25 year 0.042758
50 year 0.053947
100 year 0.06493
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.058017
5 year 0.07427
10 year 0.085657
25 year 0.100789
50 year 0.112622
100 year 0.124949
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.012 0.078
1950 0.032 0.079
1951 0.015 0.051
1952 0.004 0.040
1953 0.001 0.044
1954 0.009 0.049
1955 0.005 0.053
1956 0.012 0.051
1957 0.004 0.058
1958 0.004 0.047
1959 0.005 0.049
1960 0.009 0.049
1961 0.008 0.049
1962 0.000 0.043
1963 0.008 0.052
1964 0.009 0.048
1965 0.014 0.064
1966 0.004 0.040
1967 0.027 0.070
1968 0.009 0.080
1969 0.006 0.054
1970 0.001 0.053
1971 0.005 0.063
1972 0.026 0.073
1973 0.002 0.040
1974 0.007 0.059
1975 0.007 0.066
1976 0.006 0.047
1977 0.000 0.048
1978 0.002 0.061
1979 0.000 0.081
1980 0.007 0.074
1981 0.003 0.058
1982 0.017 0.084
1983 0.004 0.067
1984 0.004 0.042
1985 0.000 0.058
1986 0.006 0.050
1987 0.007 0.078
1988 0.000 0.047
1989 0.002 0.064
1990 0.064 0.121
1991 0.032 0.092
1992 0.003 0.042
1993 0.001 0.040
1994 0.000 0.041
1995 0.008 0.052
1996 0.024 0.064
1997 0.012 0.058
1998 0.003 0.055
1999 0.039 0.113
2000 0.008 0.059
2001 0.000 0.062
2002 0.007 0.070
2003 0.011 0.062
2004 0.020 0.106
2005 0.006 0.049
2006 0.010 0.046
2007 0.065 0.111
2008 0.032 0.090
2009 0.013 0.073
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0653 0.1210
2 0.0641 0.1126
3 0.0394 0.1105
4 0.0325 0.1056
5 0.0323 0.0922
6 0.0318 0.0896
7 0.0273 0.0844
8 0.0262 0.0814
9 0.0240 0.0798
10 0.0204 0.0787
11 0.0167 0.0781
12 0.0146 0.0775
13 0.0141 0.0744
14 0.0130 0.0731
15 0.0121 0.0730
16 0.0121 0.0703
17 0.0120 0.0699
18 0.0109 0.0673
19 0.0100 0.0656
20 0.0092 0.0644
21 0.0091 0.0643
22 0.0090 0.0639
23 0.0086 0.0629
24 0.0082 0.0622
25 0.0081 0.0618
26 0.0079 0.0614
27 0.0078 0.0590
28 0.0073 0.0587
29 0.0069 0.0584
30 0.0069 0.0583
31 0.0068 0.0582
32 0.0065 0.0579
33 0.0064 0.0548
34 0.0061 0.0540
35 0.0059 0.0532
36 0.0055 0.0528
37 0.0052 0.0520
38 0.0050 0.0518
39 0.0045 0.0510
40 0.0044 0.0509
41 0.0041 0.0505
42 0.0038 0.0494
43 0.0038 0.0493
44 0.0037 0.0490
45 0.0036 0.0489
46 0.0034 0.0487
47 0.0031 0.0482
48 0.0026 0.0477
49 0.0024 0.0474
50 0.0016 0.0472
51 0.0015 0.0471
52 0.0013 0.0458
53 0.0011 0.0439
54 0.0011 0.0430
55 0.0004 0.0425
56 0.0004 0.0419
57 0.0002 0.0412
58 0.0002 0.0405
59 0.0001 0.0402
60 0.0001 0.0401
61 0.0001 0.0398
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0184 acre-feet
On-line facility target flow: 0.0249 cfs.
Adjusted for 15 min: 0.0249 cfs.
Off-line facility target flow: 0.0141 cfs.
Adjusted for 15 min: 0.0141 cfs.
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: WQ D Sunset Court
Site Name: Sunset Court
Site Address:
City : Renton
Report Date: 6/21/2017
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version Date: 2016/02/25
Version : 4.2.12
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Flat .06
Pervious Total 0.06
Impervious Land Use acre
Impervious Total 0
Basin Total 0.06
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
A B, Lawn, Mod .022
Pervious Total 0.022
Impervious Land Use acre
PARKING FLAT 0.038
Impervious Total 0.038
Basin Total 0.06
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.06
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.022
Total Impervious Area:0.038
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.002093
5 year 0.006037
10 year 0.009496
25 year 0.014332
50 year 0.018083
100 year 0.021764
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.017953
5 year 0.023123
10 year 0.026762
25 year 0.031617
50 year 0.035426
100 year 0.039404
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.004 0.024
1950 0.011 0.024
1951 0.005 0.016
1952 0.001 0.012
1953 0.000 0.013
1954 0.003 0.015
1955 0.002 0.016
1956 0.004 0.016
1957 0.001 0.018
1958 0.001 0.014
1959 0.002 0.015
1960 0.003 0.015
1961 0.003 0.015
1962 0.000 0.013
1963 0.003 0.016
1964 0.003 0.015
1965 0.005 0.020
1966 0.001 0.012
1967 0.009 0.022
1968 0.003 0.024
1969 0.002 0.017
1970 0.000 0.016
1971 0.002 0.019
1972 0.009 0.023
1973 0.001 0.012
1974 0.002 0.018
1975 0.002 0.020
1976 0.002 0.015
1977 0.000 0.015
1978 0.001 0.019
1979 0.000 0.025
1980 0.002 0.023
1981 0.001 0.018
1982 0.006 0.026
1983 0.001 0.021
1984 0.001 0.013
1985 0.000 0.018
1986 0.002 0.015
1987 0.002 0.024
1988 0.000 0.015
1989 0.001 0.020
1990 0.021 0.039
1991 0.011 0.029
1992 0.001 0.013
1993 0.000 0.012
1994 0.000 0.013
1995 0.003 0.016
1996 0.008 0.020
1997 0.004 0.018
1998 0.001 0.017
1999 0.013 0.035
2000 0.003 0.018
2001 0.000 0.019
2002 0.002 0.022
2003 0.004 0.019
2004 0.007 0.032
2005 0.002 0.015
2006 0.003 0.014
2007 0.022 0.036
2008 0.011 0.029
2009 0.004 0.022
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0219 0.0391
2 0.0215 0.0359
3 0.0132 0.0345
4 0.0109 0.0324
5 0.0108 0.0294
6 0.0106 0.0286
7 0.0091 0.0265
8 0.0088 0.0249
9 0.0080 0.0245
10 0.0068 0.0242
11 0.0056 0.0241
12 0.0049 0.0239
13 0.0047 0.0232
14 0.0044 0.0231
15 0.0041 0.0224
16 0.0041 0.0223
17 0.0040 0.0215
18 0.0037 0.0206
19 0.0033 0.0203
20 0.0031 0.0202
21 0.0030 0.0201
22 0.0030 0.0197
23 0.0029 0.0194
24 0.0027 0.0193
25 0.0027 0.0191
26 0.0027 0.0188
27 0.0026 0.0183
28 0.0024 0.0183
29 0.0023 0.0182
30 0.0023 0.0179
31 0.0023 0.0179
32 0.0022 0.0177
33 0.0021 0.0168
34 0.0020 0.0165
35 0.0020 0.0163
36 0.0019 0.0162
37 0.0018 0.0162
38 0.0017 0.0161
39 0.0015 0.0159
40 0.0015 0.0157
41 0.0014 0.0155
42 0.0013 0.0153
43 0.0013 0.0153
44 0.0012 0.0153
45 0.0012 0.0150
46 0.0011 0.0149
47 0.0010 0.0148
48 0.0009 0.0148
49 0.0008 0.0147
50 0.0005 0.0145
51 0.0005 0.0144
52 0.0004 0.0144
53 0.0004 0.0135
54 0.0004 0.0132
55 0.0002 0.0131
56 0.0001 0.0128
57 0.0001 0.0126
58 0.0001 0.0124
59 0.0000 0.0124
60 0.0000 0.0123
61 0.0000 0.0122
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0054 acre-feet
On-line facility target flow: 0.0073 cfs.
Adjusted for 15 min: 0.0073 cfs.
Off-line facility target flow: 0.0041 cfs.
Adjusted for 15 min: 0.0041 cfs.
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2017; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Sunset Court W-East SubBasin Conveyance
Site Name: Sunset Court
Site Address:
City : Renton
Report Date: 11/29/2016
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.17
Version : 2015/07/21
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .1917
Pervious Total 0.1917
Impervious Land Use Acres
Impervious Total 0
Basin Total 0.1917
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
ROOF TOPS FLAT 0.1917
Impervious Total 0.1917
Basin Total 0.1917
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.1917
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:0.1917
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.006687
5 year 0.019287
10 year 0.03034
25 year 0.045791
50 year 0.057775
100 year 0.069537
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.087465
5 year 0.110271
10 year 0.125744
25 year 0.145791
50 year 0.16112
100 year 0.176809
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.013 0.113
1950 0.035 0.122
1951 0.016 0.070
1952 0.004 0.062
1953 0.001 0.068
1954 0.010 0.071
1955 0.005 0.082
1956 0.013 0.078
1957 0.004 0.089
1958 0.004 0.073
1959 0.006 0.075
1960 0.010 0.073
1961 0.009 0.075
1962 0.000 0.066
1963 0.009 0.075
1964 0.009 0.074
1965 0.015 0.091
1966 0.004 0.061
1967 0.029 0.106
1968 0.010 0.123
1969 0.006 0.083
1970 0.001 0.081
1971 0.005 0.097
1972 0.028 0.099
1973 0.002 0.062
1974 0.007 0.090
1975 0.007 0.101
1976 0.007 0.069
1977 0.000 0.074
1978 0.003 0.095
1979 0.000 0.126
1980 0.007 0.111
1981 0.003 0.090
1982 0.018 0.127
1983 0.004 0.104
1984 0.005 0.065
1985 0.000 0.089
1986 0.006 0.078
1987 0.007 0.121
1988 0.000 0.073
1989 0.002 0.100
1990 0.069 0.153
1991 0.035 0.124
1992 0.003 0.065
1993 0.001 0.063
1994 0.000 0.064
1995 0.008 0.080
1996 0.026 0.087
1997 0.013 0.083
1998 0.004 0.085
1999 0.042 0.174
2000 0.008 0.086
2001 0.000 0.096
2002 0.008 0.109
2003 0.012 0.089
2004 0.022 0.163
2005 0.006 0.073
2006 0.011 0.065
2007 0.070 0.153
2008 0.034 0.121
2009 0.014 0.113
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.0699 0.1740
2 0.0686 0.1631
3 0.0422 0.1532
4 0.0348 0.1527
5 0.0345 0.1274
6 0.0340 0.1258
7 0.0292 0.1239
8 0.0281 0.1233
9 0.0257 0.1217
10 0.0218 0.1208
11 0.0179 0.1207
12 0.0156 0.1130
13 0.0151 0.1130
14 0.0139 0.1106
15 0.0130 0.1086
16 0.0130 0.1060
17 0.0129 0.1041
18 0.0117 0.1014
19 0.0107 0.0995
20 0.0099 0.0988
21 0.0097 0.0972
22 0.0096 0.0962
23 0.0092 0.0950
24 0.0088 0.0914
25 0.0087 0.0902
26 0.0085 0.0899
27 0.0083 0.0895
28 0.0078 0.0887
29 0.0074 0.0885
30 0.0074 0.0873
31 0.0073 0.0856
32 0.0070 0.0847
33 0.0069 0.0834
34 0.0065 0.0826
35 0.0064 0.0816
36 0.0059 0.0813
37 0.0056 0.0804
38 0.0054 0.0781
39 0.0048 0.0781
40 0.0048 0.0753
41 0.0044 0.0752
42 0.0041 0.0748
43 0.0040 0.0745
44 0.0039 0.0737
45 0.0038 0.0733
46 0.0036 0.0729
47 0.0033 0.0728
48 0.0028 0.0726
49 0.0026 0.0709
50 0.0017 0.0700
51 0.0016 0.0691
52 0.0014 0.0679
53 0.0012 0.0665
54 0.0012 0.0650
55 0.0005 0.0650
56 0.0004 0.0647
57 0.0003 0.0637
58 0.0003 0.0625
59 0.0002 0.0620
60 0.0002 0.0615
61 0.0002 0.0609
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0.0054 acre-feet
On-line facility target flow: 0.0073 cfs.
Adjusted for 15 min: 0.0073 cfs.
Off-line facility target flow: 0.0041 cfs.
Adjusted for 15 min: 0.0041 cfs.
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2016; All Rights Reserved.
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: Sunset Court W-West SubBasin Conveyance
Site Name: Renton Housing Authority
Site Address: Sunset Court
City : Renton
Report Date: 11/29/2016
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version : 2015/07/21
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin West
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .5363
Pervious Total 0.5363
Impervious Land Use Acres
ROOF TOPS FLAT 0.1
SIDEWALKS FLAT 0.17
Impervious Total 0.27
Basin Total 0.8063
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin West
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .296439
Pervious Total 0.296439
Impervious Land Use Acres
ROOF TOPS FLAT 0.327
SIDEWALKS FLAT 0.064954
Impervious Total 0.391954
Basin Total 0.688393
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Vault 1 Vault 1
___________________________________________________________________
Name : Basin Roof 3
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .0125
Pervious Total 0.0125
Impervious Land Use Acres
ROOF TOPS FLAT 0.024
SIDEWALKS FLAT 0.0025
Impervious Total 0.0265
Basin Total 0.039
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 3 Surface retention 3
___________________________________________________________________
Name : Basin Roof 2
Bypass: No
GroundWater: No
Pervious Land Use Acres
A B, Lawn, Flat .015
Pervious Total 0.015
Impervious Land Use Acres
ROOF TOPS FLAT 0.024
SIDEWALKS FLAT 0.005
Impervious Total 0.029
Basin Total 0.044
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 2 Surface retention 2
___________________________________________________________________
Name : Bioretention 3
Bottom Length: 17.50 ft.
Bottom Width: 3.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: GRAVEL
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Wetted surface area On
Total Volume Infiltrated (ac-ft): 4.405
Total Volume Through Riser (ac-ft): 0
Total Volume Through Facility (ac-ft): 4.405
Percent Infiltrated: 100
Total Precip Applied to Facility: 0.343
Total Evap From Facility: 0.107
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 3 Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs)
348.50 0.0073 0.0000 0.0000 0.0000
348.53 0.0072 0.0000 0.0000 0.0000
348.55 0.0071 0.0000 0.0001 0.0001
348.58 0.0069 0.0000 0.0003 0.0003
348.61 0.0068 0.0001 0.0007 0.0007
348.64 0.0066 0.0001 0.0012 0.0012
348.66 0.0065 0.0001 0.0019 0.0019
348.69 0.0064 0.0001 0.0028 0.0028
348.72 0.0062 0.0002 0.0038 0.0038
348.75 0.0061 0.0002 0.0039 0.0039
348.77 0.0060 0.0002 0.0041 0.0041
348.80 0.0058 0.0002 0.0043 0.0043
348.83 0.0057 0.0003 0.0045 0.0045
348.86 0.0056 0.0003 0.0047 0.0047
348.88 0.0054 0.0003 0.0049 0.0049
348.91 0.0053 0.0003 0.0051 0.0051
348.94 0.0052 0.0004 0.0053 0.0053
348.97 0.0051 0.0004 0.0055 0.0055
348.99 0.0049 0.0004 0.0057 0.0057
349.02 0.0048 0.0005 0.0059 0.0059
349.05 0.0047 0.0005 0.0061 0.0061
349.08 0.0046 0.0006 0.0063 0.0063
349.10 0.0044 0.0006 0.0065 0.0065
349.13 0.0043 0.0006 0.0067 0.0067
349.16 0.0042 0.0007 0.0069 0.0069
349.19 0.0041 0.0007 0.0071 0.0071
349.21 0.0040 0.0008 0.0073 0.0073
349.24 0.0039 0.0008 0.0076 0.0076
349.27 0.0038 0.0009 0.0078 0.0078
349.30 0.0036 0.0009 0.0080 0.0080
349.32 0.0035 0.0010 0.0083 0.0083
349.35 0.0034 0.0010 0.0085 0.0085
349.38 0.0033 0.0011 0.0087 0.0087
349.41 0.0032 0.0011 0.0090 0.0090
349.43 0.0031 0.0012 0.0092 0.0092
349.46 0.0030 0.0012 0.0094 0.0094
349.49 0.0029 0.0013 0.0097 0.0097
349.52 0.0028 0.0014 0.0099 0.0099
349.54 0.0027 0.0014 0.0102 0.0102
349.57 0.0026 0.0015 0.0104 0.0104
349.60 0.0025 0.0016 0.0107 0.0107
349.63 0.0024 0.0016 0.0110 0.0110
349.65 0.0023 0.0017 0.0112 0.0112
349.68 0.0022 0.0018 0.0115 0.0115
349.71 0.0021 0.0018 0.0117 0.0117
349.74 0.0020 0.0019 0.0120 0.0120
349.76 0.0020 0.0020 0.0123 0.0123
349.79 0.0019 0.0021 0.0126 0.0126
349.82 0.0018 0.0021 0.0128 0.0128
349.85 0.0017 0.0022 0.0131 0.0131
349.87 0.0016 0.0023 0.0134 0.0134
349.90 0.0015 0.0024 0.0137 0.0137
349.93 0.0014 0.0025 0.0140 0.0140
349.96 0.0014 0.0026 0.0143 0.0143
349.98 0.0013 0.0026 0.0145 0.0145
350.00 0.0012 0.0027 0.0147 0.0147
Surface retention 3 Hydraulic Table
Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0073 0.0027 0.0000 0.0149 0.0003
1.5275 0.0074 0.0029 0.0000 0.0149 0.0006
1.5549 0.0076 0.0031 0.0000 0.0151 0.0009
1.5824 0.0077 0.0033 0.0000 0.0154 0.0012
1.6099 0.0079 0.0035 0.0000 0.0157 0.0015
1.6374 0.0080 0.0038 0.0000 0.0159 0.0018
1.6648 0.0082 0.0040 0.0000 0.0162 0.0021
1.6923 0.0084 0.0042 0.0000 0.0165 0.0024
1.7198 0.0085 0.0044 0.0000 0.0167 0.0027
1.7473 0.0087 0.0047 0.0000 0.0170 0.0031
1.7747 0.0088 0.0049 0.0000 0.0173 0.0034
1.8022 0.0090 0.0052 0.0000 0.0175 0.0037
1.8297 0.0091 0.0054 0.0000 0.0178 0.0040
1.8571 0.0093 0.0057 0.0000 0.0181 0.0044
1.8846 0.0095 0.0059 0.0000 0.0183 0.0047
1.9121 0.0096 0.0062 0.0000 0.0186 0.0050
1.9396 0.0098 0.0064 0.0000 0.0189 0.0054
1.9670 0.0100 0.0067 0.0000 0.0191 0.0057
1.9945 0.0101 0.0070 0.0000 0.0194 0.0060
2.0220 0.0103 0.0073 0.0000 0.0197 0.0064
2.0495 0.0105 0.0076 0.0000 0.0199 0.0067
2.0769 0.0106 0.0079 0.0000 0.0202 0.0071
2.1044 0.0108 0.0081 0.0000 0.0205 0.0074
2.1319 0.0110 0.0084 0.0000 0.0207 0.0078
2.1593 0.0112 0.0087 0.0000 0.0210 0.0081
2.1868 0.0113 0.0091 0.0000 0.0213 0.0085
2.2143 0.0115 0.0094 0.0000 0.0215 0.0088
2.2418 0.0117 0.0097 0.0000 0.0218 0.0092
2.2692 0.0119 0.0100 0.0000 0.0221 0.0096
2.2967 0.0120 0.0103 0.0000 0.0223 0.0099
2.3242 0.0122 0.0107 0.0000 0.0226 0.0103
2.3516 0.0124 0.0110 0.0000 0.0229 0.0107
2.3791 0.0126 0.0114 0.0000 0.0231 0.0111
2.4066 0.0128 0.0117 0.0000 0.0234 0.0114
2.4341 0.0130 0.0121 0.0000 0.0237 0.0118
2.4615 0.0132 0.0124 0.0000 0.0239 0.0122
2.4890 0.0134 0.0128 0.0000 0.0242 0.0124
2.5000 0.0134 0.0129 0.0000 0.0243 0.0000
___________________________________________________________________
Name : Surface retention 3
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 3
___________________________________________________________________
Name : Bioretention 2
Bottom Length: 16.80 ft.
Bottom Width: 3.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Wetted surface area On
Total Volume Infiltrated (ac-ft): 4.759
Total Volume Through Riser (ac-ft): 0
Total Volume Through Facility (ac-ft): 4.759
Percent Infiltrated: 100
Total Precip Applied to Facility: 0.354
Total Evap From Facility: 0.16
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 2 Hydraulic Table
Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs)
349.00 0.0071 0.0000 0.0000 0.0000
349.03 0.0070 0.0000 0.0000 0.0000
349.05 0.0069 0.0000 0.0000 0.0000
349.08 0.0067 0.0000 0.0000 0.0000
349.11 0.0066 0.0001 0.0000 0.0000
349.14 0.0065 0.0001 0.0001 0.0001
349.16 0.0063 0.0001 0.0001 0.0001
349.19 0.0062 0.0001 0.0001 0.0001
349.22 0.0061 0.0001 0.0002 0.0002
349.25 0.0059 0.0002 0.0003 0.0003
349.27 0.0058 0.0002 0.0004 0.0004
349.30 0.0057 0.0002 0.0005 0.0005
349.33 0.0055 0.0002 0.0006 0.0006
349.36 0.0054 0.0003 0.0008 0.0008
349.38 0.0053 0.0003 0.0010 0.0010
349.41 0.0052 0.0003 0.0012 0.0012
349.44 0.0050 0.0004 0.0014 0.0014
349.47 0.0049 0.0004 0.0017 0.0017
349.49 0.0048 0.0004 0.0021 0.0021
349.52 0.0047 0.0005 0.0025 0.0025
349.55 0.0045 0.0005 0.0029 0.0029
349.58 0.0044 0.0005 0.0034 0.0034
349.60 0.0043 0.0006 0.0039 0.0039
349.63 0.0042 0.0006 0.0045 0.0045
349.66 0.0041 0.0007 0.0052 0.0052
349.69 0.0040 0.0007 0.0059 0.0059
349.71 0.0039 0.0007 0.0067 0.0067
349.74 0.0037 0.0008 0.0073 0.0073
349.77 0.0036 0.0008 0.0076 0.0076
349.80 0.0035 0.0009 0.0078 0.0078
349.82 0.0034 0.0009 0.0080 0.0080
349.85 0.0033 0.0010 0.0082 0.0082
349.88 0.0032 0.0010 0.0085 0.0085
349.91 0.0031 0.0011 0.0087 0.0087
349.93 0.0030 0.0011 0.0089 0.0089
349.96 0.0029 0.0012 0.0092 0.0092
349.99 0.0028 0.0013 0.0094 0.0094
350.02 0.0027 0.0013 0.0096 0.0096
350.04 0.0026 0.0014 0.0099 0.0099
350.07 0.0025 0.0014 0.0101 0.0101
350.10 0.0024 0.0015 0.0104 0.0104
350.13 0.0023 0.0016 0.0106 0.0106
350.15 0.0022 0.0016 0.0109 0.0109
350.18 0.0021 0.0017 0.0112 0.0112
350.21 0.0021 0.0018 0.0114 0.0114
350.24 0.0020 0.0018 0.0117 0.0117
350.26 0.0019 0.0019 0.0119 0.0119
350.29 0.0018 0.0020 0.0122 0.0122
350.32 0.0017 0.0021 0.0125 0.0125
350.35 0.0016 0.0021 0.0128 0.0128
350.37 0.0015 0.0022 0.0130 0.0130
350.40 0.0015 0.0023 0.0133 0.0133
350.43 0.0014 0.0024 0.0136 0.0136
350.46 0.0013 0.0025 0.0139 0.0139
350.48 0.0012 0.0026 0.0142 0.0142
350.50 0.0012 0.0026 0.0143 0.0143
Surface retention 2 Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0071 0.0026 0.0000 0.0143 0.0003
1.5275 0.0073 0.0028 0.0000 0.0143 0.0006
1.5549 0.0074 0.0030 0.0000 0.0145 0.0009
1.5824 0.0075 0.0032 0.0000 0.0148 0.0012
1.6099 0.0077 0.0034 0.0000 0.0150 0.0015
1.6374 0.0078 0.0036 0.0000 0.0153 0.0018
1.6648 0.0080 0.0039 0.0000 0.0155 0.0021
1.6923 0.0081 0.0041 0.0000 0.0158 0.0024
1.7198 0.0083 0.0043 0.0000 0.0161 0.0027
1.7473 0.0084 0.0045 0.0000 0.0163 0.0030
1.7747 0.0086 0.0048 0.0000 0.0166 0.0033
1.8022 0.0088 0.0050 0.0000 0.0168 0.0036
1.8297 0.0089 0.0053 0.0000 0.0171 0.0040
1.8571 0.0091 0.0055 0.0000 0.0173 0.0043
1.8846 0.0092 0.0058 0.0000 0.0176 0.0046
1.9121 0.0094 0.0060 0.0000 0.0178 0.0049
1.9396 0.0096 0.0063 0.0000 0.0181 0.0053
1.9670 0.0097 0.0065 0.0000 0.0184 0.0056
1.9945 0.0099 0.0068 0.0000 0.0186 0.0059
2.0220 0.0101 0.0071 0.0000 0.0189 0.0063
2.0495 0.0102 0.0074 0.0000 0.0191 0.0066
2.0769 0.0104 0.0076 0.0000 0.0194 0.0070
2.1044 0.0106 0.0079 0.0000 0.0196 0.0073
2.1319 0.0107 0.0082 0.0000 0.0199 0.0076
2.1593 0.0109 0.0085 0.0000 0.0202 0.0080
2.1868 0.0111 0.0088 0.0000 0.0204 0.0084
2.2143 0.0112 0.0091 0.0000 0.0207 0.0087
2.2418 0.0114 0.0094 0.0000 0.0209 0.0091
2.2692 0.0116 0.0098 0.0000 0.0212 0.0094
2.2967 0.0118 0.0101 0.0000 0.0214 0.0098
2.3242 0.0120 0.0104 0.0000 0.0217 0.0102
2.3516 0.0121 0.0107 0.0000 0.0219 0.0105
2.3791 0.0123 0.0111 0.0000 0.0222 0.0109
2.4066 0.0125 0.0114 0.0000 0.0225 0.0113
2.4341 0.0127 0.0118 0.0000 0.0227 0.0116
2.4615 0.0129 0.0121 0.0000 0.0230 0.0120
2.4890 0.0131 0.0125 0.0000 0.0232 0.0122
2.5000 0.0131 0.0126 0.0000 0.0233 0.0000
___________________________________________________________________
Name : Surface retention 2
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 2
___________________________________________________________________
Name : Vault 1
Width : 20.5 ft.
Length : 39.2 ft.
Depth: 1.86 ft.
Discharge Structure
Riser Height: 1.26 ft.
Riser Diameter: 8 in.
Orifice 1 Diameter: 2.125 in. Elevation: 0 ft.
Element Flows To:
Outlet 1 Outlet 2
___________________________________________________________________
Vault Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs)
0.0000 0.018 0.000 0.000 0.000
0.0207 0.018 0.000 0.017 0.000
0.0413 0.018 0.000 0.024 0.000
0.0620 0.018 0.001 0.030 0.000
0.0827 0.018 0.001 0.035 0.000
0.1033 0.018 0.001 0.039 0.000
0.1240 0.018 0.002 0.043 0.000
0.1447 0.018 0.002 0.046 0.000
0.1653 0.018 0.003 0.049 0.000
0.1860 0.018 0.003 0.052 0.000
0.2067 0.018 0.003 0.055 0.000
0.2273 0.018 0.004 0.058 0.000
0.2480 0.018 0.004 0.061 0.000
0.2687 0.018 0.005 0.063 0.000
0.2893 0.018 0.005 0.065 0.000
0.3100 0.018 0.005 0.068 0.000
0.3307 0.018 0.006 0.070 0.000
0.3513 0.018 0.006 0.072 0.000
0.3720 0.018 0.006 0.074 0.000
0.3927 0.018 0.007 0.076 0.000
0.4133 0.018 0.007 0.078 0.000
0.4340 0.018 0.008 0.080 0.000
0.4547 0.018 0.008 0.082 0.000
0.4753 0.018 0.008 0.084 0.000
0.4960 0.018 0.009 0.086 0.000
0.5167 0.018 0.009 0.088 0.000
0.5373 0.018 0.009 0.089 0.000
0.5580 0.018 0.010 0.091 0.000
0.5787 0.018 0.010 0.093 0.000
0.5993 0.018 0.011 0.094 0.000
0.6200 0.018 0.011 0.096 0.000
0.6407 0.018 0.011 0.098 0.000
0.6613 0.018 0.012 0.099 0.000
0.6820 0.018 0.012 0.101 0.000
0.7027 0.018 0.013 0.102 0.000
0.7233 0.018 0.013 0.104 0.000
0.7440 0.018 0.013 0.105 0.000
0.7647 0.018 0.014 0.107 0.000
0.7853 0.018 0.014 0.108 0.000
0.8060 0.018 0.014 0.110 0.000
0.8267 0.018 0.015 0.111 0.000
0.8473 0.018 0.015 0.112 0.000
0.8680 0.018 0.016 0.114 0.000
0.8887 0.018 0.016 0.115 0.000
0.9093 0.018 0.016 0.116 0.000
0.9300 0.018 0.017 0.118 0.000
0.9507 0.018 0.017 0.119 0.000
0.9713 0.018 0.017 0.120 0.000
0.9920 0.018 0.018 0.122 0.000
1.0127 0.018 0.018 0.123 0.000
1.0333 0.018 0.019 0.124 0.000
1.0540 0.018 0.019 0.125 0.000
1.0747 0.018 0.019 0.127 0.000
1.0953 0.018 0.020 0.128 0.000
1.1160 0.018 0.020 0.129 0.000
1.1367 0.018 0.021 0.130 0.000
1.1573 0.018 0.021 0.131 0.000
1.1780 0.018 0.021 0.133 0.000
1.1987 0.018 0.022 0.134 0.000
1.2193 0.018 0.022 0.135 0.000
1.2400 0.018 0.022 0.136 0.000
1.2607 0.018 0.023 0.137 0.000
1.2813 0.018 0.023 0.160 0.000
1.3020 0.018 0.024 0.200 0.000
1.3227 0.018 0.024 0.251 0.000
1.3433 0.018 0.024 0.310 0.000
1.3640 0.018 0.025 0.375 0.000
1.3847 0.018 0.025 0.444 0.000
1.4053 0.018 0.025 0.515 0.000
1.4260 0.018 0.026 0.586 0.000
1.4467 0.018 0.026 0.654 0.000
1.4673 0.018 0.027 0.717 0.000
1.4880 0.018 0.027 0.775 0.000
1.5087 0.018 0.027 0.825 0.000
1.5293 0.018 0.028 0.867 0.000
1.5500 0.018 0.028 0.901 0.000
1.5707 0.018 0.029 0.929 0.000
1.5913 0.018 0.029 0.952 0.000
1.6120 0.018 0.029 0.986 0.000
1.6327 0.018 0.030 1.011 0.000
1.6533 0.018 0.030 1.035 0.000
1.6740 0.018 0.030 1.059 0.000
1.6947 0.018 0.031 1.082 0.000
1.7153 0.018 0.031 1.105 0.000
1.7360 0.018 0.032 1.127 0.000
1.7567 0.018 0.032 1.148 0.000
1.7773 0.018 0.032 1.170 0.000
1.7980 0.018 0.033 1.191 0.000
1.8187 0.018 0.033 1.211 0.000
1.8393 0.018 0.033 1.231 0.000
1.8600 0.018 0.034 1.251 0.000
1.8807 0.018 0.034 1.270 0.000
1.9013 0.000 0.000 1.290 0.000
___________________________________________________________________
Name : Basin Roof 1
Bypass: No
GroundWater: No
Pervious Land Use Acres
Pervious Total 0
Impervious Land Use Acres
ROOF TOPS FLAT 0.014
Impervious Total 0.014
Basin Total 0.014
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Surface retention 1 Surface retention 1
___________________________________________________________________
Name : Bioretention 1
Bottom Length: 11.00 ft.
Bottom Width: 2.00 ft.
Material thickness of first layer: 1.5
Material type for first layer: SMMWW 12 in/hr
Material thickness of second layer: 0
Material type for second layer: Sand
Material thickness of third layer: 0
Material type for third layer: GRAVEL
Infiltration On
Infiltration rate: 2
Infiltration safety factor: 1
Total Volume Infiltrated (ac-ft): 2.358
Total Volume Through Riser (ac-ft): 0
Total Volume Through Facility (ac-ft): 2.358
Percent Infiltrated: 100
Total Precip Applied to Facility: 0.311
Total Evap From Facility: 0.131
Underdrain not used
Discharge Structure
Riser Height: 0.5 ft.
Riser Diameter: 6 in.
Element Flows To:
Outlet 1 Outlet 2
Vault 1
___________________________________________________________________
Bioretention 1 Hydraulic Table Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) Infilt(cfs)
0.0000 0.0051 0.0000 0.0000 0.0000
0.0275 0.0050 0.0000 0.0000 0.0000
0.0549 0.0049 0.0000 0.0000 0.0000
0.0824 0.0047 0.0000 0.0000 0.0000
0.1099 0.0046 0.0000 0.0000 0.0000
0.1374 0.0045 0.0000 0.0000 0.0000
0.1648 0.0044 0.0000 0.0000 0.0000
0.1923 0.0043 0.0001 0.0000 0.0000
0.2198 0.0042 0.0001 0.0001 0.0001
0.2473 0.0041 0.0001 0.0001 0.0001
0.2747 0.0040 0.0001 0.0001 0.0001
0.3022 0.0039 0.0001 0.0001 0.0001
0.3297 0.0038 0.0001 0.0001 0.0001
0.3571 0.0037 0.0001 0.0002 0.0002
0.3846 0.0036 0.0002 0.0002 0.0002
0.4121 0.0035 0.0002 0.0002 0.0002
0.4396 0.0034 0.0002 0.0003 0.0003
0.4670 0.0033 0.0002 0.0003 0.0003
0.4945 0.0032 0.0002 0.0004 0.0004
0.5220 0.0031 0.0003 0.0004 0.0004
0.5495 0.0030 0.0003 0.0005 0.0005
0.5769 0.0029 0.0003 0.0006 0.0006
0.6044 0.0028 0.0003 0.0006 0.0006
0.6319 0.0027 0.0003 0.0007 0.0007
0.6593 0.0026 0.0004 0.0008 0.0008
0.6868 0.0025 0.0004 0.0009 0.0009
0.7143 0.0025 0.0004 0.0010 0.0010
0.7418 0.0024 0.0004 0.0010 0.0010
0.7692 0.0023 0.0005 0.0010 0.0010
0.7967 0.0022 0.0005 0.0010 0.0010
0.8242 0.0021 0.0005 0.0010 0.0010
0.8516 0.0020 0.0006 0.0010 0.0010
0.8791 0.0020 0.0006 0.0010 0.0010
0.9066 0.0019 0.0006 0.0010 0.0010
0.9341 0.0018 0.0007 0.0010 0.0010
0.9615 0.0017 0.0007 0.0010 0.0010
0.9890 0.0017 0.0008 0.0010 0.0010
1.0165 0.0016 0.0008 0.0010 0.0010
1.0440 0.0015 0.0008 0.0010 0.0010
1.0714 0.0015 0.0009 0.0010 0.0010
1.0989 0.0014 0.0009 0.0010 0.0010
1.1264 0.0013 0.0010 0.0010 0.0010
1.1538 0.0012 0.0010 0.0010 0.0010
1.1813 0.0012 0.0011 0.0010 0.0010
1.2088 0.0011 0.0011 0.0010 0.0010
1.2363 0.0011 0.0011 0.0010 0.0010
1.2637 0.0010 0.0012 0.0010 0.0010
1.2912 0.0009 0.0013 0.0010 0.0010
1.3187 0.0009 0.0013 0.0010 0.0010
1.3462 0.0008 0.0014 0.0010 0.0010
1.3736 0.0008 0.0014 0.0010 0.0010
1.4011 0.0007 0.0015 0.0010 0.0010
1.4286 0.0007 0.0015 0.0010 0.0010
1.4560 0.0006 0.0016 0.0010 0.0010
1.4835 0.0006 0.0017 0.0010 0.0010
1.5000 0.0005 0.0017 0.0010 0.0010
Surface retention 1 Hydraulic Table
Stage(ft) Area(ac) Volume(ac-ft) Discharge(cfs) To Amended(cfs) Wetted Surface
1.5000 0.0051 0.0017 0.0000 0.0062 0.0000
1.5275 0.0052 0.0018 0.0000 0.0062 0.0000
1.5549 0.0053 0.0020 0.0000 0.0063 0.0000
1.5824 0.0054 0.0021 0.0000 0.0064 0.0000
1.6099 0.0055 0.0023 0.0000 0.0066 0.0000
1.6374 0.0057 0.0024 0.0000 0.0067 0.0000
1.6648 0.0058 0.0026 0.0000 0.0068 0.0000
1.6923 0.0059 0.0027 0.0000 0.0069 0.0000
1.7198 0.0060 0.0029 0.0000 0.0070 0.0000
1.7473 0.0062 0.0031 0.0000 0.0071 0.0000
1.7747 0.0063 0.0032 0.0000 0.0072 0.0000
1.8022 0.0064 0.0034 0.0000 0.0073 0.0000
1.8297 0.0065 0.0036 0.0000 0.0075 0.0000
1.8571 0.0067 0.0038 0.0000 0.0076 0.0000
1.8846 0.0068 0.0040 0.0000 0.0077 0.0000
1.9121 0.0070 0.0042 0.0000 0.0078 0.0000
1.9396 0.0071 0.0043 0.0000 0.0079 0.0000
1.9670 0.0072 0.0045 0.0000 0.0080 0.0000
1.9945 0.0074 0.0047 0.0000 0.0081 0.0000
2.0220 0.0075 0.0050 0.0000 0.0082 0.0000
2.0495 0.0076 0.0052 0.0000 0.0083 0.0000
2.0769 0.0078 0.0054 0.0000 0.0085 0.0000
2.1044 0.0079 0.0056 0.0000 0.0086 0.0000
2.1319 0.0081 0.0058 0.0000 0.0087 0.0000
2.1593 0.0082 0.0060 0.0000 0.0088 0.0000
2.1868 0.0084 0.0063 0.0000 0.0089 0.0000
2.2143 0.0085 0.0065 0.0000 0.0090 0.0000
2.2418 0.0087 0.0067 0.0000 0.0091 0.0000
2.2692 0.0088 0.0070 0.0000 0.0092 0.0000
2.2967 0.0090 0.0072 0.0000 0.0094 0.0000
2.3242 0.0091 0.0075 0.0000 0.0095 0.0000
2.3516 0.0093 0.0077 0.0000 0.0096 0.0000
2.3791 0.0094 0.0080 0.0000 0.0097 0.0000
2.4066 0.0096 0.0082 0.0000 0.0098 0.0000
2.4341 0.0098 0.0085 0.0000 0.0099 0.0000
2.4615 0.0099 0.0088 0.0000 0.0100 0.0000
2.4890 0.0101 0.0090 0.0000 0.0101 0.0000
2.5000 0.0101 0.0092 0.0000 0.0102 0.0000
___________________________________________________________________
Name : Surface retention 1
Element Flows To:
Outlet 1 Outlet 2
Vault 1 Bioretention 1
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:0.5363
Total Impervious Area:0.27
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.323939
Total Impervious Area:0.461454
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.105836
5 year 0.141073
10 year 0.167592
25 year 0.204912
50 year 0.235618
100 year 0.268938
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.078271
5 year 0.095445
10 year 0.107496
25 year 0.123498
50 year 0.135994
100 year 0.148994
___________________________________________________________________
Stream Protection Duration
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.136 0.087
1950 0.158 0.092
1951 0.099 0.083
1952 0.074 0.073
1953 0.080 0.072
1954 0.090 0.069
1955 0.095 0.080
1956 0.094 0.077
1957 0.106 0.087
1958 0.086 0.067
1959 0.087 0.064
1960 0.088 0.082
1961 0.091 0.073
1962 0.079 0.063
1963 0.091 0.067
1964 0.086 0.080
1965 0.113 0.073
1966 0.073 0.068
1967 0.151 0.083
1968 0.143 0.086
1969 0.099 0.072
1970 0.096 0.071
1971 0.114 0.075
1972 0.152 0.095
1973 0.072 0.066
1974 0.104 0.066
1975 0.120 0.080
1976 0.082 0.066
1977 0.088 0.070
1978 0.107 0.093
1979 0.147 0.079
1980 0.132 0.084
1981 0.108 0.083
1982 0.152 0.108
1983 0.123 0.094
1984 0.078 0.061
1985 0.107 0.080
1986 0.093 0.088
1987 0.144 0.090
1988 0.088 0.069
1989 0.109 0.066
1990 0.292 0.146
1991 0.175 0.115
1992 0.077 0.072
1993 0.067 0.054
1994 0.073 0.060
1995 0.095 0.071
1996 0.136 0.089
1997 0.111 0.082
1998 0.100 0.070
1999 0.205 0.111
2000 0.103 0.087
2001 0.112 0.069
2002 0.130 0.090
2003 0.105 0.064
2004 0.191 0.178
2005 0.088 0.084
2006 0.089 0.065
2007 0.291 0.121
2008 0.173 0.128
2009 0.133 0.092
___________________________________________________________________
Stream Protection Duration
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.2916 0.1780
2 0.2914 0.1457
3 0.2045 0.1284
4 0.1914 0.1214
5 0.1749 0.1149
6 0.1728 0.1108
7 0.1580 0.1075
8 0.1521 0.0951
9 0.1517 0.0936
10 0.1507 0.0930
11 0.1466 0.0921
12 0.1435 0.0920
13 0.1431 0.0898
14 0.1361 0.0897
15 0.1358 0.0886
16 0.1331 0.0883
17 0.1316 0.0873
18 0.1304 0.0870
19 0.1235 0.0865
20 0.1202 0.0857
21 0.1144 0.0842
22 0.1133 0.0836
23 0.1118 0.0833
24 0.1114 0.0831
25 0.1089 0.0827
26 0.1076 0.0823
27 0.1073 0.0820
28 0.1071 0.0803
29 0.1061 0.0799
30 0.1046 0.0797
31 0.1044 0.0796
32 0.1025 0.0788
33 0.0999 0.0773
34 0.0994 0.0751
35 0.0992 0.0734
36 0.0960 0.0728
37 0.0954 0.0725
38 0.0949 0.0725
39 0.0935 0.0720
40 0.0930 0.0716
41 0.0906 0.0712
42 0.0906 0.0709
43 0.0897 0.0704
44 0.0893 0.0695
45 0.0883 0.0694
46 0.0878 0.0691
47 0.0875 0.0690
48 0.0875 0.0676
49 0.0872 0.0673
50 0.0859 0.0665
51 0.0855 0.0663
52 0.0820 0.0657
53 0.0800 0.0656
54 0.0789 0.0655
55 0.0783 0.0648
56 0.0771 0.0640
57 0.0745 0.0640
58 0.0735 0.0625
59 0.0730 0.0610
60 0.0715 0.0596
61 0.0668 0.0539
___________________________________________________________________
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
___________________________________________________________________
Water Quality BMP Flow and Volume for POC #1
On-line facility volume: 0 acre-feet
On-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
Off-line facility target flow: 0 cfs.
Adjusted for 15 min: 0 cfs.
___________________________________________________________________
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2016; All Rights Reserved.
Sediment Tank Sizing Calculations
Per the 2009 KCSWDM
Project Name:Sunset Courts
Required Sediment Trap Surface Area (SA):
SA =2*Q/Vsed
Where:Q =2-year developed flow rate from WWHM for field
Vsed =Settling Velocity (0.00096 ft/sec)
Calculation:multiplier =2
Q =0.4333 cfs
Vsed =0.00096 fps
Required SA =902.7 square feet
Equivalent Sediment Trap Volume:
Length of Top Surface Area =30.5 feet
Width of Top Surface Area =30.5
Surface Area Provided =930.25 square feet
Side Slope =3 (H:1V)
Total Depth of Sediment Trap =1.5 feet
Bottom Length of Sediment Trap =21.5 feet
Bottom Width of Sediment Trap =21.5 feet
Total pond Volume =1044.375 cubic feet
7811.925 gallons
To determine the minimum sediment trap volume, an equivalent sediment
trap was sized based upon the required surface area.
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
APPENDIX C
Stormwater Pollution Prevention and Spill Plan Report
Sunset Court Apartments Page 1 TIR - SWPPS Plan & Report
LPD Engineering, PLLC November 30, 2016
SUNSET COURT APARTMENTS
STORMWATER POLLUTION PREVENTION AND SPILL PLAN REPORT
The following report is in accordance with the City of Renton 2009 Surface Water
Design Manual Amendment and the 2009 King County Surface Water Design Manual
Section 2.3.1.4 for the Stormwater Pollution Prevention and Spill (SWPPS) Plan.
The following is a summary of the items to be addressed on the TESC Plan, Sheet C1.0
of the contract documents and an indication of their applicability to this project.
PART A: ACTIVITY SPECIFIC INFORMATION REQUIRED:
Storage and Handling of Liquids:
No petroleum products, fuel, solvents, detergents, pesticides, and concrete admixtures are
expected to be stored on site. There may be small quantities of paint or form oil stored on
site during construction. They are expected to be stored in a protected area such as inside
a construction trailer, or inside a fenced enclosure in the contractor’s work area. Exact
quantities and storage locations are not known at this time.
Storage and Stockpiling of Construction Materials and Wastes:
Construction materials and waste is not expected to be stockpiled on site during this
project. They will be hauled off regularly.
Fueling:
Any fueling that occurs on site during the project will occur with a mobile fueling truck.
The following note has been added to the plan: “Fueling of construction equipment shall
be done by a mobile fuel truck and shall be allowed only in paved areas. Contractor shall
provide a plan for fueling area spill containment to the Owner’s Representative and the
City of Renton with a proposed method of secondary containment. The Owner’s
Representative and the City of Renton shall review and approve plan prior to fueling. All
spills, containment, and clean up shall be the contractors responsibility and at their own
expense.”
Maintenance, Repairs, and Storage of Vehicles and Equipment:
Equipment that requires significant repair will be removed from the site to repair. Minor
repairs or maintenance may be allowed on site only in an approved area. Refer to note 6
below for additional information.
Concrete Saw Cutting, Slurry, and Washwater Disposal:
The project may require very limited quantities of concrete sawcutting. Concrete truck
washout will not be allowed on site.
Sunset Court Apartments Page 2 TIR - SWPPS Plan & Report
LPD Engineering, PLLC November 30, 2016
Handling of pH Elevated Water:
Monitoring for elevated pH may be required with the project’s NPDES permit due to the
amount of concrete work that is proposed for field edge curbs, and for pervious concrete
walkways. If so, the project specifications will include pH monitoring requirements and
treatment.
Application of Chemicals including Pesticides and Fertilizers:
No chemicals are expected to be used in this project.
PART B: SWPPS SITE PLAN:
Refer to Sheet C1.0 of the drawings.
PART C: POLLUTION PREVENTION REPORT:
1. Liquids including petroleum products, fuel, solvents, detergents, pesticides, and
concrete admixtures are not anticipated to be stored on site. If products such as
fuel are required, these items will be brought in small quantities, used, and
removed from the site. Items such as paint or form oils, if needed, will be
delivered to the site in small quantities and stored inside a construction trailer
prior to use. A note is included on the plan as follows: “No hazardous liquid
products including but not limited to petroleum products, fuel, solvents,
detergents, paint, pesticides, concrete admixtures and form oils shall be stored on-
site without prior approval. If requested, the Contractor shall provide for spill
containment in accordance with City of Renton requirements. Contractor shall
provide a list of the types and sizes of liquids that will be stored/handled on site.
Contractor will also show the proposed location for storage on a project site plan
and will provide a proposed method of secondary containment. The Owner’s
Representative and the City shall review and approve plan prior to storage.”
2. Construction waste will require demolition of existing improvements and
structures. Any demolished material will be removed immediately upon
demolition. This project has no hazardous material to be removed. A note is
included on the plan as follows: “Construction waste shall be promptly removed
from the site and shall not be stockpiled.”
3. No stationary tanks will be used for this project. A note is included on the plan as
follows: “No stationary fuel tank shall be allowed.”
4. If required, a mobile fuel truck will be brought to the site to fuel the excavation
equipment. A note is included on the plan as follows: “Fueling of construction
equipment shall by a mobile fuel truck and shall be allowed only in paved areas.
Contractor shall provide a plan for fueling area spill containment to the Owner’s
Representative and the City of Renton with a proposed method of secondary
containment. The Owner’s Representative and the City shall review and approve
plan prior to fueling. All spills, containment, and clean up shall be the contractors
responsibility and at their own expense.”
Sunset Court Apartments Page 3 TIR - SWPPS Plan & Report
LPD Engineering, PLLC November 30, 2016
5. Equipment will only be fueled during daylight hours. A note is included on the
plan as follows: “Fueling of construction equipment shall only be allowed during
daylight hours.”
6. Equipment that requires significant repair will be removed from the site to repair.
Minor repairs or maintenance may be allowed on site only in an approved area. A
note is included on the plan as follows: “The Contractor shall remove from the
site all equipment that requires significant repair. Minor repairs or maintenance
may be allowed on site in an approved area. The Contractor shall submit a plan
for the proposed location of vehicle maintenance and repair and shall indicate the
proposed method of containment for possible leaking vehicle fluids. The
contractor shall also provide a plan to the Owner’s Representative and the City of
Renton for the collection, storage and disposal of the vehicle fluids. The Owner’s
Representative and the City shall review and approve plan prior to any on-site
maintenance.”
7. Truck Washout will not be allowed on site. A note is included on the plan as
follows: “Truck washout shall not be allowed on site. The Contractor shall
provide truck washout off-site at an approved and legal location.”
8. No chemicals are anticipated to be required for this project.
9. Selected Contractor shall provide location for spill response materials, and
identify disposal methods for contaminated water and soil after a spill. A note is
included on the plan as follows: “Contractor shall provide to the Owner’s
representative and the City of Renton the location of spill response materials.
Contractor will also identify disposal methods for contaminated water and soil
after a spill.”
10. The project will be publicly bid thus no excavation contractor is currently under
contract. Due to the limited size and scope of this project, the possible sources of
pollution are limited and are addressed above. In addition to the above
information provided on the contract documents, the following notes are included
to specifically address pollution prevention:
“The Contractor shall provide a report to the Owner’s Representative and
the City of Renton identifying the personnel responsible for pollution
prevention, including contact information, and clearly listing the
responsibilities of these personnel.”
“The Contractor shall also provide a description of the procedures to be
used in monitoring the prevention BMP and responding to the BMP
including record keeping.”
Sunset Court Apartments Page 4 TIR - SWPPS Plan & Report
LPD Engineering, PLLC November 30, 2016
PART D: SPILL PREVENTION AND CLEANUP REPORT:
Due to the public bid process an excavation contractor is not yet under contract for this
project. Spill prevention is addressed with notes on the contract documents as stated
above. Since the size and scope of this project is limited, the sources of potential spills
are very limited and have been addressed on the plan with notes. In addition to the above
information provided on the contract documents, the following notes have been added to
specifically address spill prevention:
“The Contractor shall provide a report to the Owner’s Representative and the City
of Renton identifying the personnel responsible for spill prevention, including
contact information, and clearly listing the responsibilities of these personnel.”
“The Contractor shall provide a description of the procedures to be used in
monitoring the spill prevention BMPs and responding to the BMPs, including
record keeping.”
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
APPENDIX D
Operations and Maintenance Manual
Sunset Court Apartments
Operations & Maintenance Manual
June 29, 2017
Prepared by:
Laurie J. Pfarr, PE
LPD Engineering, PLLC
1932 1st Ave S, Suite 200
Seattle, WA 98101
206.725.1211
Sunset Court Apartments Operations & Maintenance Manual
LPD Engineering, PLLC Page 1 June 12, 2017
Operations & Maintenance Manual
Project Overview
This Operations and Maintenance Manual is for Sunset Court Apartments located at1144 – 1156
Harrington Ave NE, Renton, Washington. The proposed project includes construction of four new
apartment buildings and associated improvements.
Stormwater System Overview
In summary, stormwater runoff from the proposed development will be collected in underground
conveyance pipe and routed to one of two detention facilities. Stormwater runoff from the parking
lot will pass through one of four StormFilter system (with ZPG cartridges) for water quality
treatment. The stormwater system also includes four bioretention areas for mitigation of a portion
of the new roof areas.
Each detention facility will have a designated flow control structure. Discharges from the flow
control structures will combine in an 8-inch conveyance pipe prior to leaving the site and entering
the 12-inch public storm drainage system in Harrington Ave NE.
Detention Pipe Maintenance
A 36 is diameter detention pipe with 3 associated access risers spaced at no more than 100 feet is
located along the southern and eastern boundaries of the parking lot drive aisle. Refer to the
attached maintenance requirements from Appendix A of the 2009 King County Surface Water
Design Manual (KC SWDM) for Detention Tanks and Vaults.
StormTech Chamber Maintenance
A StormTech Chamber system for detention purposes is located within the center of the
development with an approximate footprint of 20’ x 40’. Maintenance associated with the
StormTech Chamber system includes regual inspection through a manhole to inspect the isolator
row and sediment removal if sediment buildup in the isolator row has reached an average epth of 3-
inches. Inspection and maintenance guidelines for the StormTech isolator row chambers have been
included with this Operations and Maintenance Manual.
Flow Control Structure Maintenance
There are two flow control structures, one for the StomTech Chamber system at the center of the
development and one for the detention pipe beneath the parking lot. Each flow control structure
will be within a Type 2-54” diameter storm drain manhole with a solid locking lid.
The flow control structure for the StormTech Chamber system is located at the southwest corner of
the chambers. The flow control structure for the detention pipe is located at the west end of the
parking lot just south of Building 2.Refer to the attached maintenance requirements from Appendix
A of the 2009 KC SWDM for Flow Control Structures/Flow Restrictor.
Sunset Court Apartments Operations & Maintenance Manual
LPD Engineering, PLLC Page 2 June 12, 2017
Catch Basins and Manholes
Refer to the attached maintenance requirements from Appendix A of the 2009 KC SWDM for
Catch Basins and Manholes.
Conveyance Pipes
Refer to the attached maintenance requirements from Appendix A of the 2009 KC SWDM for
Conveyance Pipes.
Bioretention Area Maintenance
There are four Bioretention areas located within the development to provide flow control
mitigation for portions of the roof area from Buildings 1, 3, and 4. There is one bioretention area
located west of Building 1, a second bioretention are is located west of Building 3 and two
bioretention areas located north of Building 4. Refer to the attached maintenance requirements
from Appendix A of the 2009 KC SWDM for Biofiltration Swales and Landscaping.
StormFilter Treatment System
There are four StormFilter Treatment Systems located within the parking lot for water quality
treatment of the parking lot runoff. The Treatment systems will have 1 or 2 ZPG (Zeolite, Perlite,
and Granular activated carbon) StormFilter Cartridges. Refer to the attached maintenance
requirements from Appendix A of the 2009 KC SWDM for StormFilters.
Maintenance Responsibility
This Operations and Maintenance Manual shall be kept in the Sunset Court Apartment main office,
and a copy shall be kept at the Renton Housing Authority office. This manual must be made readily
available for inspection by City of Renton personnel.
Attachments:
Drainage Plan Sheet C2.00
Operation and Maintenance Guidelines from the 2009 Storm Management Manual
StormTech Isolator Row Inspection and Maintenance Guidelines
Sunset Court Apartments
Technical Information Report
Submitted: July 13, 2017
APPENDIX E
Bond Quantities, Facilities Summary
And Declaration of Covenant
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200••Section I: Project Information•••Section II: Bond Quantities Worksheets••Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))•Section II.b TRANSPORTATION (Street and Site Improvements)•Section II.c DRAINAGE (Drainage and Stormwater Facilities): •Section II.d WATER ‐ ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON•Section II.e SANITARY SEWER ‐ ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON••••••Section III. Bond Worksheet•This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close‐out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right‐of‐Way (ROW), Future Public Improvements and Private Improvements.The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction.Excel will auto‐calculate and auto‐populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need completing.Additional items not included in the lists can be added under the "write‐in" sections. Provide a complete description, cost estimate and unit of measure for each write‐in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount.BOND QUANTITY WORKSHEET INSTRUCTIONSThis worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close‐out approval. Submit this workbook, in its entirety, as follows:The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto‐calculate and auto‐populate from the information provided in Section I and Section II.This section includes all pertinent information for the projectSection II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR).(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close‐out submittal.This section must be completed in its entiretyInformation from this section auto‐populates to all other relevant areas of the workbookPage 1 of 14Ref 8‐H Bond Quantity WorksheetINSTRUCTIONSUnit Prices Updated: 03/2016Version: 06/2016Printed 7/13/2017
CED Permit #:UnitReference #PriceUnitQuantity CostBackfill & compaction‐embankmentESC‐16.50$ CY Check dams, 4" minus rockESC‐2SWDM 5.4.6.380.00$ Each Catch Basin ProtectionESC‐335.50$ Each10355.00Crushed surfacing 1 1/4" minusESC‐4WSDOT 9‐03.9(3)95.00$ CY DitchingESC‐59.00$ CY Excavation‐bulkESC‐62.00$ CY Fence, siltESC‐7SWDM 5.4.3.11.50$ LF300450.00Fence, Temporary (NGPE)ESC‐81.50$ LF500750.00Geotextile FabricESC‐92.50$ SY Hay Bale Silt TrapESC‐100.50$ Each HydroseedingESC‐11SWDM 5.4.2.40.80$ SY Interceptor Swale / DikeESC‐121.00$ LF Jute MeshESC‐13SWDM 5.4.2.23.50$ SY Level SpreaderESC‐141.75$ LF Mulch, by hand, straw, 3" deepESC‐15SWDM 5.4.2.12.50$ SY Mulch, by machine, straw, 2" deepESC‐16SWDM 5.4.2.12.00$ SY Piping, temporary, CPP, 6"ESC‐1712.00$ LF Piping, temporary, CPP, 8"ESC‐1814.00$ LF Piping, temporary, CPP, 12"ESC‐1918.00$ LF Plastic covering, 6mm thick, sandbaggedESC‐20SWDM 5.4.2.34.00$ SY Rip Rap, machine placed; slopesESC‐21WSDOT 9‐13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC‐22SWDM 5.4.4.11,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC‐23SWDM 5.4.4.13,200.00$ Each13,200.00Sediment pond riser assemblyESC‐24SWDM 5.4.5.22,200.00$ Each12,200.00Sediment trap, 5' high berm ESC‐25SWDM 5.4.5.119.00$ LF Sed. trap, 5' high, riprapped spillway berm section ESC‐26SWDM 5.4.5.170.00$ LF Seeding, by handESC‐27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC‐28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC‐29SWDM 5.4.2.510.00$ SY TESC SupervisorESC‐30110.00$ HR Water truck, dust controlESC‐31SWDM 5.4.7140.00$ HR UnitReference #PriceUnitQuantity Cost EROSION/SEDIMENT SUBTOTAL:6,955.00SALES TAX @ 9.5%660.73EROSION/SEDIMENT TOTAL:7,615.73(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescriptionNo.(A)WRITE‐IN‐ITEMS Page 3 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostGENERAL ITEMS Backfill & Compaction‐ embankmentGI‐16.00$ CYBackfill & Compaction‐ trenchGI‐29.00$ CYClear/Remove Brush, by hand (SY)GI‐31.00$ SYBollards ‐ fixedGI‐4 240.74$ EachBollards ‐ removableGI‐5 452.34$ EachClearing/Grubbing/Tree RemovalGI‐6 10,000.00$ AcreExcavation ‐ bulkGI‐72.00$ CYExcavation ‐ TrenchGI‐85.00$ CYFencing, cedar, 6' highGI‐9 20.00$ LFFencing, chain link, 4'GI‐10 38.31$ LFFencing, chain link, vinyl coated, 6' highGI‐11 20.00$ LFFencing, chain link, gate, vinyl coated, 20' GI‐12 1,400.00$ EachFill & compact ‐ common barrowGI‐13 25.00$ CYFill & compact ‐ gravel baseGI‐14 27.00$ CYFill & compact ‐ screened topsoilGI‐15 39.00$ CYGabion, 12" deep, stone filled mesh GI‐16 65.00$ SYGabion, 18" deep, stone filled mesh GI‐17 90.00$ SYGabion, 36" deep, stone filled meshGI‐18 150.00$ SYGrading, fine, by handGI‐19 2.50$ SYGrading, fine, with graderGI‐20 2.00$ SYMonuments, 3' LongGI‐21 250.00$ EachSensitive Areas SignGI‐22 7.00$ EachSodding, 1" deep, sloped groundGI‐23 8.00$ SYSurveying, line & gradeGI‐24 850.00$ DaySurveying, lot location/linesGI‐25 1,800.00$ AcreTopsoil Type A (imported)GI‐26 28.50$ CYTraffic control crew ( 2 flaggers )GI‐27 120.00$ HRTrail, 4" chipped woodGI‐28 8.00$ SYTrail, 4" crushed cinderGI‐29 9.00$ SYTrail, 4" top courseGI‐30 12.00$ SYConduit, 2"GI‐31 5.00$ LFWall, retaining, concreteGI‐32 55.00$ SFWall, rockeryGI‐33 15.00$ SFSUBTOTAL THIS PAGE:(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)Page 4 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI‐1 30.00$ SYAC Grinding, 4' wide machine 1000‐2000sy RI‐2 16.00$ SYAC Grinding, 4' wide machine > 2000syRI‐3 10.00$ SYAC Removal/DisposalRI‐4 35.00$ SY 1605,600.005880205,800.00Barricade, Type III ( Permanent )RI‐5 56.00$ LFGuard RailRI‐6 30.00$ LFCurb & Gutter, rolledRI‐7 17.00$ LF801,360.00Curb & Gutter, verticalRI‐8 12.50$ LF 2603,250.0081610,200.00Curb and Gutter, demolition and disposal RI‐9 18.00$ LF 1122,016.00Curb, extruded asphaltRI‐10 5.50$ LFCurb, extruded concreteRI‐11 7.00$ LFSawcut, asphalt, 3" depthRI‐12 1.85$ LF 403745.55Sawcut, concrete, per 1" depthRI‐13 3.00$ LFSealant, asphaltRI‐14 2.00$ LFShoulder, gravel, 4" thickRI‐15 15.00$ SYSidewalk, 4" thickRI‐16 38.00$ SY 762,888.001292.249,104.44Sidewalk, 4" thick, demolition and disposal RI‐17 32.00$ SY 2457,840.00Sidewalk, 5" thickRI‐18 41.00$ SYSidewalk, 5" thick, demolition and disposal RI‐19 40.00$ SYSign, Handicap RI‐20 85.00$ Each3255.00Striping, per stallRI‐21 7.00$ Each50350.00Striping, thermoplastic, ( for crosswalk )RI‐22 3.00$ SFStriping, 4" reflectorized lineRI‐23 0.50$ LFAdditional 2.5" Crushed SurfacingRI‐24 3.60$ SYHMA 1/2" Overlay 1.5" RI‐25 14.00$ SYHMA 1/2" Overlay 2"RI‐26 18.00$ SYHMA Road, 2", 4" rock, First 2500 SYRI‐27 28.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SY RI‐28 21.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI‐29 45.00$ SY 1607,200.00HMA Road, 4", 6" rock, Qty. over 2500 SY RI‐30 37.00$ SYHMA Road, 4", 4.5" ATBRI‐31 38.00$ SYGravel Road, 4" rock, First 2500 SYRI‐32 15.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI‐33 10.00$ SYThickened EdgeRI‐34 8.60$ LFSUBTOTAL THIS PAGE:29,539.55267,069.44(B)(C)(D)(E)Page 5 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)PARKING LOT SURFACING No.2" AC, 2" top course rock & 4" borrowPL‐1 21.00$ SY14076295,596.002" AC, 1.5" top course & 2.5" base course PL‐2 28.00$ SY4" select borrowPL‐35.00$ SY1.5" top course rock & 2.5" base coursePL‐4 14.00$ SYSUBTOTAL PARKING LOT SURFACING:295,596.00(B)(C)(D)(E)LANDSCAPING & VEGETATION No.Street TreesLA‐1Median LandscapingLA‐2Right‐of‐Way LandscapingLA‐3Wetland LandscapingLA‐4SUBTOTAL LANDSCAPING & VEGETATION:(B)(C)(D)(E)TRAFFIC & LIGHTING No.SignsTR‐1Street Light System ( # of Poles)TR‐2Traffic SignalTR‐3Traffic Signal ModificationTR‐4SUBTOTAL TRAFFIC & LIGHTING:(B)(C)(D)(E)WRITE‐IN‐ITEMSGEOBLOCK20.00$ sf58011,600.00Permeable asphalt35.00$ sy29210,220.00Permeable concrete sidewalk/pavers10.00$ sf10985109,850.00SUBTOTAL WRITE‐IN ITEMS:131,670.00STREET AND SITE IMPROVEMENTS SUBTOTAL:29,539.55398,739.44SALES TAX @ 9.5%2,806.2637,880.25STREET AND SITE IMPROVEMENTS TOTAL:32,345.81436,619.69(B)(C)(D)(E)Page 6 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/D D‐1 26.00$ SY* (CBs include frame and lid)Beehive D‐2 90.00$ EachThrough‐curb Inlet Framework D‐3 400.00$ EachCB Type ID‐4 1,500.00$ Each 2233,000.00CB Type IL D‐5 1,750.00$ EachCB Type II, 48" diameter D‐6 2,300.00$ Each 716,100.00 for additional depth over 4' D‐7 480.00$ FT 73,360.00CB Type II, 54" diameterD‐82,500.00$ Each for additional depth over 4'D‐9 495.00$ FTCB Type II, 60" diameterD‐10 2,800.00$ Each for additional depth over 4'D‐11 600.00$ FTCB Type II, 72" diameterD‐12 6,000.00$ Each for additional depth over 4'D‐13 850.00$ FTCB Type II, 96" diameterD‐14 14,000.00$ Each for additional depth over 4'D‐15 925.00$ FTTrash Rack, 12"D‐16 350.00$ EachTrash Rack, 15"D‐17 410.00$ EachTrash Rack, 18"D‐18 480.00$ EachTrash Rack, 21"D‐19 550.00$ EachCleanout, PVC, 4"D‐20 150.00$ Each4600.00Cleanout, PVC, 6"D‐21 170.00$ EachCleanout, PVC, 8"D‐22 200.00$ Each255,000.00Culvert, PVC, 4" (Not allowed in ROW)D‐23 10.00$ LF 3003,000.00Culvert, PVC, 6" (Not allowed in ROW)D‐24 13.00$ LFCulvert, PVC, 8" (Not allowed in ROW)D‐25 15.00$ LF 72510,875.00Culvert, PVC, 12" (Not allowed in ROW)D‐26 23.00$ LFCulvert, PVC, 15" (Not allowed in ROW)D‐27 35.00$ LFCulvert, PVC, 18" (Not allowed in ROW)D‐28 41.00$ LFCulvert, PVC, 24" (Not allowed in ROW)D‐29 56.00$ LFCulvert, PVC, 30" (Not allowed in ROW)D‐30 78.00$ LFCulvert, PVC, 36" (Not allowed in ROW)D‐31 130.00$ LFCulvert, CMP, 8" D‐32 19.00$ LFCulvert, CMP, 12" D‐33 29.00$ LFSUBTOTAL THIS PAGE:71,935.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Page 7 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, CMP, 15" D‐34 35.00$ LFCulvert, CMP, 18" D‐35 41.00$ LFCulvert, CMP, 24" D‐36 56.00$ LFCulvert, CMP, 30" D‐37 78.00$ LFCulvert, CMP, 36" D‐38 130.00$ LFCulvert, CMP, 48" D‐39 190.00$ LFCulvert, CMP, 60" D‐40 270.00$ LFCulvert, CMP, 72" D‐41 350.00$ LFCulvert, Concrete, 8"D‐42 42.00$ LFCulvert, Concrete, 12"D‐43 48.00$ LFCulvert, Concrete, 15" D‐44 78.00$ LFCulvert, Concrete, 18"D‐45 48.00$ LFCulvert, Concrete, 24"D‐46 78.00$ LFCulvert, Concrete, 30"D‐47 125.00$ LFCulvert, Concrete, 36"D‐48 150.00$ LFCulvert, Concrete, 42"D‐49 175.00$ LFCulvert, Concrete, 48"D‐50 205.00$ LFCulvert, CPE, 6" (Not allowed in ROW)D‐51 14.00$ LFCulvert, CPE, 8" (Not allowed in ROW)D‐52 16.00$ LFCulvert, CPE, 12" (Not allowed in ROW)D‐53 24.00$ LFCulvert, CPE, 15" (Not allowed in ROW)D‐54 35.00$ LFCulvert, CPE, 18" (Not allowed in ROW)D‐55 41.00$ LFCulvert, CPE, 24" (Not allowed in ROW)D‐56 56.00$ LFCulvert, CPE, 30" (Not allowed in ROW)D‐57 78.00$ LFCulvert, CPE, 36" (Not allowed in ROW)D‐58 130.00$ LFCulvert, LCPE, 6" D‐59 60.00$ LFCulvert, LCPE, 8" D‐60 72.00$ LFCulvert, LCPE, 12" D‐61 84.00$ LFCulvert, LCPE, 15" D‐62 96.00$ LFCulvert, LCPE, 18" D‐63 108.00$ LFCulvert, LCPE, 24" D‐64 120.00$ LFCulvert, LCPE, 30" D‐65 132.00$ LFCulvert, LCPE, 36" D‐66 144.00$ LFCulvert, LCPE, 48" D‐67 156.00$ LFCulvert, LCPE, 54" D‐68168.00$ LFSUBTOTAL THIS PAGE:(B)(C)(D)(E)Page 8 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, LCPE, 60" D‐69 180.00$ LFCulvert, LCPE, 72" D‐70 192.00$ LFCulvert, HDPE, 6" D‐71 42.00$ LFCulvert, HDPE, 8" D‐72 42.00$ LF 55023,100.00Culvert, HDPE, 12" D‐73 74.00$ LFCulvert, HDPE, 15" D‐74 106.00$ LFCulvert, HDPE, 18" D‐75 138.00$ LFCulvert, HDPE, 24" D‐76 221.00$ LFCulvert, HDPE, 30" D‐77 276.00$ LFCulvert, HDPE, 36" D‐78 331.00$ LFCulvert, HDPE, 48" D‐79 386.00$ LFCulvert, HDPE, 54" D‐80 441.00$ LFCulvert, HDPE, 60" D‐81 496.00$ LFCulvert, HDPE, 72" D‐82 551.00$ LFPipe, Polypropylene, 6" D‐83 84.00$ LF 373,108.00Pipe, Polypropylene, 8" D‐84 89.00$ LFPipe, Polypropylene, 12" D‐85 95.00$ LFPipe, Polypropylene, 15" D‐86 100.00$ LFPipe, Polypropylene, 18" D‐87 106.00$ LFPipe, Polypropylene, 24" D‐88 111.00$ LFPipe, Polypropylene, 30" D‐89 119.00$ LFPipe, Polypropylene, 36" D‐90 154.00$ LFPipe, Polypropylene, 48" D‐91 226.00$ LFPipe, Polypropylene, 54" D‐92 332.00$ LFPipe, Polypropylene, 60" D‐93 439.00$ LFPipe, Polypropylene, 72" D‐94 545.00$ LFCulvert, DI, 6" D‐95 61.00$ LFCulvert, DI, 8" D‐96 84.00$ LF 37531,500.00Culvert, DI, 12" D‐97 106.00$ LFCulvert, DI, 15" D‐98 129.00$ LFCulvert, DI, 18"D‐99 152.00$ LFCulvert, DI, 24"D‐100 175.00$ LFCulvert, DI, 30"D‐101 198.00$ LFCulvert, DI, 36"D‐102 220.00$ LFCulvert, DI, 48"D‐103 243.00$ LFCulvert, DI, 54"D‐104 266.00$ LFCulvert, DI, 60"D‐105 289.00$ LFCulvert, DI, 72"D‐106 311.00$ LFSUBTOTAL THIS PAGE:3,108.0054,600.00(B)(C)(D)(E)Page 9 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Specialty Drainage ItemsDitching SD‐19.50$ CYFlow Dispersal Trench (1,436 base+)SD‐3 28.00$ LF French Drain (3' depth)SD‐4 26.00$ LFGeotextile, laid in trench, polypropylene SD‐53.00$ SYMid‐tank Access Riser, 48" dia, 6' deep SD‐6 2,000.00$ Each36,000.00Pond Overflow SpillwaySD‐7 16.00$ SYRestrictor/Oil Separator, 12"SD‐8 1,150.00$ EachRestrictor/Oil Separator, 15"SD‐9 1,350.00$ EachRestrictor/Oil Separator, 18"SD‐10 1,700.00$ EachRiprap, placedSD‐11 42.00$ CYTank End Reducer (36" diameter)SD‐12 1,200.00$ EachInfiltration pond testingSD‐13 125.00$ HRPermeable PavementSD‐14Permeable Concrete SidewalkSD‐15Culvert, Box __ ft x __ ftSD‐16SUBTOTAL SPECIALTY DRAINAGE ITEMS:6,000.00(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention Pond SF‐1Each Detention Tank SF‐2 32,000.00$ Each 132,000.00Detention Vault SF‐3Each Infiltration Pond SF‐4Each Infiltration Tank SF‐5Each Infiltration Vault SF‐6Each Infiltration Trenches SF‐7Each Basic Biofiltration Swale SF‐8Each Wet Biofiltration Swale SF‐9Each Wetpond SF‐10 Each Wetvault SF‐11 Each Sand Filter SF‐12 Each Sand Filter Vault SF‐13 Each Linear Sand Filter SF‐14 Each StormFilter SF‐15 9,000.00$ Each 436,000.00Rain GardenSF‐16 5,200.00$ Each 315,600.00SUBTOTAL STORMWATER FACILITIES:83,600.00(B)(C)(D)(E)Page 10 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)WRITE‐IN‐ITEMSStormTech Chambers WI‐1 15,500.00$ Each 115,500.00Perforated Pipe 4" WI‐2 12.00$ LF220026,400.00WI‐3WI‐4WI‐5WI‐6WI‐7WI‐8WI‐9WI‐10WI‐11WI‐12WI‐13WI‐14WI‐15SUBTOTAL WRITE‐IN ITEMS:41,900.00DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:203,435.00SALES TAX @ 9.5%19,326.33DRAINAGE AND STORMWATER FACILITIES TOTAL:222,761.33(B)(C)(D)(E)Page 11 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostConnection to Existing WatermainW‐1 2,000.00$ Each24,000.00Ductile Iron Watermain, CL 52, 4 Inch Diameter W‐2 50.00$ LFDuctile Iron Watermain, CL 52, 6 Inch Diameter W‐3 56.00$ LFDuctile Iron Watermain, CL 52, 8 Inch Diameter W‐4 60.00$ LFDuctile Iron Watermain, CL 52, 10 Inch Diameter W‐5 70.00$ LFDuctile Iron Watermain, CL 52, 12 Inch Diameter W‐6 80.00$ LF 90372,240.00Gate Valve, 4 inch DiameterW‐7 500.00$ EachGate Valve, 6 inch DiameterW‐8 700.00$ EachGate Valve, 8 Inch DiameterW‐9 800.00$ EachGate Valve, 10 Inch DiameterW‐10 1,000.00$ EachGate Valve, 12 Inch DiameterW‐11 1,200.00$ Each 44,800.0044,800.00Fire Hydrant AssemblyW‐12 4,000.00$ Each312,000.0014,000.00Permanent Blow‐Off AssemblyW‐13 1,800.00$ Each23,600.00Air‐Vac Assembly, 2‐Inch DiameterW‐14 2,000.00$ Each48,000.00Air‐Vac Assembly, 1‐Inch DiameterW‐15 1,500.00$ EachCompound Meter Assembly 3‐inch Diameter W‐16 8,000.00$ EachCompound Meter Assembly 4‐inch Diameter W‐17 9,000.00$ EachCompound Meter Assembly 6‐inch Diameter W‐18 10,000.00$ EachPressure Reducing Valve Station 8‐inch to 10‐inch W‐19 20,000.00$ EachWATER SUBTOTAL:4,800.00 24,400.00 84,240.00SALES TAX @ 9.5%456.002,318.008,002.80WATER TOTAL:5,256.0026,718.0092,242.80(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 12 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
CED Permit #:ExistingFuture PublicPrivateRight‐of‐WayImprovementsImprovements(D) (E)DescriptionNo. Unit Price Unit Quant. Cost Quant. Cost Quant. Cost Quant. CostClean OutsSS‐1 1,000.00$ Each55,000.00Grease Interceptor, 500 gallonSS‐2 8,000.00$ EachGrease Interceptor, 1000 gallonSS‐3 10,000.00$ EachGrease Interceptor, 1500 gallonSS‐4 15,000.00$ EachSide Sewer Pipe, PVC. 4 Inch DiameterSS‐5 80.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS‐6 95.00$ LF36334,485.00Sewer Pipe, PVC, 8 inch DiameterSS‐7 105.00$ LF12112,705.00Sewer Pipe, PVC, 12 Inch DiameterSS‐8 120.00$ LFSewer Pipe, DI, 8 inch DiameterSS‐9 115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS‐10 130.00$ LFManhole, 48 Inch DiameterSS‐11 6,000.00$ Each 16,000.00212,000.00Manhole, 54 Inch DiameterSS‐13 6,500.00$ EachManhole, 60 Inch DiameterSS‐15 7,500.00$ EachManhole, 72 Inch DiameterSS‐17 8,500.00$ EachManhole, 96 Inch DiameterSS‐19 14,000.00$ EachPipe, C‐900, 12 Inch DiameterSS‐21 180.00$ LFOutside DropSS‐24 1,500.00$ LSInside DropSS‐25 1,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS‐26Lift Station (Entire System)SS‐27LSSANITARY SEWER SUBTOTAL:6,000.0064,190.00SALES TAX @ 9.5%570.006,098.05SANITARY SEWER TOTAL:6,570.0070,288.05(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 13 of 14Ref 8‐H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430‐7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal(a)(a)7,615.73$ Existing Right‐of‐Way Improvements Subtotal (b) (b)44,171.81$ Future Public Improvements Subtotal (c) (c)26,718.00$ Stormwater & Drainage Facilities Subtotal (d) (d)222,761.33$ Bond Reduction (Quantity Remaining)2(e)(e)‐$ Site RestorationCivil Construction PermitMaintenance Bond58,730.23$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only ‐ May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. T(P +R ‐ S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)206‐725‐1211lauriep@lpdengineering.comSunset Court ApartmentsLUA16‐000068,SA‐A, V‐A1144‐1158 Harrington Ave NE7227801781, 7227801660, 7227801665, 7227801780FOR APPROVAL 1932 1st Ave, Suite 200451,900.29$ P (a) x 150%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS11/30/2016Laurie Pfarr30766LPD EngineeringR((b)+(c)+(d)) x 150%EST1((b) + (c) + (d)) x 20%‐$ MAINTENANCE BOND */**(after final acceptance of construction)7,615.73$ 44,171.81$ 440,476.70$ 11,423.59$ ‐$ 26,718.00$ 222,761.33$ S(e) x 150%Page 14 of 14Ref 8‐H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 06/14/2016Printed 7/13/2017