Loading...
HomeMy WebLinkAboutSouthport -- TENW Revision 3 Chan Signal - stamp approved after permit issuance 20190207.pdf16+0017+0018+0019+00199+50200+00198+50199+0015+0015+5016+5017+5018+50PAVEMENT MARKING PLANTENWTransportation Planning | Design | Traffic Impact & Operations11400 SE 8th Street, Suite 200, Bellevue, WA 98004Office (425) 889-6747Transportation Engineering NorthWestProject Contact: Elyse Stemmler, P.E.Phone: 425-250-5004IN COMPLIANCE WITH CITY OF RENTON STANDARDSTRO 41-4005 LAKE WA BLVD IMPROVEMENTSPHASE III FOR SOUTHPORT DEVELOPMENT1083 LAKE WASHINGTON BLVD NRENTON, WA 98055LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT LUA: 00-156 C: 17-004398 LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT PR: 14-000082 10-01-2018 T-400501TOW-AWAYZONEHouser WayLk. Wash. Blvd.20MPHOVER26,000 LBS(GROSS VEH. WT)EXCEPT LOCALDELIVERIESBIKE ROUTEMUSTLEFT LANETURN LEFTSouthportOnlyLk. Wash.Blvd. andHouser WayONLYONLYGene CoulonPark andSouthportTRANSPORTATION OPERATIONcbarnes 02/07/2019CURRENT PLANNINGClark Close 02/07/2019DEVELOPMENT ENGINEERINGrnair 02/07/2019 10+00 11+0012+0011+5013+0014+0014+5010+5012+5013+50·TENWTransportation Planning | Design | Traffic Impact & Operations11400 SE 8th Street, Suite 200, Bellevue, WA 98004Office (425) 889-6747Transportation Engineering NorthWestProject Contact: Elyse Stemmler, P.E.Phone: 425-250-5004IN COMPLIANCE WITH CITY OF RENTON STANDARDSTRO 41-4005 LAKE WA BLVD IMPROVEMENTSPHASE III FOR SOUTHPORT DEVELOPMENT1083 LAKE WASHINGTON BLVD NRENTON, WA 98055LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT LUA: 00-156 C: 17-004398 LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT PR: 14-000082 10-01-2018 PAVEMENT MARKING PLANT-400502TRANSPORTATION OPERATIONcbarnes 02/07/2019CURRENT PLANNINGClark Close 02/07/2019DEVELOPMENT ENGINEERINGrnair 02/07/2019 16+0017+00199+50200+00198+50199+0014+0014+5015+0015+5016+5017+50TENWTransportation Planning | Design | Traffic Impact & Operations11400 SE 8th Street, Suite 200, Bellevue, WA 98004Office (425) 889-6747Transportation Engineering NorthWestProject Contact: Elyse Stemmler, P.E.Phone: 425-250-5004IN COMPLIANCE WITH CITY OF RENTON STANDARDSTRO 41-4005 LAKE WA BLVD IMPROVEMENTSPHASE III FOR SOUTHPORT DEVELOPMENT1083 LAKE WASHINGTON BLVD NRENTON, WA 98055LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT LUA: 00-156 C: 17-004398 LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT PR: 14-000082 10-01-2018 TRAFFIC SIGNAL PLANT-400505······SouthportOnlyONLYONLYGene CoulonPark andSouthportTRANSPORTATION OPERATIONcbarnes 02/07/2019CURRENT PLANNINGClark Close 02/07/2019DEVELOPMENT ENGINEERINGrnair 02/07/2019 TENWTransportation Planning | Design | Traffic Impact & Operations11400 SE 8th Street, Suite 200, Bellevue, WA 98004Office (425) 889-6747Transportation Engineering NorthWestProject Contact: Elyse Stemmler, P.E.Phone: 425-250-5004IN COMPLIANCE WITH CITY OF RENTON STANDARDSTRO 41-4005 LAKE WA BLVD IMPROVEMENTSPHASE III FOR SOUTHPORT DEVELOPMENT1083 LAKE WASHINGTON BLVD NRENTON, WA 98055LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT LUA: 00-156 C: 17-004398 LAKE WASHINGTON BOULEVARD IMPROVEMENTS - PHASE III FOR SOUTHPORT DEVELOPMENT PR: 14-000082 10-01-2018 TRAFFIC SIGNAL POLE SCHEDULET-400508TRANSPORTATION OPERATIONcbarnes 02/07/2019CURRENT PLANNINGClark Close 02/07/2019DEVELOPMENT ENGINEERINGrnair 02/07/2019