HomeMy WebLinkAboutSNP1-ProjectedCPMSchedule.pdftO Task Name Duration
1 ProjectStafl-Up 52 days
-2 ContractAward 24 days
3 Sabwisals &Shop Drawings 25 days
-4 Pro-Coostwdiov Meelisg 1 day
Utility
Locates 2 days
S Notico to Proceed t day
7 Mobilization I Staging Area Sot-Up 2days
-Survey &Layoal d days
Construction Field Activities
11 TrafficCoolmI (Cc-Doing as Nneded(
12 --Erosion Conlwl Deywos I Relocate Temp.Cocslmctioo Fooco
13 Polholo for Eoisling Uliltins
14 Stdp Silo,Stockprln,Load,Haol &Dispose
15 Earthwork lOnsito Cullo rile
16 Cut,Load,Haul &Dispose Sarplas Matodal
17 Install Sonilary SnwocPipo &Slractorns
18 Install Storm Pipe,Pwcch Draic,Roof Draic &Stwcturns
19 lcslall Water Service Pipe
20 Finn Dradn &Prep Building Pads
21 -Solid Rnslroows &Pergola Slwclcrn
22 lcsluIl Electrical Conduit,JunctionGoons &Gases
23 -Pine Sradn Landscape Slopos &Walkways
24 Prep.Ponn &Poor Mow Slnps &Pednstdon Card
-—2S1 Prep,Pawn &Pour Peroloas,Scared and Concwtn Walkway
26 j trnigatroc Sysrnw
27 -Topsoil,Landscape,Planlings,Sod &Sending
26 ParS Awncdlds /Bnschns,Trash Rncnptados,Goltards,ntc/
2g -Install lltawrnation Pates &Piolorns
35 Install Concrnln Entry Sign &Sgnagn
31
32 Project Closeout 7 days Thu 1211117 Fri 12115117
33 SUBSTANTIAL Completion I Project Walh-Thvr 2 days Thu 1211117 Fe 1216117
34 Punchlist 2 days Pd 1216117 Mon 12)11/17
36 Final Cleao-ap &Dnworlrzalioo h days Mon 12111/17 Pd 12/15/17
CITY DF RENTON PROJECTED SCHEDULECONTRACTND
ENGINEER:CH2M CITY OF RENTON
SUNSET NEIGHBORHOOD PARK,PHASE 1
Juno -July Aagast .SnplewWr 000Wr Nonnwonr Uncewonr -Janaary FnSwStartiFinish5/7 5/14501505 6/4 6/116/166/257/2 7/9 -7/1671237130 S/b 6/139/200079/3 9/109/179/241S/11SIO 5/1 0/2 00 11/h-1/1 1/1 1/2 12/3 211:211 2)2!20 -1/7 1/141/21i1/2t2/4
Wed 5115117 Moo 7/24/17 Project Stats-Up
Wed 5110/17 Ton6113117 [-Contract Award
Moo 6/15117 Mon 7/24117 I Subminals &Shop Drawings
Tan 600/17 Ton600/17 LwJ_eacooutnaction Meetiog
Mon 70/17 Wed 7/9/17 —Utility Locates
Wnd 7/5/17 Wed 7/5/17 J’dotice to Proceed
Wed 7IgII7 Tho 716117 Mohilinalion I Staging Area Set-Up
Wod 7/5/17 Mon 7/10/17 Survey &Layout
156 days
106 days
4 days
2 days
days
5 days
6 days
4 days
6 days
2 dags
2 days
65 dags
IS dogs
15 days
20 days
30 days
15 days
25 days
15 days
10 days
5 days
Wed 7/0/17 Wed 1215(17
Wed 7/5/17 Wed 12/6/17
Wed 7/5/17 Mon 7/I0/17
Thu 7/6117 P67/7/17
P67/7/17 Tho7/13/17:
Wed 7/12/17 Wed 7/19/17 -
Tan 7/I 0/17 Tue 7/25/17 -
Mon 7/24/17 Tho 7/27/17
Wnd 7/26/17 Wed 0/2/17
Wed 8/2117 Tha 8/3/17
Tha 8/3/17 Pv 8/4/17
P68/4/17 P6110/17
Tue 8/8/17 Mon 8125(17
Ton 502117 Tun 9I5/17
P69/1/17 Fit 909/17
Mon 9/10/17 Fit 1007/17
Tan 10/17/17 Moo 11/6/17
Tan 10/31/17 Wed 12/6/17
Tan 11/7/17 Wed 11/25/17
Toe 11/21/17 Wed 12/6/17
ma 11/30/17 Wed 12/6/17
--TraWc controt (On-Goingas Nnednd(
Erosion control Denices /Relocate Temp.Construction Pence
[frrLpotholn for Eoisting Utilities
‘‘J-lrip Site,Stockpile,Load,Haul &Disposo
Earthwork /Onsite cutto Pun
cat,Load,Haul &Dispose Surplus Material
Install Sanitary SewerPipo &Structurns
lootall Storm Pipe,French Drain,Roof Drain &Strnctnres -
RInstall Water Service Pipe
11tinn Grade &Prep Building Pads
L.._
_________
-Build Rostruumu-&Pergolu Structure
LIosull Electrical Couduit,Junctino Goons 6,Buses --
Grade Landscape Slopes &Walkways -
[j HPrep,Form &Pour Mow Strips &Pedestrian curb
[-PmP.Form &Pour Pemlous,Snomd and concreteWalkway
-Irrigation System H
fr Topsoil,Landscapn,Plantings,Sod &S
I Amenities (Beechns,Trash Receptacle
-‘LlnsraIl Illumination Poles &natures
iLJlnstulI concrete Eutry Sign &Signage
Projectcloseout
r.2/5TANTIAL Completion /Project W
irlunchlisl
Li Pisul Cteae-up &Dewoilizution
Task Mrlcsl000 Rolled Up Cdtical Tusk
_________________
Split Droop By Samwury VPm/ed:RENTON-SUNSET PARK Critical Tush
-
Summary V V Rolled Up Milostocc 0 Eotewal TusksDate:Tue 6/20/17
Progress Rolled Up Task Rolled Up Pwgress Projoct Suwmary V
ROAD CONSTRUCTION NORTHWEST,INC.ORIGINAL DATED-6/20/2017
P.0,BOX 2280,RENTON,WA 98056
PHONE:(425)254-9999 FAX:(425)254-1334