HomeMy WebLinkAboutConstructionPermit_U16006459_Issued.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construcon Permit: U16006459
IVR Number: 16006459
Permit Informaon
Permit Name:Sunset Court Apartments
Address/Locaon :12/06/2016Applicaon Date :7227801660Parcel Number:1144 HARRINGTON AVE NE
Permit Type:07/14/2017Issue Date:Engineering
Permit Work Class:07/16/2018Expiraon Date :Construc&on
Plan Reviewer:Ann Fowler 425-430-7382
Descripon:Sunset Court Apartments Installa&on of Water, Wastewater, Stormwater and frontage improvements.
Condi&ons of Approval as noted on separate sheet.
Contacts
Name Address PhoneTypeBilling
Mark Gropper
Renton Housing Authority
PO Box 2316
Renton, WA 98056
B: (425) 226-8451Applicant
Margaret Tyson
Schemata Workshop Inc
1720 12th Ave, Suite 3
Sea<le, WA 98122
B: (206) 285-1589
C: (206) 683-2031
O: (206) 795-2470
Contact
Jonathan Wilson
City of Renton
1055 S Grady Way
Renton, WA 98057
B: (425) 430-7477Owner
Sunset Court LLLP 2900 NE 10th St
Renton, WA 98056
H: (425) 226-1850OwnerX
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for
ANY work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES