Loading...
HomeMy WebLinkAboutConstructionPermit_U16006459_Issued.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Construcon Permit: U16006459 IVR Number: 16006459 Permit Informaon Permit Name:Sunset Court Apartments Address/Locaon :12/06/2016Applicaon Date :7227801660Parcel Number:1144 HARRINGTON AVE NE Permit Type:07/14/2017Issue Date:Engineering Permit Work Class:07/16/2018Expiraon Date :Construc&on Plan Reviewer:Ann Fowler 425-430-7382 Descripon:Sunset Court Apartments Installa&on of Water, Wastewater, Stormwater and frontage improvements. Condi&ons of Approval as noted on separate sheet. Contacts Name Address PhoneTypeBilling Mark Gropper Renton Housing Authority PO Box 2316 Renton, WA 98056 B: (425) 226-8451Applicant Margaret Tyson Schemata Workshop Inc 1720 12th Ave, Suite 3 Sea<le, WA 98122 B: (206) 285-1589 C: (206) 683-2031 O: (206) 795-2470 Contact Jonathan Wilson City of Renton 1055 S Grady Way Renton, WA 98057 B: (425) 430-7477Owner Sunset Court LLLP 2900 NE 10th St Renton, WA 98056 H: (425) 226-1850OwnerX General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 ) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES