Loading...
HomeMy WebLinkAbout180328_VMC Medical Office Building_Northwest Fire Hydrant Revision.pdfWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWapproval notes:1. hydrant to be tied to tee per corstd. plan 310.1.2. hydrant valve shall be locatedoutside of new curb line. curb linemodification may be required.DEVELOPMENT ENGINEERINGIFitz-James 03/28/2018approval notes:1. hydrant to be tied to valve per corstd. plan 310.1.2. hydrant valve shall be locatedoutside of new curb line. curb linemodification may be required.